OPERATING DATA REPORT DOCKET NO. 50-286 DATE _ August 1,.1982 C05tPLETED BY I.. Auterino TELEPHONE fo141 7'4-8200 OPERATING STATUS
- 1. Unit Name:
Indian Point No. 3 Nuclear Power pl e t
- 2. Reporting Period:.Tulv 82
- 3. Licensed Thermal Power IMWr):
3025
- 4. Nameplate Rating (Gross SIWE):
1013 965
- 5. Design Electrical Rating (Net 5tWe):
7 926
- 6. Maximum Dependable Capacity (Gross MWe):
891
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- ! s
- 9. Power Level To Which Restricted,If Any (Net MWe):
- 10. Reasons For Restrictions.If Any:
Yr..to.Date Cumutative' This Month 744 5,087.0 5'1,888.0
- 11. Hours in Reporting Period
- 12. Number Of Houn Reactor Was Critical c
1,984.6 34,090.8
- 13. Reactor Resene Shutdown Houn 0
0 0
- 14. Hours Generator On-Line 0
1,969.4 32,913.1
-15. Unit Reserse Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 0 5.060.030 86.143,401
- 17. Gross Electrical Energy Generated (MWH) 0 1.502.170 26.299.300 0
1,436,036 25,183,443
- 18. Net Electrical Energy Generated (MWHg
- 19. Unit Service Factor 0
38.7 63.4
- 20. Unit Availability Factor 0
3R.7 63.4
- 21. Unit Capacity Factor (Using MDC Nets o
31.7 54.5
- 22. Unit Capacity Factor (Using DER Net) 0 29.3 50.3 I
- 23. Unit Forced Outage Rate 0
2.3 14.3
- 24. Shutdowns Scheduled Over Next 6 Months IType.Date,and Duration of Eacht:
Refoolinn outane in nroarens.
Upon completion of scheduled Maintenance 2S, if Shut Down At End Of Report Period. Estimated Date of Startup:
N-Mr LT e R')
- 26. L* nits In Test Status (Prior to Commercial Operationi:
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCI AL OPER ATION 8209240101 820811 PDR ADDCK 05000286 R
PDR enn
50-286 UNITSIlUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNITNAME Indian Point No. 3 DATE Angunt 1.
1992 COMPLETED BY L.
Auterino REPORT MONTil July 82 TELEPIIONE (9141 779-9200 "s
c r,
~5.a =
.2 _e g
9.c X Licensee P.
g" Cause & Corrective c
8 ".
No.
Date g
3g jg5 Event u?
Action to
'$3 5
j15 Report #
tN0 Prevent Recurrence Q
04 820325 S
744 B&C N/A N/A N/A Unit in a scheduled cycle III-IV refueling and maintenance outage.
I 2
3 4
F: Forced Reason:
Method:
Exhibit. Inst ructions S: Scheduled A Equiprnent Failure (Explain) 1 Manual for Preparation of Data Il-Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 4 Other(Explain) 0161)
E Operator Training & License Examination F Administrative 5
G-Operational Enor (Explain)
Exhibit, Same Source to/77)
Il Ot her (Explain)
AVERAGE D AILY UNIT POWER LEVEL DOCKET NO.
50-286 Indian Point UNIT Mn 3 DATE August 1, 1982 COMPLETED BY L.
Auterino TELEPHONE (914) 739-8200 MONTH July 82 i
DAY-AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL I
(MWe-Net)
(MWe-Net) 1 0
g7 0
2 0
gg 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
S 0
24 0
9 0
25 0
l 10 0
26 0
11 0
27 0.
I2 0
28
.0 13 0
29 0
14 0
0 30 15 0
O 3;
I6 0
LNSTRUCTIONS On this forrnat, list the average daily unit power lesel in MWe Net for each day in the reporting month. Compute to the nearest whole rnegawatt.
(9/77) i t
MOtiTilLY I & C CATEGORY I REPORT l
July 1982 1
Month i
d
}
W.R.
flo.
