1 GPU Nuclear g

g7 P.O. Box 388 Forked River, New Jersey 08731 609-693-6000 Writer's Direct Dial Number:

May 20, 1983 Mr. Darrell G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission Washing ton, D.C.

20555

Dear Mr. Eisenhut:

Subj ect:

Oyster Creek Nuclear Generating Station Docket No. 50-219 Post Accident Sampling System (NUREG 0737, item 11.B.3)

Referenc e: April 15, 1983, letter from D. G. Eisenhut, NRC to P. B. Fiedler GPUN (Cycle 10 Refueling Outage Workload)

The purpose of this letter is to update our April 15, 1983 cor re spondence regarding the installation and operability of the Post Accident Sampling System (PASS) at Oyster Creek. On May 12, 1983, a meeting was conducted at Oyster Creek between members of your staf f, NRC Regional Management, and GPUN Management. At that meeting we agreed to the following:

1.

All installation work, which requires the plant to be in a shutdown condition, will be completed during the current refueling outage.

2.

PASS will be fully operational withire six (6) months af ter startup f rom our current refueling outage.

3.

An alternate methodology will be developed and demonstrated during our upcoming May 24, 1983, Emergency Preparedness Drill, that estimates the extent of post accident core degradation.

OYb F305270082 830520 PDR ADOCK 05000219 P

PDR GPU Nuclear is a part of the General Pubhc Utihties System

b D. C. Eisenhut May 20, 1983 Should the outage be extended beyond its established time-f rame, further discussion on the operability date of the Post Accident Sampling System may be necessary. If you have any further questions, please contact Mr. M. Laggart, Oyster Creek Licensing Manager, at (609) 971-4643.

Very truly yours, Peter B. Fiedler Vice President and Director Oyster Creek PBF:jal cc: