ML20071N612

From kanterella
Jump to navigation Jump to search
Third Interim Rept Re Significant Const Deficiency 68 Concerning Spurious ESF Actuation Sys Actuation.Initially Reported on 830331.Corrective Action Completed.Supporting Info Assembled for QA Review.Final Rept by 830624
ML20071N612
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/30/1983
From: Drummond F
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
W3183-0195, W3183-195, NUDOCS 8306070133
Download: ML20071N612 (1)


Text

O

POWER & LIGHT / BOX 6008

'$ EON SysSIU u

Way 30, 1983 W3I83-0195 Q-3-A35.07.68 Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission j

h b q

l 611 Ryan Plaza Drive, Suite 1000 ,.. _f Arlington, Texas 76012 E - 2 [Cgg j l J

SUBJECT:

Waterford SES Unit No. 3 ~

L--

Docket No. 50-382 Significant Construction Deficiency No. 68 j

" Spurious ESFAS Actuation" Third Interim Report

REFERENCE:

LP&L letter W3P83-1015 dated March 31, 1983

Dear Mr. Collins:

The above referenced letter indicated submittal of a Final Report to the USNRC no later than May 31, 1983.

At the present time, all corrective action has been completed. The supporting documentation is being assembled for Quality Assurance review. This review is expected to be completed one (1) week af ter receipt by Quality Assurance.

Therefore, a Final Report will be submitted to the NRC by June 24, 1983.

Very truly yours, M '"

l F. J. Drummond Project Support Manager - Nuclear FJD/RWP/ MAL:keh l