ML20071P461
| ML20071P461 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 08/03/1994 |
| From: | PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | |
| Shared Package | |
| ML20071P450 | List: |
| References | |
| NUDOCS 9408090332 | |
| Download: ML20071P461 (3) | |
Text
-
1 1
ATTACHMENT 2 PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 Docket Nos. 50-277 50-278 License Nos. DPR-44 DPR-56 TECHNICAL SPECIFICATION CHANGES Ust of Attached Pages Unit 2 Unit 3 234b 234b i
9408090332 940303 PDR ADOCK 05000277 l
P PDR
Unit 2 LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.11.D.3 Visual inspection of snubbers required to be operable 'ander the provisions of 3.11.D.1 shall verify that 1) there are no indications of damage or impaired operability, 2) attachments to the foundations or supporting structure are functional, and 3) fasteners for the attachment of the snubber to the component and to the snubber anchorage are functional.
Snubbers which appear to be inoperable as a result of visual inspections shall be classified as unacceptable and may be reclassified acceptable for the purpose of establishing the next visual inspection interval, providing that 1) the cause of the rejectiol is clearly established and remedied for that particular snubber and for other generically susceptible snubbers; and 2) the affected snubber is functionally tested in the as found condition and determined operable per Specification 4.11.D.7 or 4.ll.D.8, as applicable. All snubbers found connected to an inoperable common hydraulic fluid reservoir shall be counted as unacceptable for determining the next inspection interval. A review and evaluation shall be performed and documented to justify continued operation with an unacceptable snubber.
If continued operation cannot be justified, the snubber shall be declared inoperable and the Limiting Conditions for Operation shall be met.
4.11.D.4 Functional Test
- a) Once each operating cycle, during shutdown, a representative sample of 10%
of each type of (mechanical or hydraulic) snubber required to be operable under the l
provisions of 3.11.D.1 shall be 1
/mg functionally tested either in place or in i
f a bench test.
For every unit found to N
be inoperable an additional 10% of that
- Performance of 4.11.D.4(a) with an \\ type of snubber shall be functionally operating cycle of 732 days is tested until no more failures are found approved for the operating cycle or all snubbers of that type have been following refueling outage tested. The functional test requirements i
2R010 only.
for mechanical
-234b-
Unit 3 LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.11.D.3 l
Visual inspection of snubbers required to l
be operable under the provisions of 3.11.D.1 shall verify that 1) there are no indications of damage or impaired operability, 2) attachments to the foundations or supporting structure art functional, and 3) fasteners for the l
attachment of the snubber to the component and to the snubber anchorage are functional.
Snubbers which appear to be inoperable as a result of visual inspections shall be classified as unacceptable and may be i
reclassified acceptable for the purpose of establishing the next visual inspection interval, providing that 1) the cause of the rejection is clearly established and remedied for that particular snubber and for other generically susceptible snubbers; and 2) the affected snubber is functionally tested in the as found condition and determined operable per Specification l
4.ll.D.7 or 4.11.D.8, as applic551e. All l
snubbers found connected to an inoperable I
common hydraulic fluid reservoir shall be counted as unacceptable for determining the next inspection interval. A review and evaluation shall be performed and i
documented to justify continued operation with an unacceptable snubber.
If continued operation cannot be justified, l
the snubber shall be declared inoperable l
and the Limiting Conditions for Operation shall be met.
4.11.D.4 Functional Test
- a) Once each operating cycle, during shutdown, a representative sample of 10%
of each type of (mechanical or hydraulic) snubber required to be operable under the provisions of 3.11.D.1 shall be W LE W functionally tested either in place or in
/
a bench test.
For every unit found to be inoperable an additional 10% of that
(* Performance of 4.11.D.4(a) with an type of snubber shall be functionally operating cycle of 732 days is tested until no more failures are found approved for the operating cycle or all snubbers of that type have been following refueling outage tested.
The functional test requirements 3R09 only.
for mechanical l
-234b-