'l APPENDIX B AVERAGE DAILY POWER LEVEL' DOCKET NO. 050-0325 UNIT BRUNSWICE UNIT 1 DATE 04/01/82 COMPLETED BY FRANCES HARRISON TELEPHONE 919-45:7-9521 MARCH 82 DAf AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET)

(MWE-NET) 1 744.

17 496.

2 738.

18 495.

3 736.

19 494.

4 735.

20 497.

5 671.

21 496.

6 570.

22 495.

7 742.

23 493.

8 739.

24 332.

9 739.

25 465.

10

742, 26 448.

11 698.

27 448.

12 503.

28 450.

13 498.

29 448.

14 500.

30 441.

15 499.

31 455.

16 498.

1.16 - 8 8204270333

OPERATING DATA REPORT DOCKET NO. 050-0325 DATE 04/01/82 COMPLETED BY FRANCES HARRISON TELEPHONE 919-457-9521 OPERATING STATUS 1.

UNIT NAME: BRUNSWICK UNIT 1 I NOTES I

J

2. REPORTING PERIOD: MARCH 82 I

I

3. LICENSED THERMAL POWER (MWT): 2436 I

I

4. NAMEPLATE RATING (GROSS MWE): 867.0 I

I

5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 I

I

6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I I
7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0 8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE 4

11. HOURS IN REPORTING PERIOD 744.0 2160.0 44161.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 1952.3 30217.6
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1647.1
14. HOURS GENERATOR ON LINE 744.0 1899.5 28439.1
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0

- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1299464.5 3824802.9 58242607.6

17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 429265.0 1243615.0 19244820.0
18. NET ELECTRICIAL ENERGY GENERATED (MWH) 415304.0 1201957.0 18505448.0 l
19. UNIT SERVICE FACTOR 100.0 87.9 64.4
20. UNIT AVAILABILITY FACTOR 100.0 87.9 64.4 i
21. UNIT CAPACITY FACTOR (USING MDC NET) 70.7 70.4 53.0 l
22. UNIT CAPACITY FACTOR (USING DER NET) 68.0 67.8 51.0 3
23. UNIT FORCED OUTAGE RATE 0.0 5.5 21.1
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

i i

i

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:

0/ 0/ 0

26. UNITS IN TEST-STATUS (PRIOR TO COMMERICIAL OPERATION): FORCAST ACHEIVED l

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERICIAL OPERATION l-1.16 - 9

I l'

APPENDIX-Docket No:

050-325 Unit:

Brunswick No. 1 Date: ' March 1982 Completed By: Frances Harrison OPERATIONS.

SUMMARY

BRUNSWICK UNIT NO. I r

1-Brunswick Unit No. 1 operated at 100 percent availability factor ~for the month

- of' February with a.70.7 percent capacity factor.

There are 476 BWR and 160 PWR spent fuel hundles in the Brunswick Unit No. 1-fuel pool.

t i

e I

+

L

?

I, e-i t

I t

t t

4

. _... _ _. _ _... ~ _ _

1;1

?

APPENDIX B AVERAGE DAILY POWER LEVEL I

DOCKET NO. 050-0324 UNIT BRUNSWICK UNIT 2 l

DATE 04/01/82 COMPLETED BY FRANCES HARRISON l TELEPHONE 919-457-9521' i

MARCH 82 l

DAY AVC. DAILY POWER LEVEL DAY AVC. DAILY POWER LEVEL j

(MWE-NET)

(MWE-NET) 1 629.

17 587.

2 488.

18

614, 3

608.

19 613.

4 591.

20 574.

5 622.

21 418.

r 6

625.

22 559.

7 625.

23 592.

8 624.

24 547.

9 620.

25 551.

le 620.

26 550.

11 617.

27 550.

r 12 571.

28 531.

t i

13 287.

29 525.

l 14 54.

30 553.

I 15 532.

31 544.

l 16 595.

l l

l I

1.16 - 8

OPERATINC DATA REPORT DOCKET NO. 050-0324 DATE 04/01/82 COMPLETED BY FRANCES HARRISON TELEPHONE 919-457-9521 OPERATING STATUS

1. UNIT NAME: BRUNSWICK UNIT 2 I NOTES I
2. REPORTING PERIOD: MARCH 82 I

I

3. LICENSED THERMAL POWER (MWT): 2436 I

I 4.

NAMEPLATE RATING (GROSS MWE): 867.0 I

I

5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 I

I 6.

MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I I

7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0 8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE

10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTINL. PERIOD 744.0 2160.0 56185.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 725.5 1892.9 37059.8
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON LINE 720.4 1831.8 34601.1
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1347895.7 3400325.8 63397863.4
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 423788.0 1976474.0 21070411.0
18. NET ELECTRICIAL ENERG( GENERATED (MWH) 408369.0 1036856.0 20226269.0
19. UNIT SERVICE FACTOR 96.8 84.8 61.6
20. UNIT AVAILABILITY FACTOR 96.8 84.8 61.6
21. UNIT CAPACITY FACTOR (USING MDC NET) 69.5 60.8 45.6
22. UNIT CAPACITY FACTOR (USING DER NET) 66.9 58.5 43.8 4
23. UNIT FORCED OUTAGE RATE 3.1 15.1 17.0
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATER AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:

0/ O/ 0

26. UNITS IN TEST STATUS (PRIOR TO COMMERICIAL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY INITIAL ELECTRICIT)

COMMERICIAL OPERATION 1.16 - 9

4.

APPENDIX-Docket No: 050-324 Unit:

Brunswick No. 2 Date: March 1982 Completed By: Frances Harrison OPERATIONS

SUMMARY

BRUNSWICK UNIT NO. 2

. Brunswick Unit No. 2 operated at 96.8 percent. availability factor for the~ month of February with a 69.5 percent capacity factor. There was one off-line outage this month. -It is detailed in Appendix D, the unit shutdowns and power

.-reduction log.

There are 264 BWR and 144 PWR spent fuel bundles in the Brunswick Unit No. 2 fuel pool.

i 4

t i

i

DOCKET NO. _050-0324 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Brunswick 2 DATE April 1982 COMPLETED BY Frances Harrison 11 arch 1982 REPORT MONT11 TELEPilONE (919) 457-9521

... ~5 E

.5 g

'h 452 Licensee 5 r, K

Cause & Corrective No.

Date F

EE

_s E c~3 Event tt ?

o-3 Action to Report :

N0

$O Prevent Recurrence S

j$

5d -

v e

C 81-040 820313 F

23.6 A

3 N/A IA INSTRU Reactor scram on LLI signal at a more conservative setpoint than required while placing a second RFP-in service.

N017 level switches were calibrated

  • and setpoints realljusted.

1 I

2 3

4 F: Forced Reason:

Method:

Exhibit G Instructions S: Scheduled A liguipment Failure (Explain) 1-Manual for Preparation of Data i

B Maintenance of Test 2 Manual Seram.

Entry Sheets for Liechsee C Refueling 3 Automatic Scram.

Event Report (LER) FileINUREG.

D Regulatory Restriction 4 Continuations 0161)

E-Operator Training & License Examination "

5-Load Reductions 5

F-Administrative 6-Other Exhibit 1. Same Source G Operational Error (Explain) 19/77)

Il-Other (Explain)