Forwards Revision 10 to Fsar,Including FSAR Changes Transmitted by 820706,13 & 0827 Ltrs
ML20071N675
Person / Time
Site: Wolf Creek, Callaway, 05000000
Issue date: 09/30/1982
From: Petrick N
STANDARDIZED NUCLEAR UNIT POWER PLANT SYSTEM
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20071N679 List:
References
SLNRC-82-39, NUDOCS 8210080260
Download: ML20071N675 (2)


Text

4 SNUPPS Standardised Nuclear Unit Power Mont Systoni s choke cherry need Nicholas A.Petrick v Marytend 20050 Exocutive Director September 30, 1982 SLNRC 82- 39 FILE: 0541 SUBJ: Revision Ten to SNUPPS FSAR Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Docket Nos: STN 50-482 and STN 50-483

References:

1. SLNRC 82-031, dated July 6,1982
2. SLNRC 82-032, dated July 13, 1982
3. SLNRC 82-034, dated August 27, 1982
4. NUREG-0830, Callaway Safety Evaluation Report
5. NUREG-0881, Wolf Creek Safety Evaluation Report

Dear Mr. Denton:

Forwarded herewith are seventy-five (75) copies of Revision 10 of the Standardized Nuclear Unit Power Plant System (SNUPPS) FSAR. This revision will be incorporated into the applications of the above dockets by ameridments submitted by Kansas Cas and Electric Company and Union Electric Company.

This revision includes the SNUPPS FSAR changes previously transmitted by references 1, 2 and 3. The revision contains the information necessary to resolve issues identified in references 4 and 5 as follows:

FSAR SECTION ISSUE Q123.3(Q251.1 W.C.) Ref. 5 Confirmatory A.4 Q210.3 . Ref. 4 Confirmatory 3; Ref. 5 Confirmatory B. 3 Table 7.5-2 Sheet 4 Ref. 4 Confirmatory 10 and License Condition 9; Ref. 5 Confirmatory B.11 and License Condition B.9 7.6.11 Ref. 4 Confirmatory 11 and License Condition 13; Ref. 5 Confirmatory B.12 andLgenseConditionB.13

'02iOO90260 820930

~ ~ '

PDR ADOCK 05000482 &

. K. _

PDR gpd I W5 1

. o Revision Ten to SNUPPS FSAR Page 2.

FSAR SECTION ISSUE Appendix 7A Ref. 4 License Condition 11; Ref. 5 License Condition B.ll 18.2.2 Ref. 4 Outstanding Item 12; Ref. 5 Outstanding Item B.4 (TMI Action Plan II.B.2)

In addition, the revised FSAR page 8.3-7 precludes the necessity for the Technical Specification surveillance requirement identified in Section 8.3.3.1.2 of References 4 and 5.

Portions of FSAR Sections 6.3, 9.3 and Chapter 15 have been modified by this revision to reflect a decrease in the Boron Injection Tank boron concentration from 20,000 ppm to 2,000 ppm boron.

The revision also includes minor updates and corrections. Some pages are replaced in this revision simply to correct previous printing errors and do not contain any text or information changes.

Very truly yours,

% %s u Nicholas A. Petrick MHF/nid

Attachment:

Revision 10 to SNUPPS FSAR cc: G. L. Koester KGE D. T. McPhee KCPL

3. F. Schnell UE J. H. Neisler USNRC/ CAL T. E. Vandel USNRC/WC