r.

e

~

s -

o.

OPERATING DATA REPORT DOCKET NO. 50-286 DATE _ August 1,.1982 C05tPLETED BY I.. Auterino TELEPHONE fo141 7'4-8200 OPERATING STATUS

1. Unit Name:

Indian Point No. 3 Nuclear Power pl e t

2. Reporting Period:.Tulv 82
3. Licensed Thermal Power IMWr):

3025

4. Nameplate Rating (Gross SIWE):

1013 965

5. Design Electrical Rating (Net 5tWe):

7 926

6. Maximum Dependable Capacity (Gross MWe):

891

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

- ! s

9. Power Level To Which Restricted,If Any (Net MWe):
10. Reasons For Restrictions.If Any:

Yr..to.Date Cumutative' This Month 744 5,087.0 5'1,888.0

11. Hours in Reporting Period
12. Number Of Houn Reactor Was Critical c

1,984.6 34,090.8

13. Reactor Resene Shutdown Houn 0

0 0

14. Hours Generator On-Line 0

1,969.4 32,913.1

-15. Unit Reserse Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 0 5.060.030 86.143,401
17. Gross Electrical Energy Generated (MWH) 0 1.502.170 26.299.300 0

1,436,036 25,183,443

18. Net Electrical Energy Generated (MWHg
19. Unit Service Factor 0

38.7 63.4

20. Unit Availability Factor 0

3R.7 63.4

21. Unit Capacity Factor (Using MDC Nets o

31.7 54.5

22. Unit Capacity Factor (Using DER Net) 0 29.3 50.3 I
23. Unit Forced Outage Rate 0

2.3 14.3

24. Shutdowns Scheduled Over Next 6 Months IType.Date,and Duration of Eacht:

Refoolinn outane in nroarens.

Upon completion of scheduled Maintenance 2S, if Shut Down At End Of Report Period. Estimated Date of Startup:

N-Mr LT e R')

26. L* nits In Test Status (Prior to Commercial Operationi:

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCI AL OPER ATION 8209240101 820811 PDR ADDCK 05000286 R

PDR enn

50-286 UNITSIlUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNITNAME Indian Point No. 3 DATE Angunt 1.

1992 COMPLETED BY L.

Auterino REPORT MONTil July 82 TELEPIIONE (9141 779-9200 "s

c r,

~5.a =

.2 _e g

9.c X Licensee P.

g" Cause & Corrective c

8 ".

No.

Date g

3g jg5 Event u?

Action to

'$3 5

j15 Report #

tN0 Prevent Recurrence Q

04 820325 S

744 B&C N/A N/A N/A Unit in a scheduled cycle III-IV refueling and maintenance outage.

I 2

3 4

F: Forced Reason:

Method:

Exhibit. Inst ructions S: Scheduled A Equiprnent Failure (Explain) 1 Manual for Preparation of Data Il-Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction 4 Other(Explain) 0161)

E Operator Training & License Examination F Administrative 5

G-Operational Enor (Explain)

Exhibit, Same Source to/77)

Il Ot her (Explain)

AVERAGE D AILY UNIT POWER LEVEL DOCKET NO.

50-286 Indian Point UNIT Mn 3 DATE August 1, 1982 COMPLETED BY L.

Auterino TELEPHONE (914) 739-8200 MONTH July 82 i

DAY-AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL I

(MWe-Net)

(MWe-Net) 1 0

g7 0

2 0

gg 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

S 0

24 0

9 0

25 0

l 10 0

26 0

11 0

27 0.

I2 0

28

.0 13 0

29 0

14 0

0 30 15 0

O 3;

I6 0

LNSTRUCTIONS On this forrnat, list the average daily unit power lesel in MWe Net for each day in the reporting month. Compute to the nearest whole rnegawatt.

(9/77) i t

MOtiTilLY I & C CATEGORY I REPORT l

July 1982 1

Month i

d

}

W.R.

flo.

