, _ _ _ _ _ _ _
ATTACHMENT A Monthly Operating Report March, 1982 82042@o%d 1
I '
A OPERATIN' G DATA REPORT DOCKET NO.
50-247 DATE 4 8i-89 COMPLETED BY F _ F _ F i <- h TELEPHONE (9I4)a26-5155 OPERATING STATUS Indian Point Unit No. 2 Notes
- 1. Unit Name:
March, 1982
- 2. Reporting Period:
2
- 3. Licensed T' ermal Power (MWt):
- 4. Namepla'? dating (Gross MWe):
1011
- 5. Desigr clectrical Rating (Net MWe):
Q73
- 6. Maximum Dependable Capacity (Gross MWe):
4nn 864
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occurin Cap 1 city Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A None
- 9. Power LevelTo Which Restricted.lf AnygNef MWe).
- 10. Reasons For Restrictions. If Any:
This Month Yr.-to-Date Cumulative 744 2160 67945
- 11. Hours In Reporting Period 744 2140.18 44461.71
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours 0
0 1527.43
- 14. Hours Generator On-Line 744 2128.32 43239.32 0
0 0
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 2013835 5743527 112058102
- 17. Gross Electrical Energy Generated (MWH) 63131_0 1816270 34655586 606785 1744417 33029073
- 18. Net Electrical Energy Generated (MWH) 100.0 98.5 63.6
- 19. Unit Service Factor
- 20. Unit Availability Factor 100.0 98.5 63.6
- 21. Unit Capacity Factor (Using MDC Net) -
94.4 93.5 56.5 93.4 92.5 SS.7
- 22. Unit Capacity Factor lUsing DER Net) 0 1.5 9.1
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each1:
Refueling Outage, September 1, 1982
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status IPrior ao Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY N/A COMMERCIAL OPERATION (9/77)
AVERAGE DAILY UNIT P0hER LEVEL DOCKET NO.
50-247 I.P. Unit #2 UNIT DATE 4-5-82 COMPLETED By E.F.Eich (914)S26-5155 TELEPHONE March, 1982 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(
-Net) 841 1
37 2
836 842 is 3
832 843 1,
827 842 4
2e 828 842 5
21 828 841 6
22 828 728 7
23 825 445 s
24 9
808 809 25 81 0 W
to 26 81 9 11 830 27 824 12 840 28 824 13 835 823 836 14 3,
838 839 15 3,
843 16 INSTRUCTIONS On this format. list the average daily unit power level in MWe Net for each day in the report;ng month. Compute to the nearest whole megawatt.
f (9/77i
50-247 DOCKET NO.
UNITSHUTDOWNS AND POWER REDUCTIONS UNIT NAME I.P.llnit #2 DATE 4-5-87 REPORT MONTil March, 1982 COMPLETED BY E.F.Eich TELEPilONE (914)526-5155 We E
E
.! E 3
- I5 Licensee
[g E*L Cause & Corrective No.
Date h
3g s
2s&
Event
~?
hl g
Action to O
H yE E
~gg Report #
mU o
Present Recurrence e
u O
N/A 3-24-82 S
0 B
4 None HB Valve X Reduced load for Turbine Stop F
Valve Test.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G -Instructions S: Scheduled A Equiprnent Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C Refueling 3 Automatic Scram.
Event Report (LERI File tNUREG-D Regulatory Restriction 40ther ( Explain) 0161)
E Operator Training & License Examination F-Administratise 5
G-Operational Error (Explain)
E shibit 1 - Same Source 19/77) ll-Other ( Explain)
SUMMARY
OF OPERATING EXPERIENCE Docket No.
50-247 Date:
4/12/82 C mpleted by:
J. Curry o
Telephone:
(914) 526-5235 Indian Point No. 2 began the month of March,1982 operating at 100% reactor power.
Circulating Water Pump No. 25 was removed from service on Tuesday, March 2 and disassembly of the pump revealed the shaf t broken at the bottom of the shaf t packing gland.
A replacement pump was installed by March 15 and the unit was again operating at an electrical output of approximately 880 MWe.
l On March 23 Indian Point Unit No. 2 output was reduced to 325 MWe to conduct a required main turbine stop and control valve closure test.
Four control valver. and three stop valves were successfully tested, but the fourth stop l
valve could not be stroked due to an inoperable test mechanism.
