ML20071N970

From kanterella
Jump to navigation Jump to search
Forwards Proposed Schedule for Completing Requirements of NUREG-0737,Suppl 1, Emergency Response Capability, Per 830510 Meeting.Commitments from Remain Unchanged
ML20071N970
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/31/1983
From: Wilgus W
FLORIDA POWER CORP.
To: Stolz J
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-1.C.1, TASK-1.D.1, TASK-1.D.2, TASK-3.A.1.2, TASK-3.A.2.2, TASK-TM 3F-0583-24, 3F-583-24, NUDOCS 8306070300
Download: ML20071N970 (8)


Text

.

o

$/

lpOLEf *

%ki norida Power C O A P O A A T ' 0 88 May 31,1983 3F-0583-24 Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 NUREG-0737, Supplement 1 Proposed Schedule for Completing Requirements for Emergency Response Capability

Dear Sir:

As a result of our May 10, 1983, meeting with you, Florida Power Corporation (FPC) has updated its schedule for those activities necessary to complete requirements to upgrade our emergency response capabilities. Discussions of two specific areas of concern have resulted in this letter:

1. the integration of all control room related reviews, assessments and installations into the Control Room Design Review (CRDR); and
2. the schedule for the CRDR implementation phase.

It is FPC's intent to integrate all changes to the control room during the assessment phase of the CRDR. The design and location of the SPDS and the planned Regulatory Guide 1.97 upgrades will be considered during the CRDR assessment to determine the upgrade priorities.

Predicting long-term schedules based on several ongoing programs is difficult. Therefore, we have amended the schedule to indicate only the beginning of presently unpredicted phases (e.g., implementing CRDR and RG 1.97 procurement and installation). When these phases begin, we will provide detailed schedules.

8306070300 830531 PDR ADOCK 05000302 h

V F PDR I I General Office 3201 Thirty-fourtn street soum . P O Box 14042. St. Petersburg. Florida 33733 e 813-866-5151

c 4-May 31,1983

- 3F-0583- 24

- Page 2 In our April 15,1983, letter to you we committed:

1. to implement the schedule through April 14, 1984;
2. to review the schedule at that time; and,
3. to review the schedule annually thereafter.

These commitments have not changed.

Sincerely, W. S. Wilg Vice PresMent Nuclear Operations

$ AD/mm Attachments a

l l

l l

i

\

W ATTACHMENT 1

~~

_ s ag % _

s .1 NUP.EG-0737 SUPPLEMENT 1 to 'T SUBJECT ITEM -

NUREG-0737 ITEM - ,

+ -

Guidance for the Evaluation and Developmint - I.C.1 s 1 7.1 -

of Procedures for Transients and 4,ccidents Control Room Design Reviews I.D.1 5.1 i - .

Plant Safety Parameter Display Console ,_m

,,I.D.2 ,

4.1, 6.1.b ss

=

.r.- __

Upgrade Emergency Support Facilities _-

~

111.A.1.2 6.1.c, 6.1.d, 8.2, 8.3, 8.4 Msteorological Data III. A.2.2 , ,

, . 6'.l.5 '  ?

,g\

s 5

1 2

4 I

-l

\

  • 9g ev-- e- --r zy - w- Per-I y -'-ee reev-gwe w -------ewam v mw- -- -

y+ ee w ==-m a ?gw $ e ePP1- m-e,=W-e *'s* ur e

( .,

g x $

u n. ,

s ,' . C\ '

.- ts t.,

t .

i^ ATTACHMENT 2

% 'k

%, y ,, , Tahular Schedule for NUREG-0737 Supplement I s Attachment 3 Item Number ,

Response Activity Number N

[ %. " R fi J -

p.l.a The engineering documents used to procure and install 932,934 and 936

~

Y SPDS will incorporate these general requirements.

' , ~. 4.1.b' Same as 4.1.a 932 L' y 4.1.~c Same es,4.i.a ' 932

  • i ,.c

. .s,,w 4Wd ,

~

Same as 4.1.a 932 4.1.e .

Same as 4.1.a 932 4.1.f Same as 4.1.a 932 4.2.a The written safety analysis for the SPDS will be prepared during 933 f- '"

the Engineering Phase of the project and will be submitted by the u end of the.3rd Quarter of 1984.

4 .2.b Appropriate Technical Specification change requests will be sub- 935 s

\ ,.

+'

, mitted at le'a'st 90 days prior to the completion of installation.

4 ' 4.3 \ SPDS design will be integrated into the assessment phase of 932,914

, . the CRDR. The design will be considered as an input to revision

- e l s ,

.gf the EOP's. 5 s

s "

, 5.1.$ ...'The objective of the control room design review will be utilized 910

' " (in the FPC plan scheduled to be completed in the 3rd Quarter of

$ - 1983.

