'l APPENDIX B AVERAGE DAILY POWER LEVEL' DOCKET NO. 050-0325 UNIT BRUNSWICE UNIT 1 DATE 04/01/82 COMPLETED BY FRANCES HARRISON TELEPHONE 919-45:7-9521 MARCH 82 DAf AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET)
(MWE-NET) 1 744.
17 496.
2 738.
18 495.
3 736.
19 494.
4 735.
20 497.
5 671.
21 496.
6 570.
22 495.
7 742.
23 493.
8 739.
24 332.
9 739.
25 465.
10
- 742, 26 448.
11 698.
27 448.
12 503.
28 450.
13 498.
29 448.
14 500.
30 441.
15 499.
31 455.
16 498.
1.16 - 8 8204270333
OPERATING DATA REPORT DOCKET NO. 050-0325 DATE 04/01/82 COMPLETED BY FRANCES HARRISON TELEPHONE 919-457-9521 OPERATING STATUS 1.
UNIT NAME: BRUNSWICK UNIT 1 I NOTES I
J
- 2. REPORTING PERIOD: MARCH 82 I
I
- 3. LICENSED THERMAL POWER (MWT): 2436 I
I
- 4. NAMEPLATE RATING (GROSS MWE): 867.0 I
I
- 5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 I
I
- 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I I
- 7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE
- 10. REASONS FOR RESTRICTION IF ANY:
THIS YR TO CUMUL MONTH DATE ATIVE 4
- 11. HOURS IN REPORTING PERIOD 744.0 2160.0 44161.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 1952.3 30217.6
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1647.1
- 14. HOURS GENERATOR ON LINE 744.0 1899.5 28439.1
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1299464.5 3824802.9 58242607.6
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 429265.0 1243615.0 19244820.0
- 18. NET ELECTRICIAL ENERGY GENERATED (MWH) 415304.0 1201957.0 18505448.0 l
- 19. UNIT SERVICE FACTOR 100.0 87.9 64.4
- 20. UNIT AVAILABILITY FACTOR 100.0 87.9 64.4 i
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 70.7 70.4 53.0 l
- 22. UNIT CAPACITY FACTOR (USING DER NET) 68.0 67.8 51.0 3
- 23. UNIT FORCED OUTAGE RATE 0.0 5.5 21.1
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
i i
i
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
0/ 0/ 0
- 26. UNITS IN TEST-STATUS (PRIOR TO COMMERICIAL OPERATION): FORCAST ACHEIVED l
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERICIAL OPERATION l-1.16 - 9
I l'
APPENDIX-Docket No:
050-325 Unit:
Brunswick No. 1 Date: ' March 1982 Completed By: Frances Harrison OPERATIONS.
SUMMARY
BRUNSWICK UNIT NO. I r
1-Brunswick Unit No. 1 operated at 100 percent availability factor ~for the month
- of' February with a.70.7 percent capacity factor.
There are 476 BWR and 160 PWR spent fuel hundles in the Brunswick Unit No. 1-fuel pool.
t i
e I
+
L
?
I, e-i t
I t
t t
4
. _... _ _. _ _... ~ _ _
1;1
?
APPENDIX B AVERAGE DAILY POWER LEVEL I
DOCKET NO. 050-0324 UNIT BRUNSWICK UNIT 2 l
DATE 04/01/82 COMPLETED BY FRANCES HARRISON l TELEPHONE 919-457-9521' i
MARCH 82 l
DAY AVC. DAILY POWER LEVEL DAY AVC. DAILY POWER LEVEL j
(MWE-NET)
(MWE-NET) 1 629.
17 587.
2 488.
18
- 614, 3
608.
19 613.
4 591.
20 574.
5 622.
21 418.
r 6
625.
22 559.
7 625.
23 592.
8 624.
24 547.
9 620.
25 551.
le 620.
26 550.
11 617.
27 550.
r 12 571.
28 531.
t i
13 287.
29 525.
l 14 54.
30 553.
I 15 532.
31 544.
l 16 595.
l l
l I
1.16 - 8
OPERATINC DATA REPORT DOCKET NO. 050-0324 DATE 04/01/82 COMPLETED BY FRANCES HARRISON TELEPHONE 919-457-9521 OPERATING STATUS
- 1. UNIT NAME: BRUNSWICK UNIT 2 I NOTES I
- 2. REPORTING PERIOD: MARCH 82 I
I
- 3. LICENSED THERMAL POWER (MWT): 2436 I
I 4.
NAMEPLATE RATING (GROSS MWE): 867.0 I
I
- 5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 I
I 6.
MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I I
- 7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE
- 10. REASONS FOR RESTRICTION IF ANY:
THIS YR TO CUMUL MONTH DATE ATIVE
- 11. HOURS IN REPORTINL. PERIOD 744.0 2160.0 56185.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 725.5 1892.9 37059.8
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 14. HOURS GENERATOR ON LINE 720.4 1831.8 34601.1
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1347895.7 3400325.8 63397863.4
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 423788.0 1976474.0 21070411.0
- 18. NET ELECTRICIAL ENERG( GENERATED (MWH) 408369.0 1036856.0 20226269.0
- 19. UNIT SERVICE FACTOR 96.8 84.8 61.6
- 20. UNIT AVAILABILITY FACTOR 96.8 84.8 61.6
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 69.5 60.8 45.6
- 22. UNIT CAPACITY FACTOR (USING DER NET) 66.9 58.5 43.8 4
- 23. UNIT FORCED OUTAGE RATE 3.1 15.1 17.0
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATER AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
0/ O/ 0
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERICIAL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY INITIAL ELECTRICIT)
COMMERICIAL OPERATION 1.16 - 9
4.
APPENDIX-Docket No: 050-324 Unit:
Brunswick No. 2 Date: March 1982 Completed By: Frances Harrison OPERATIONS
SUMMARY
BRUNSWICK UNIT NO. 2
. Brunswick Unit No. 2 operated at 96.8 percent. availability factor for the~ month of February with a 69.5 percent capacity factor. There was one off-line outage this month. -It is detailed in Appendix D, the unit shutdowns and power
.-reduction log.
There are 264 BWR and 144 PWR spent fuel bundles in the Brunswick Unit No. 2 fuel pool.
i 4
t i
i
DOCKET NO. _050-0324 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Brunswick 2 DATE April 1982 COMPLETED BY Frances Harrison 11 arch 1982 REPORT MONT11 TELEPilONE (919) 457-9521
... ~5 E
.5 g
'h 452 Licensee 5 r, K
Cause & Corrective No.
Date F
EE
_s E c~3 Event tt ?
o-3 Action to Report :
N0
$O Prevent Recurrence S
j$
5d -
v e
C 81-040 820313 F
23.6 A
3 N/A IA INSTRU Reactor scram on LLI signal at a more conservative setpoint than required while placing a second RFP-in service.
N017 level switches were calibrated
- and setpoints realljusted.
1 I
2 3
4 F: Forced Reason:
Method:
Exhibit G Instructions S: Scheduled A liguipment Failure (Explain) 1-Manual for Preparation of Data i
B Maintenance of Test 2 Manual Seram.
Entry Sheets for Liechsee C Refueling 3 Automatic Scram.
Event Report (LER) FileINUREG.
D Regulatory Restriction 4 Continuations 0161)
E-Operator Training & License Examination "
5-Load Reductions 5
F-Administrative 6-Other Exhibit 1. Same Source G Operational Error (Explain) 19/77)
Il-Other (Explain)