The inoperability of the test mechanism would not have prevented valve closure i
upon receipt of a legitimate close signal.
The repair and test of the test mechanism could not be accomplished within the allowable maximum time between tests. A fif teen-daf extension to the maximue time between tests was granted by the Nuclear Regulatory Commission. The unit output was raised to j
approximately 880 MWe on the morning of March 25 and operated at this level for the rest of the month.
L
Dockat No.
50-247 MECHANICAL AND ELECTRICAL MAINTENANCE Completed by:
Telephone:
March, 1982 indian Point Unit No. 2 1
NO APPLICABLE ITEMS REPORTED FOR THE PERIOD OF MARCH, 1982.
1 1
9 e
1
ATTACHMENT B Amended Monthly Operating Report February, 1982 Amendments 1.
The number 110, 044, 267 in line 17 under the " cumulative =
column was changed to 34, 024, 276 in the sheet entitled
" Operating Data Report."
2.
The capital letter "A" was added to the " Component Code" column in the sheet entitled " Unit Shutdown and Power Reductions."
5 l
l
(
(
l-
a 4
OPERATING DATA REPORT 50-247 DOCKET NO.
DATE JN4 COMPLETED BY E.F.
Eich TELEPHONE f914) 526-5155 OPERATING STATUS Indian Point Unit No. 2 Notes I. Unit Name:
On February 2, core Febru m 1982
- 2. Reporting Penod:
burn-up amounted to 50% of
- 3. Licensed Thermal Power (MWtp:
the expected lifetime of
- 4. Namep!ste Rating (Gross MWe):
the present fuel cycle.
873
- 5. Design Electrical Rating (Net MWe):
900
- 6. Maximum Dependable Capacity (Gross MWe):
0
- 7. Maximum Dependable Capacity (Net 51We):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A NONE
- 9. Power Level To Which Restricted. If Any (Net MWe):
- 10. Reasons For Restrictions. !f Any:
N/A This Month Yr. to-Dase Cumulative 672 1416 67201
- 11. Hours in Reporting Period
- 12. Number Of liours Reactor Was Critical 0
0 1527.43
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line 640.32 1384.32 42495.32 0
0 0
- 15. Unit Reserve Shutdown Hours 1730 444 3729 692 110 044 267
- 16. Gross Thermal Energy Generated (MWII) 548 400 1184 900 34 024 276
[
- 17. Gross Electrical Energy Generated (MWil) 526 159 1137 632 32 422 288
- 18. Net Electrical Energy Generated (MWil)
.8 63.2
- 19. Unit Service Factor
.8 63.2 l
- 20. Unit Availability Factor 90.6 93.0 56.1
- 31. Unit Capacity Factor (Using MDC Net) 8 9
.0 55.3
- 22. Unit Capacity Factor IU>ing DER Net) 4.7 2.2 9.9
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Ne.st 6 Months (Type. Date,and Duration of Each t:
l
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
[
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved
's INITIAL CRIT!CA LITY INITIAL ELLClRICITY
s l
COMMERCIAL OPER ATION N
N/A
\\
(
\\
tu/77) i 1
50-247 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
1.P. m W.
2 UNIT NAME DATE 3/s/82 FEB. 1982 COMPLETED BY E.F.
EICil REPORT MONTil TELEPilONE f9141526-5152 "L.
.! ?
3
.E Licensec
,E r, h
Cause & Correceive -
No.
Date g
3g
.5 g 5 Eveos n '2 c.3 Aciion to
$5 Ji 5 9 Report #
viG
!O Present Recurrence H
{
v e
Q l
2/6/82 F
31.68 A
3 EB CKTBRK I,OSS OF 480v BUS SECTION 2A.
REPLACED BREAKER OVERCURRENT TRIP A
DEVICES FOR PilASES A & C I
2 3
4 F: Forced Reason:
Method:
Exhibit G Instructions 5: Scheduled A Equipment failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C Refueling 3 Automatic Scram.
Event Report ILERI File INUREG-D Regulatory Restriction 4-Other ( Explain) 0161i E-Operator Training & License Examination F. Ad minist rative 5
G-Operational E:ror (Explain)
E stubii l - Same Source 19/77) 11OitieriEsplaint