-s 5.l.b FPC will complete a review of the control room during the 912

! " " i I, + .' 2nd Quarter of 1984.

. ~

f 5.1.c FPC will assess which engineering discrepancies are significant 914 and should be corrected. This is scheduled to be completed during the 1st Quarter 1985.

3 q s 5.1.d FPC will verify that each selected design improvement will provide 914

..A N .~ ( ' Me necessary correction and can be safely introduced into the t

^

  • V wcontroi room. This is scheduled to be completed during the 1st Quarter of 1985.

y/ y

  • M-

,s* ,

f .-~

gQ <*

'A

>- ,. q y

-* g N, s

I

, , J' h olx m ~

\

,C o

Y Attachment 3 Item Number Response Activity Number 5.2.a FPC will submit a program plan within two (2) months after the 913 start of the Review. This is scheduled for the 4th Quarter of 1983.

, 5.2.b FPC will submit a summary report of the completed assessment. 915 This is scheduled for the 2nd Quarter of 1985.

5.2.g FPC will not begin the control room upgrade until the staff 916 has issued an SER and FPC has addressed any open items. We will provide a detailed schedule for Control Room modifications and operator training by July 1,1985.

6.1,a The requirements of Regulatory Guide 1.97 will be considered 950 and during the Compliance Study and Systems Study Phase of this 952 project. Results of these studies will be integrated in our Control Room Design review.

6.1.b FPC will to satisfy the requirements of this paragraph in 952 the systems study.

6.1.c Same as 6.1.b 952 6.1.d Same as 6.1.b 952 6.2 FPC will submit a report describing its' compliance with the requirements 953,954, of this paragraph and showing FPC's position on all items in Regulatory 956 and 958 Guide 1.97 in the 3rd Quarter of 1984. Identified deviations from the requirements of RG 1.97 will initiate the engineering phase of FPC's compliance and allow FPC to submit a detailed procurement schedule by January 2,1985 and a schedule for installation and training by February 28,1986.

7.1.a FPC is committed to using human factored, function oriented EOP's. Complete 7.1.b FPC has prepared Technical Guidelines. 919 (Completed) 7.1.c FPC is currently writing the upgraded EOP's consistent with the 920 Technical Guildelines and the Procedures Generation Package pre-viously submitted to the NRC, Activity completion scheduled for the end of the 3rd Quarter of 1983.

7.1.d Training on the upgraded EOP's is scheduled to be completed during 920 the 1st Quarter of 1984.

7.1.e Implementation scheduled for the 1st Quarter of 1984. 920 7.2.a FPC has submitted Technical Guidelines. 919 (Completed)

ddP Attachment 3 Item Number Response Activity Number 7.2.b FPC has submitted the Procedures Generation Package including 919 a program for the validation of EOP's. (Completed) 8.2.1.a The general requirements for the TSC have been included in the Complete design of the TSC.

3.2.1.b The location requirement of the TSC has been included in the Complete design of the TSC.

8.2.1.c The accommodations requirement of the TSC has been included in the Complete design of the TSC.

8.2.1.d The TSC was structurally built in accordance with the Uniform Complete Building Code.

8.2.1.e Tne controlled environment requirement of the TSC has been included Complete in the design of the TSC.

8.2.1.g The communications requirement for the TSC has been included in the Complete design of the TSC.

8.2.1.h The data requirement for the TSC has been included in the design 964 of the TSC. The data display equipment is scheduled to be completed in the 1st Quarter of 1984.

8.2.1.1 The records requirement for the TSC has been included in the design Complete of the TSC.

8.2.1.J The staffing requirement for the TSC has been included in the design Complete of the TSC.

8.2.1.k The human factors engineering principle requirement for the TSC has Complete been included in the design of the TSC.

8.3.1.a The general requirements for the OSC have been included in the Complete design of the OSC.

8.3.1.b The location requirement for the OSC has been included in the design Complete of the OSC.

8.3.1.c The communication requirement for the OSC has been included in the Complete design of the OSC.

8.4.1.a The general requirements for the EOF have been included in the Complete design of the EOF.

3.4.2.b The location requirement for the EOF has been included in the Complete design of the EOF.

8.4.1.c The accommodation requirement for the EOF has been included in the Complete design of the EOF.

3

Attachment 3 Item Number Response Activity Number 8.4.1.d The EOF was structurally built in accordance with tiie Uniform Complete Building Code.

8.4.1.e The controlled environment requirement for the EOF has been Complete included in the design of the EOF.

8.4.1.f The communications requirement for the EOF has been included 960 in the design of the EOF. This is scheduled to be completed in the 3rd Quarter of 1983.