DATE EQUIPMEtiT MALFUt3CTIOtl' CORRECTIVE ACTIOt1 9

j IC-1-1580-2 7-19-82

  1. 32 & #35 Zurn Strainers,

Delta P Switches Sticking Replaced and calibrated switcher i

IC-1-1632-2 6-14-82 Control Rod Positicn Poor Connection at Replaced connectors for RPI Indication Connectors for Conditioner Nos. D12, E9, K2, F14,118 and bistable cards in CCR j

IC-1-1690-2 6-7-82 R17B Ccmponent Cooling Sticking Check Source Replaced Check Source Solenoid i

Water Radiation bbnitor IC-1-1694-2 7-13-82 ICV-1032D - #31 Waste Gas Does not control at procer Repaired loose connection to Ocupressor Drain Valve level pressure switch

\\. '

L IC-1-1698-2 6-1-82 PM-406G ABFP #33 I/P Inproper output Replaced I/P Converter s

,ji (bnverter I;,

IC-1-1700-2 5-28-82 PP-425 RCS Flow Trans-Poor repeatability during Replaced transmitter amplifier j

mitter calibration force motor, assenbly and force

[

bar assanbly

[)

IC-3 -1775-2 7-3-82 R10 Area Radiation Shorted Power Supply Replaced Power Supply Transform ll Monitor Transfonner ll

~

IC-1-1748-2 7-14-82 R5 Fuel Storage Bldg.

Power Supply Transfonner Replaced transforner and' power j

Area Radiation Fbnitor burned up supply couponents I

l i

?

MONTHLY MAINTENANCE REPORT anly lon?

Month ln d

DATP, EQUIPMENT MALFUNCTION CORRECTIVE ACTION 2809 7/23/82 Value 1616 - N to Nuclear Leaks by Replace Valve 2

Equipment to Nuclear Leaks by Replace Seals and Gasxet 2812 7/23/82 Valve 863 - N2 Equipment 2860 7/06/82 Vapor Containment Wall Insulation Separating from Liner Rescal Insulation Insulation 2862 7/06/82 WCCPP to V.C.

Penetrations Cover Plates Missing

-Replace Cover Plater, 2910 7/06/82 WCCPP Rack 16 - V.C. Liner Broken Test Connection Install New Connector and' Plug 2511 7/06/82 WCCPP Rack 14 - V.C. Liner Broken Test Connection Install New Connector and Plug 2912 7/06/82 PCV-1191-VC Press. Relief Valve Sticks Clean Valve 2913 7/23/82 MOV-535-Power Op. Relief Valve Sticks Replace Operator Block Valve 2915 7/06/82 PCV-ll89-City Water to Aux Indicating Light Broken Replace Limit Switch Boiler Feed Pump 2918 7/23/82 Valve 204A-Charging line Indicating Light Broken Adjust and Clean Limit Switch Isolation 2931 7/06/d2 32 Instrument Air Dryer Refrigerant Level Low Charge with Freon 12 2932 7/06/82 31 Instrument Air Dryer Refrigerant Level Low Charge with Freon 12 2933 7/06/82 PCV-1191-V.C. Press. Relie:

Does Not Cycle Cleaned Valve Switch 2936 7/26/82 Valve 885A Container Container Flange Leaks Replace Gasket 2952 7/26/82 Valve 204A-Charging Line Dual Indication in Control Room Adjust Mechanical Linkage Isolation 2954 7/26/82 34 Fan Cooler Unit Leaks Repair Leaks Motor Cooler

l 1

a 4

0 9

9 O

en N

i*

O L

h I

e 2

t T

m 8

n C

o 9

o A

r 1

M F

s E

y g

V e

n l

I u

g i

T a

R J

C e

k E

s c

"O R

o o

R l

l l

O B

C d

d e

d e

c e

c a

r a

l a

l p

e p

e l

e R

C R

TRO PER E

1 C

tO l

tA IT 1

tE C

T N

U 3

t I

F A

L M

A M

Y e

L liT d

1 O

e M

s k

s k

c k

a o

a 9

e l

e L

B L

f t

i le e

R so e

g s

I I

a s

t t r

e i e o

r T

nl t e P

U n S n i

t I

i E

r dL C.

M er i

P l e ce V

I ol A l, UQ oo p

C o cm 1

E C

i a 9

n rS 1

ar o

1 F o Bk t

n V

1 o 1 a C

3 M 3 T P

+)

2 2

2 8

8 8

/

/

/

E 6

6 6

T 2

2 2

A

/

/

/

D 7

7 7

b i

0 2

6 6

7 7

d 9

9 9

2 2

2 P

k ll

\\

4 Indian Point Unit 3 remained shutdown for the entire reporting period. Replacement of containment fan cooling coils and main turbine spindles continue.

Preparation for steam generator sleeving operation is in progress.

.