ML20071H966

From kanterella
Jump to navigation Jump to search
Submits List of Procedures Changed to Require Independent Engineering Analysis on Reactor Trips.Analysis Will Use Reactor Trip Checklist to Ensure Appropriate Parameters Considered.Performance Engineer to Document Review
ML20071H966
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 05/20/1983
From: Tucker H
DUKE POWER CO.
To: Adensam E, Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8305250549
Download: ML20071H966 (2)


Text

5

.e g

DuxE POWER COMPANY P.O. BOX 33189 CHARLOTTE, N.C. 28242 HALB. TUCKER TELEPHONE me e.

m (704) 073-4531 May 20, 1983 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington' D.~C. 20555 Attention:

Ms. E. G. Adensam, Chief Licensing Branch No. 4 Re: McGuire Nuclear Station Docket Nos. 50-369, 50-370

Dear Mr. Denton:

In response to discussions with members of your staff, Duke Power Company has agreed to clarify certain administrative practices regarding evaluation of reactor trips.

In order to clarify these requirements concerning proper evaluation of reactor trips, the operating procedures covering reactor trip recovery and unit startup have been revised to require notification of the duty Performance Engineer prior

-to unit restart.

The duty Performance Engineer is responsible for performing an independent engineering analysis on all reactor trips except for those that are a direct result of operator error. This analysis will be performed using a reactor trip checklist to ensure all appropriate parameters are considered.

The following procedures have been changed to require this analysis:

AP/1/A/5500/01 - Reactor Trip AP/2/A/5500/01 - Reactor Trip OP/1/A/6100/05 - Unit Fast Recovery OP/2/A/6100/05 - Unit Fast Recovery OP/1/A/6100/01 - Controlling Procedure for. Unit Startup OP/2/A/6100/01 - Controlling Procedure for Unit Startup These procedures require the duty Performance Engineer to document his review of the trip and _ to provide his reconnendation on restart to. the Operations Group prior.to restart of the unit.

Please advise if there are any questions regarding these revisions.

Very truly yours, 6

Hal B. Tucker GAC/php I

s30525o549 83o520 I p ifDRADOCK05000g

.I ew E'

I

__ J

_ y y

ks e

r,.

'.s

~-

y '_

U, i

.. +,.

..'f-Mr. Harold R.-Denton.. Director g(g Mayf20,1983 g

s Page' 2 -

c.

.e

_A is n

Y

+

d _.

'V,s

.. (:

s j :, &.

s y

s-

' # ' I f ' cc,: kMr.' James P. O'Reilly,' Regional Administrator

..m t-j U. S. Nuclear-Regulatory Cons.ission i

rd,'

Region II

- 5101 Marid.ta Street, W, Suite 2900 lk.g Atlanta',"Gnorgia'30303

.y g

V v ?,c J:g Mr. W..T. Or'ders er 3.

NRC Resident Inspector Ohr /:. i.

McGuire Nuclear Station

^

. g

e k

i

>; 1 e w

.V ~f -

L.

' (-

-(. y < -

Ys g

?,l-

'{

rI,.

h r

I, n

.x 1

'i s.

f

,i

=

1 A

4

.,1 s

f A

M-W 4

y.s V A ? :lN ^

?,

4 a.

.r

. n, sc-5 9-

-',).

-L,'

k,

.',w s

p

. 7.:

's.

'A., i.i

[_

-.sy s.'

g r

.g.-

s

[5

. O g _.

11

=

-u

a

?

l:

,l,

,. e y

,y r.

p..

,g..

-