OPERATING DATA REPORT DOCKETNO. 50-333 DATE July 1981 COMPLETED BY E.
Zufelt TELEPilONE (915)342-384o OPERATING STATUS N"8'5
- 1. Unit Name: _FitzPatrick 810601-810630
- 2. Reporting Period:
2436
- 3. Licenwd Thermal Power (MWI):
883
- 4. Nameplate Rating (Gross MWe):
821
- 5. Design Electrical Rating (Net MWe):
830
- 6. Maximum Dependable Capacity (Gross MWe):
810
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report,Gise Reasons:
. ~. -..
- 9. Power LeselTo Which Restricted,if Any(Net MWe):
- 10. Reasons For Restrictions,If Any:
This Month Yr..to Date Cumulatise 720 4343 51960 I1. flours in Reporting Period 720 3894.9 36808.9
- 12. Number OfIlours Reactor Was Critical 0
0 0
- 13. Reactor Reserve Shutdown flours
- 14. Ilours Generator On.Line 720 3833.3 35736.1 0
0 0
- 15. Unit Resene Shutdown Ifours
- 16. Gross Thermal Energy Generated (MWil) 1720169 8071464 79199058 587930 3115590 24945100
- 17. Gross Electrical Energy Generated (MWil) 570855 3nEOS20 24145400
- 18. Net Electrical Energy Generated (MWH) 100.0%__
88.3%
68.8%
- 19. Unit Service Factor 100.0%
6 t). 3%
6 8. 8 J, 20 Unit Availability factor
- 21. Unit Capacit) 1% sur (Using MDC Net!
9 L.9 %_.
85.9%
62.4%
56.6%
96.6%
84.7%
17.6%
- 22. Unit Capacity Fact.r (Using DER Net) 0.O%
11.7%
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Eachl; Refueling and maintenance outage scheduled for October for a period of 110 days.
- 25. lf Shut Down At End Of Report Peiiod. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operationl:
Forecast
\\
Achiesed INili A L CRITICA LiTY INITI AL ELECTRICITY COMM ERCIAL OPER ATION 8211020414 810701 PDR ADOCK 05000333 R
AVER ACE DAILY UNIT POWER LEVEL 50-333
~
DOCKET NO.
UNIT JAFNPP July 1981_
DATE E. Zufelt COMPLETED BY (315)342-3840 TELEPHONE June 1981 3 ONm DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL '
p We.Ner)
(MWe Net) 802 798 i7 I
808 33 gog 2
809
,9 747 3
807 20
_- 795 4
800 804 21 5
802 803 22 6
802 804 23 7
Ann 806 24 s
801 804 25 9
796 10 806 26 631 805 27 II 71'4 806 28 12 802 13
_ _ _ 7.7 1 _ --
29 801 799 30 14 803 3,
15 802
,6
SUMMARY
Unit operated at near full rated thermal power for this reporting period.
On June 27, 1981 power was reduced for rod pattern adjustment.
-k
DOCKET NO. 50-117 UNIT SilVTDOWNS AND POWER REDUCTIONS UNIT N AhlE J AFf!PP DATE July 1981 COMPLETED BY E-Z u t'e l t REPORT MONTH June 1981 TELEPilONE (315)342-9840 w.
E Y
Licensee 5 r,
$?
Cause & Corrective E ".
Action to Date g;
3g i
,g g y Event a '2 c3 E in j5g Repor =
NG j
, Prevent Recurrence c5 7
810627 s
o n
4 NA NA NA Rod pattern adjustment l
9 I
2 3
4 F: Forced Reason:
Method:
Exhibit G Instructions S: Scheduled A. Equipment Failure (Explain) 1 -Manual for Preparation of Data B Maintenance or Test 2 ManualScram.
Entry Sheets for Licensee C Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG.
D Regulatory Restriction 4-Other (Explain) 0161)
E Operator Training & Ucense Examination F Administrative
~
G Operational Error (Explain)
Exhibit I - Same Source Il Other (Explain)
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE JUNE 1981 The FitzPatrick unit operated at near full power during this reporting period.
Power was reduced on June 27, 1981 to approximately 650 MWe to adjust rod pattern to compensate for fuel burn up.
Upon completion, power was increased at the pre-conditioning rate.
3 i
f t
\\
~
\\
L
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL 8 MECHANICAL MAINTENANCE
SUMMARY
JUNE 1981 0
DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T
ET 6/19 70 9070 Visual Normal wear Replacec expansion joints.
12 RWC-2A 6/19 70 9874 Visual Normal wear Replaced expansion joints.
20 RWC-2B 6/13 76 12086 Surveillance Plugged up nozzles Cleaned nozzles.
6 A Standby Gas 6/17 13 8838 Installation Design Added counter weights to dampers.
22 Backdraft Testing Fan 9
D 0
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE
SUMMARY
j JUNE 1981 I&C W
CAUSE OF RESULTS OF ACTION TAKEN REPAIR
_ ORK REQUEST #
H ETECTED
.DATE SYSTEM
[CURR COMPONENT #
MALFUNCTION MALFUNCTION H
RS i
6/4/81 02 9942 I&C Corrosion in Abnormal High Cleaned 02 FIS 116B snubber flow indicator snubber 2.0 6/2/81 02-3 9953 I&C Defective Recirc pump Replaced 02-3-LIS-58A Switch #3 trip inop.
switch 8.0 6/1/81 02-3 9942 N/A N/A N/A Reset switches 02-3-PS-51AD to comply with T.S.
Change.
6.0 l
6/19/81 03 9633 OPS Age /Use Rod would not-Replaced push Rod select select button switch button 30-07 10.0 6/3/81 07 11997 OPS Defective Relay B RBM remained Replaced relay RBM-B bypassed 7.0 6/5/81 10 11992 OPS Defective Relay Dual indication Replaced relay 10 LS 105A (Dry & Wet) 20.0 6/5/81 17 11993 OPS Corrosion Flow control Replaced and 17 RE431A inside magnet.
valve oscilates aligned magnet 34.0 6/5/81 20 12010 OPS Cal. Data in The integrator Corrected data FQ 527 Procedure registered flow in the ISP and with no numnout calibrated 527 8.0 6/1/81 27' 11990 OPS Age Indicated Reca11brated 0 AZ 101A downscale Per ISP-31 24.0 2
6/9/81 27 11929 OPS Defective One pen of Parts on order 2.0 27 R102 amplifier recorder inop.
6/15/81 70 12133 OPS Unknown Lo Duct Alarm Calibrated 70 TS 102L is in switch 12.0 6/15/81 70 10090 OPS Unknown Switch does Calibrated i
70 TS 100 not reset switch 12.0 l