W3P83-1015, Second Interim Rept on Significant Const Deficiency 68 Re Spurious ESF Actuation Sys.Corrective Action Delayed Due to Preoperational Testing of Plant Protection Sys.Status of Corrective Action Will Be Reported by 830531

From kanterella
(Redirected from W3P83-1015)
Jump to navigation Jump to search
Second Interim Rept on Significant Const Deficiency 68 Re Spurious ESF Actuation Sys.Corrective Action Delayed Due to Preoperational Testing of Plant Protection Sys.Status of Corrective Action Will Be Reported by 830531
ML20072T755
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/31/1983
From: Maurin L
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, W3P83-1015, NUDOCS 8304080320
Download: ML20072T755 (1)


Text

Lo u i sia ma j ,.. ""em_e~ee

"'" m._' "" ." .e ee eme

" ~ * ""

uionir souis UituilLS SfSTEM ,

L.V. MAURIN March 31, 1983 Vice President Nuclear Operations W3P83-1015 Q-3-A35.07.68 Mr. John T. Collins, Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 6;; Ryan Plaza Drive. Suite 1000 Arlington, Texas 76012

SUBJECT:

Waterford SES Unit No. 2 Docket No. 50-382 Significant Construction Deficiency Report No. 68

" Spurious ESFAS Actuation" Second Interim Report

REFERENCE:

LP&L letter W3183-0045 from L. V. Maurin to J. T. Collins, dated February 10, 1983

Dear Mr. Collins:

At the present time, the corrective action has been delayed due to preoperational testing of the Plant Protection System. Further information concerning the status of the corrective action will be transmitted to the NRC by May 31, 1983.

Very truly yours,

.- / /

i k(/4cpd L. V. Maurin LVM/ MAL /ssd cc: 1) Director of Inspection & Enforcement 3) Mr. E. Blake U.S. Nuclear Regulatory Commission Washington, D.C. 20555

2) Director 4) Mr. W. Stevenson Office of Management l Information and Program Control U.S. Nuclear Regulatory Commission Washington, D.C. 20555 IE-M 8304000320 830331 PDR ADOCK 05000382 g PDR