ML20071P428

From kanterella
Jump to navigation Jump to search
Forwards Interim Deficiency Rept Re Compressible Matl for Embedded Containment Penetrations
ML20071P428
Person / Time
Site: Satsop
Issue date: 10/28/1982
From: Leddick R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC
References
10CFR-050.55E, 10CFR-50.55E, G3-82-1115, GO3-82-1115, NUDOCS 8211020506
Download: ML20071P428 (1)


Text

.

Washington Public Power Supply System Box 1223 Elma, Washington 98541 (206)482-4428 Docket Numbers 50-508 and 50-509 October 28, 1982 G03-82-lll5 Document Control Desk U. S. Nuclear Regulatory Commission Washington D. C.

20555

Subject:

PROJECT N0. 3 INTERIM REPORT OF POTENTIAL 10CFR50.55(e)

COMPRESSIBLE MATERIAL - EMBEDDED CONTAINMENT PENETRATIONS (D/N #44)

Attached is a copy of an interim report provided to Region V concern-ing a potential 10CFR50.55(e) deficiency associated with the subject condition.

Should you have any questions or desire further information, please contact me directly.

I Wh M..

,R. S. Leddick (760)

Program Director, WNP-3 i

DRC:nj Attachment cc:

J. Adams - NESCO, wo/a D. Smithpeter - BPA, wo/a Ebasco - New York, wo/a WNP-3 Files - Richland, wo/a hhb 8211020506 821028 PDR ADOCK 05000508 S

PDR

T uis U.T T s r. st,1:st:Et. r o m.H T: u teT t:3.

~

~

4T r n'xm. neinicovion

. Tuns t.cTTr.n f ootsi tuar.s i:oTl [sTMt.is4 A I;EW CC.*.l.GM.'

tvPPSS'connzsroxuCNcE r:0.

J2 ' / 0 COMMITMENT CONTROL 5

ROUTING SITE FILES MH HARRIS 701 CEri' RAP'P276F'"

-4' WG ALBERT /NRC 712 CM KIM 707 p

DR C00DY 750 DJ LAGROU 751 K ;

KW COOK 709 DD O'SULLIVAN 280 g~ '

DE DOBSON 760 JJ PETERSON 760 x

JJ DORAN 723 DL QUAMME 723 October 25, 1982

3 KE FORD 280 JP SLUKA 707 G03-82-1090 m

RB GLASSCdCK 280 GC SORENSEN 340

_g U. S. Nuclear Regulatory Commission, Region V p

Office of Inspection and Enforcement 5

8 1450 Maria Lane, Suite 260 T; 8;5 S tg Walnut Creek, California 94596-5368 s

\\

--r Attention:

11r. D.M. Sternberg Njb

. Chief, Reactor Projects Branch No. 1

]*

Subject:

POTENTIAL 10CFR50.55(e) DEFICIENCY Q

E COMPRESSIBLE MATERIAL - EMBEDDED

,V

'g

,z CONTAlliMENT PENElf.A.TIONS (0/l' a 4

\\

' rr g.

g On September 21, 1982 the Supply System not*f

.d

<o of fee of a potential s

8 10CFR50.55(e) deficiency concernir t

omis io o ompressible material y

v, of the subject deficiency per the cr'ter' of 1 Sitf0.55(e) has not been 4-__"

around containment penetrations 2>,

e d 44.

e ngineering evaluation o

completed.

t&

Ebasco and Chicago Bridge and Iron are j ' tly performing an analysis of the deficiency an its safety implications and determining corrective E

actions. The a pltion of all but one load case has been completed for d

s To datelthe analysis has determined that the'

  • k "E the three pen tral.i s.

lack of compre si e,aterial around the inboard side of penetrations 23 and 24 will be eqct ab e..

\\

. w-A fin 1 rinterimye' rt will be submitted to your office by February 4, (V

983.

h 1 ou have any questions or desire further information, q

ase c nt directly.

g F.

U

/

Es 5

./

Y E

R.S.Ledbi (760) e

  • e Program Director, UNP-3

[

r DRC:nj

~

,/ -

I cc:

Mr. J. Adams - NESCO I

Ii Q@j'

[3 Mr. D. Smithpeter - BPA Ebasco - New York WMP-3 Files - Richland g g iG M l_

.