DATE EQUIPMEtiT MALFUt3CTIOtl' CORRECTIVE ACTIOt1 9
j IC-1-1580-2 7-19-82
- 32 & #35 Zurn Strainers,
Delta P Switches Sticking Replaced and calibrated switcher i
IC-1-1632-2 6-14-82 Control Rod Positicn Poor Connection at Replaced connectors for RPI Indication Connectors for Conditioner Nos. D12, E9, K2, F14,118 and bistable cards in CCR j
IC-1-1690-2 6-7-82 R17B Ccmponent Cooling Sticking Check Source Replaced Check Source Solenoid i
Water Radiation bbnitor IC-1-1694-2 7-13-82 ICV-1032D - #31 Waste Gas Does not control at procer Repaired loose connection to Ocupressor Drain Valve level pressure switch
\\. '
L IC-1-1698-2 6-1-82 PM-406G ABFP #33 I/P Inproper output Replaced I/P Converter s
,ji (bnverter I;,
IC-1-1700-2 5-28-82 PP-425 RCS Flow Trans-Poor repeatability during Replaced transmitter amplifier j
mitter calibration force motor, assenbly and force
[
bar assanbly
[)
IC-3 -1775-2 7-3-82 R10 Area Radiation Shorted Power Supply Replaced Power Supply Transform ll Monitor Transfonner ll
~
IC-1-1748-2 7-14-82 R5 Fuel Storage Bldg.
Power Supply Transfonner Replaced transforner and' power j
Area Radiation Fbnitor burned up supply couponents I
l i
?
MONTHLY MAINTENANCE REPORT anly lon?
Month ln d
- DATP, EQUIPMENT MALFUNCTION CORRECTIVE ACTION 2809 7/23/82 Value 1616 - N to Nuclear Leaks by Replace Valve 2
Equipment to Nuclear Leaks by Replace Seals and Gasxet 2812 7/23/82 Valve 863 - N2 Equipment 2860 7/06/82 Vapor Containment Wall Insulation Separating from Liner Rescal Insulation Insulation 2862 7/06/82 WCCPP to V.C.
Penetrations Cover Plates Missing
-Replace Cover Plater, 2910 7/06/82 WCCPP Rack 16 - V.C. Liner Broken Test Connection Install New Connector and' Plug 2511 7/06/82 WCCPP Rack 14 - V.C. Liner Broken Test Connection Install New Connector and Plug 2912 7/06/82 PCV-1191-VC Press. Relief Valve Sticks Clean Valve 2913 7/23/82 MOV-535-Power Op. Relief Valve Sticks Replace Operator Block Valve 2915 7/06/82 PCV-ll89-City Water to Aux Indicating Light Broken Replace Limit Switch Boiler Feed Pump 2918 7/23/82 Valve 204A-Charging line Indicating Light Broken Adjust and Clean Limit Switch Isolation 2931 7/06/d2 32 Instrument Air Dryer Refrigerant Level Low Charge with Freon 12 2932 7/06/82 31 Instrument Air Dryer Refrigerant Level Low Charge with Freon 12 2933 7/06/82 PCV-1191-V.C. Press. Relie:
Does Not Cycle Cleaned Valve Switch 2936 7/26/82 Valve 885A Container Container Flange Leaks Replace Gasket 2952 7/26/82 Valve 204A-Charging Line Dual Indication in Control Room Adjust Mechanical Linkage Isolation 2954 7/26/82 34 Fan Cooler Unit Leaks Repair Leaks Motor Cooler
l 1
a 4
0 9
9 O
en N
i*
O L
h I
e 2
t T
m 8
n C
o 9
o A
r 1
M F
s E
y g
V e
n l
I u
g i
T a
R J
C e
k E
s c
"O R
o o
R l
l l
O B
C d
d e
d e
c e
c a
r a
l a
l p
e p
e l
e R
C R
TRO PER E
1 C
tO l
tA IT 1
tE C
T N
U 3
t I
F A
L M
A M
Y e
L liT d
1 O
e M
s k
s k
c k
a o
a 9
e l
e L
B L
f t
i le e
R so e
g s
I I
a s
t t r
e i e o
r T
nl t e P
U n S n i
t I
i E
r dL C.
M er i
P l e ce V
I ol A l, UQ oo p
C o cm 1
E C
i a 9
n rS 1
ar o
1 F o Bk t
n V
1 o 1 a C
3 M 3 T P
+)
2 2
2 8
8 8
/
/
/
E 6
6 6
T 2
2 2
A
/
/
/
D 7
7 7
b i
0 2
6 6
7 7
d 9
9 9
2 2
2 P
k ll
\\
4 Indian Point Unit 3 remained shutdown for the entire reporting period. Replacement of containment fan cooling coils and main turbine spindles continue.
Preparation for steam generator sleeving operation is in progress.
.