Revised Second Interim Deficiency Rept Re Hardened Washers Not Used as Required by ASME Code,Initially Reported 810512. Vote on Authorization of Mild Steel Washers Scheduled for Apr,1982.Final Rept Will Be Submitted by 820604
ML20071H489
Person / Time
Site: Palo Verde  
Issue date: 02/22/1982
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-20228-GHD, DER-81-10, NUDOCS 8203080436
Download: ML20071H489 (4)


Text

Docket Nos. 50-528/529/530 J

Jg I

50 55(e) Report 7.,..

E"332,WM f

rf1 IFUEnfL2RD NEfN7RUDIi (DDTRRRGS??

PHOENIX. ARIZON A 85036 P. O. D OX 216 6 6 February 22, 1982 ANPP-20228-CllD/BSK U, S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 4;( gg-Walnut Creek, California 94596-5368 FEB 20 1993 Attention:

Mr. B.11. Faulkenberry, Chief Reactor Construction and Engineering Support Branch Subj ect:

Interim Report, Revision 2 - DER 81-10 m

A 50.55(e) Potentially Reportable Deficiency Relating S

to liardened Washers Not Used As Required by ASME Co File:

81-019-026

  • gEDElVgg,\\

D.4.33.2 Re'erence:

(A) Telephone Conversation between J. Eckhardt anC SQg

[

C. T. Lewis on May 12, 1981 h.

j v

(B) ANPP-18183, dated June 9, 1981 (Interim Report (C) ANPP-19520, dated November 20, 1981 (Interim co Report, Revision 1) fu

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), and Interim Reports were transmitted by References (B) and (C). At that time, it was estimated that a Final Report would be available by February 26, 1982.

Due to the extensive investigation and evaluation required, Revision 2 of the Interim Report is attached.

It is now expected that this infor-mation will be finalized by June 4, 1982, at which time a complete report will be submitted.

Very truly ours CQL qd E. E. Van Brunt, Jri APS Vice President Nuclear Projects ANPP Project Director EEVBJr/ Gild:ske.

Attachment ec: See Attached Page 2

\\E9]

8203080436 820222 I

P 05000528

()

G,DR ADOCK PDR l

t o

6a-5a

i

^*

U. S. Nuclear Rsgulatory Commission Attention:

Mr. B. H. Paulkenberry, Chief ANPP-20228-GHD/BSK February 22, 1982 Page 2 cc:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 J. A. Roedel D. B. Fasnacht C. C. Andognini F. W. Hartley J. M. Allen A. C. Rogers B. S. Kaplan W. E. Ide J. Vorces J. A. Brand A. C. Gehr W. J. Stubblefield W. C. Bingham R. L. Patterson R. W. Welcher R. M. Grant i

D. R. Hawkinson L. E. Vorderbrueggen R. L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 Ms. Patricia 1.ee Hourihan 6413 South 26th Street Phoenix, Arizona 85040 l

a INTERIM REPORT, REVISION 2 - DER 81-10 POTENTIAL REPORTABLE DEFICIENCY ARIZONA PUBLIC SERVICE COMPANY (APS)

PVNGS UNITS 1, 2 AND 3 I.

Potential Problem Specification 13-FM-209, Section 4.3.1.2, requires supports to be fabricated to ASME Section III, Subsection NF.

ASME Section III, Subsection NF, Paragraph 4724, requires bolts tightened by means of a calibrated torque wrench shall be installed with a hardened washer under the nut or head, whichever is the element turned in tightening.

Bechtel Supplier Quality Representative noted during surveillance inspection activities that supplier, ITT Grinnell, Warren, Ohio, was installing mild carbon steel washers under the bolt heads on Sizes 1, 3 and 10 mechanical shock suppressors (Figure 306, Pivot Mount, and Figure 307, Extension Assemblies).

On Sizes k and Figures 306 and 307 Shocks, the supplier had installed hardened brass washers.

II.

Approach To and Status Of Proposed Resolution Bechtel has been notified by Code Interpretation N1 81-163 (copy attached) that NF-4724 permits the use of hardened brass washers.

The Ballot Vote for the Code Case which is expected to authorize that mild steel washers may be used as an alternative to the hardened washers required by NF-4724, is scheduled for April, 1982.

III, Projected Completion of Corrective Action and Submittal of the Final Report The evaluation and final report are forecast to be completed by June 4, 1982.

i l

l L__

M Tho Amcrican Socinty of Mcchenical EnginOcro E--S United Engineenng Center

  • 345 E 47tn St. New Ybrk. N Y. 10017
  • 212 644 7722
  • TWX 710-5815267 Attachment to DER 81-10 January 18, 1982 Bechtel Group, Inc.

P.O. Box 3965 San Francisco, CA 94119 Att:

W. H. Borter

Subject:

Section III, Division 1 NF-4724 Bolt Tension

Reference:

Your letter of Octobert 21, la81 ASME File i NI 81-163 Gentlenen:

Our understanding of the question in your inquiry, an!. our reply are as follows:

Question: Does paragraph NF-4724 of ASME Section III permit the use of a hardened brass washer under the nut or bolt head which is turned in tightening, when high strength carbon or alloy steel bolts are tightened by means of a calibrated wrench?

I Reply: Yes.

Your truly, if W

John Millman Assistant Secretary (212) 644-8049 le ASME procedures provide for reconsideration of this interpretation when or if additional information is availabw wh6ch the inquirer behoves might affect the interpretation. Further, persons aggr6eved by this interpretation may appeal to the cognizant ASME committee or subcommittee. As stated in the f oreworts of the code pocumenta, ASME does not" approve,"" certify,"" rete."or"enoorse"any item construction, raoprietary device or activity.