8.4.1.g The data requirement for the EOF has been included in the design 962 and 964 of the EOF. This is scheduled to be installed by the end of 1983 and EOF personnel training in EDAS operation by the end of the 1st Quarter of 1984.

.,~

8.4.1.h The records requirement for the EOF has been included in the Complete design of the EOF.

8.4.1.1 The staffing requirement for the EOF has been ir.cluded in the Complete design of the EOF.

, 8.4.1.) The security requirement for the EOF has been included in the Complete design of the EOF.

8.4.1.k The human factors engineering principles requirement for the EOF Complete has been included in the design of the EOF.

_4_

\

"e m y(f'!!Est=St STARY 3 Jans3 mRC LICf mSI4C tort 9tttw af S PL Of LICfmSE COM*Lff!04 T4aPREF SJPPLf Mthfl 78 m;#ts-Qt37 SCMtouit weP wI =c i( MEouLf

.e r4 P,04 Pffl1!041 S/27/g3 es?CE 0?FF scrit aftE1 I4f f RV AL

  • I 'TMitee t S t 3 4R tN 1983 1984 P ar.f a 1985 1986 J IF ]M IA lM lJ lJ lA lS l0 lN l0 J lF lM l A lM lJ lJ l A lS l0 lN lD 1987 839 START PLOT

$ 3Jngst J lF lM ! A IM lJ lJ l A lS [0 lN ]O JIF lMl A IM lJlJlA lS l0

$00 REFUEL IV SPRf4C 1983 1EAR83 I I $1uiS3

90) REFUEL V SPRinc 985 (APPR0stMaff t SFf645 1 114JViet$

972 RtFUEL WI FALL 194% fAPPROtt9Af f D 903 FdiURE SCHEDULE. RtitS!? *se' T SSE PBS I I '9*E(86 904 $ 12APRs4 FUfuRC SCHEDust Rt f! SIT *E5*

301 FUit/RC SCMEDULE pef tSit *L%*

$ t2sPRes 904 SuTURL SCHEDULE RCtf S!? '87* $ e4A**ES 900 PL AN CONTROL ROCM DESIC4 RC#!Ed r$4 PRS 3 I 130auct3 M 9f2 RC#!Ed ConfROL ROCM CESIGN REWlEd 31&uC33 I l22 MAP 84 913 SG"#t!T REPCRT CONTROL ROCM DESIC4 RCf f td

$ 3sCCfg3 914 45'ESS (OufROL ROCM DESIC4 Rttitd I23 MARS 4 IEl**PE3 915 508M11 REPCRT ConfROL ROCM DESIC4 REf!Ed I

914 IMPL E ME uf/1RAlt (ONfat0L ROCM DES!C4 RCflEd $ 3tPNt3 119 SG3.* ROC.CIN.P40 EfERGENCT OPERAltitC PROCfDURE

$ tJuits D 2SM4RS3

) 920 IMPL f ME NYs YRAIN EMERGENCT OPERATING PROCfDURE . 2TJuteS) I I E20EC s3 932 fECINEERING $4FEf f PaRAMETFR DISPL AY STS . . . . . .

Q FPg3 2 r Ayr.g4 __ I

$33 %# EMIT ANALYSIS SAFFff PaPAPITER CISPL AT STS 934 PROCVkC/ DELIVER S4Ffif PARAMF.ff R DISPL AY STS

$ 30aut.54

[j0Ets3 935 ff t99 SFSC 26tE(64 1

$4FETT P ARAMEff R DISPL AY STS ..

93% IEST ALL /T RA14 SAFf f? PARAMFifR Dl$PL AT STS $ 2994RSS E314urG4 I Jd 85 I

$50 CCM* LIE 2(f $f007 RECdLATORY Cul0E I.97 ISAPR43 I 7 2$JUL&3 952 STSff MS $f007 Rtr.cLATOR' CutDE I.9F I 23sAEJ 2240C64 1 953 tJ8't!t KtPCRY PCf.diATORY cu!DE I.97 154 f tCINEf tt4C RECD 6Af0RT Cut 0E I.97

$ 21Auct 4 E 2 34br-54 954 PROLUEE/ DELIVER Rtt.dL ATORY Cul0E I.9F 26FtBb6 1

$$4 14$1&LL/TR4!4 @ 2 jam 85 RCf.dL ATORY Cul E I.9F 960 IRSTFAL/TRatu ErtRCamCT PCSPCNSE FACILIT![$ $ 2&FEDE9

,, 31AMS3 29 jag 3 1 242 IDAS EPERCf MC f PESPONSE F ACILITIES . . . . . [ l '; APR 6 3 230EC E 3 I

{De FDAS TRAINING EMERGINCY RESPCNSE FACIL! TIES 250E t &3 I 123 MAR 64 L_E_C_E N D WORMIRC SfM I I

  • tlLE S f 0NE D _

O