Interim Deficiency Rept Re Failure of MSIVs to Operate Properly Due to Improper Onsite Assembly of Belleville Washers.Initially Reported on 820217.Assembly Caused Valve Stem to Bind.Investigation Continuing.Next Rept by 821112
ML20071K313
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 07/16/1982
From: Wells D
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, EF2-58751, NUDOCS 8208020065
Download: ML20071K313 (2)


Text

r.

Jgg

~~.

Donald A. Wells k

gega y Asswance Edison 1BE=b July 16, 1982 EF2-58751 Mr. James G. Keppler, Regional Administrator Region III U.S. Nuclear Regulatory Ccmnission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Subject:

Interim Report of 10CFR50.55(e) Item on Failure of Main Steam Isolation Valves (#56)

Dear Mr. Keppler:

This additional interim report on the failure of Main Steam Isolation Valve (s) problem has been prepared to provide you with the current status of this problem.

This item was originally reported to Mr. P. Byron of NRC Region III by Detroit Edison's Mr. H.A. Walker, Supervisor-Construction Quality Assurance on February 17, 1982.

Four motor operated Main Steam Isolation Valves located in the Turbine Building had failed to operate due to improper assembly. This improper on-site assembly of the Belleville washers on the packing retainer caused the valve stem to bind and did not allow the valve to open or close. These isolation valves are the third valves in the series away frcm the Reactor which were added per NRC requirements.

Detroit Edison is continuing to investigate this problem in order to provide an appropriate corrective action (e.g. training of personnel and/or changing of procedures) covering the valve assembly to prevent recurrence of the problem.

Another report on this item, either interim or final, is scheduled. to be sent to you on or before November 12, 1982. If you have questions conceming this matter, please contact Mr. D. Ferencz, Supervisor-Construction Quality Assurance.

Very truly yours, I

/

DAW /DF/mk aggeg2 goy $0 d1 JO( 7; 3 N oo PDR S

"o Mr. James Keppler, Regional' Administrator

-July 16,.1982 Page h o' EF2-58751 cc: Mr. Richard DeYoung,-Director

. Office of Inspection and Enforcement Division of Reactor Inspection Programs-

- U.S. Nuclear Regulatory Camtission Washington, D.C.

20555 Mr. Bruce Little, Resident Inspector U.S. Nuclear Regulatory Comnission 4650 North Dixie Highway Newport, Michigan 48166 i