ML20071P428
| ML20071P428 | |
| Person / Time | |
|---|---|
| Site: | Satsop |
| Issue date: | 10/28/1982 |
| From: | Leddick R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | NRC |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, G3-82-1115, GO3-82-1115, NUDOCS 8211020506 | |
| Download: ML20071P428 (1) | |
Text
.
Washington Public Power Supply System Box 1223 Elma, Washington 98541 (206)482-4428 Docket Numbers 50-508 and 50-509 October 28, 1982 G03-82-lll5 Document Control Desk U. S. Nuclear Regulatory Commission Washington D. C.
20555
Subject:
PROJECT N0. 3 INTERIM REPORT OF POTENTIAL 10CFR50.55(e)
COMPRESSIBLE MATERIAL - EMBEDDED CONTAINMENT PENETRATIONS (D/N #44)
Attached is a copy of an interim report provided to Region V concern-ing a potential 10CFR50.55(e) deficiency associated with the subject condition.
Should you have any questions or desire further information, please contact me directly.
I Wh M..
,R. S. Leddick (760)
Program Director, WNP-3 i
DRC:nj Attachment cc:
J. Adams - NESCO, wo/a D. Smithpeter - BPA, wo/a Ebasco - New York, wo/a WNP-3 Files - Richland, wo/a hhb 8211020506 821028 PDR ADOCK 05000508 S
T uis U.T T s r. st,1:st:Et. r o m.H T: u teT t:3.
~
~
4T r n'xm. neinicovion
. Tuns t.cTTr.n f ootsi tuar.s i:oTl [sTMt.is4 A I;EW CC.*.l.GM.'
tvPPSS'connzsroxuCNcE r:0.
J2 ' / 0 COMMITMENT CONTROL 5
ROUTING SITE FILES MH HARRIS 701 CEri' RAP'P276F'"
-4' WG ALBERT /NRC 712 CM KIM 707 p
DR C00DY 750 DJ LAGROU 751 K ;
KW COOK 709 DD O'SULLIVAN 280 g~ '
DE DOBSON 760 JJ PETERSON 760 x
JJ DORAN 723 DL QUAMME 723 October 25, 1982
- 3 KE FORD 280 JP SLUKA 707 G03-82-1090 m
RB GLASSCdCK 280 GC SORENSEN 340
_g U. S. Nuclear Regulatory Commission, Region V p
Office of Inspection and Enforcement 5
8 1450 Maria Lane, Suite 260 T; 8;5 S tg Walnut Creek, California 94596-5368 s
\\
--r Attention:
11r. D.M. Sternberg Njb
. Chief, Reactor Projects Branch No. 1
]*
Subject:
POTENTIAL 10CFR50.55(e) DEFICIENCY Q
E COMPRESSIBLE MATERIAL - EMBEDDED
,V
'g
,z CONTAlliMENT PENElf.A.TIONS (0/l' a 4
\\
' rr g.
g On September 21, 1982 the Supply System not*f
.d
<o of fee of a potential s
8 10CFR50.55(e) deficiency concernir t
omis io o ompressible material y
v, of the subject deficiency per the cr'ter' of 1 Sitf0.55(e) has not been 4-__"
around containment penetrations 2>,
e d 44.
e ngineering evaluation o
completed.
t&
Ebasco and Chicago Bridge and Iron are j ' tly performing an analysis of the deficiency an its safety implications and determining corrective E
actions. The a pltion of all but one load case has been completed for d
s To datelthe analysis has determined that the'
- k "E the three pen tral.i s.
lack of compre si e,aterial around the inboard side of penetrations 23 and 24 will be eqct ab e..
\\
. w-A fin 1 rinterimye' rt will be submitted to your office by February 4, (V
983.
h 1 ou have any questions or desire further information, q
ase c nt directly.
g F.
U
/
Es 5
./
Y E
R.S.Ledbi (760) e
- e Program Director, UNP-3
[
r DRC:nj
~
,/ -
I cc:
Mr. J. Adams - NESCO I
Ii Q@j'
[3 Mr. D. Smithpeter - BPA Ebasco - New York WMP-3 Files - Richland g g iG M l_
.