|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217G7211999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Waterford 3 Ses. with ML20211Q2141999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Waterord 3 Ses.With ML20210Q6361999-07-31031 July 1999 Corrected Monthly Operating Rept for July 1999 for Waterford 3 ML20210S0581999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Waterford 3.With ML20209H3781999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Waterford 3 Ses. with ML20195K3391999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Waterford 3 Ses.With ML20206S7401999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Waterford 3.With ML20205N9671999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Waterford 3 Ses.With ML20204B5141999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Waterford 3.With ML20199C9101998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Waterford 3.With ML20206N4131998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Waterford 3.With ML20195E5161998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Waterford 3.With ML20154K0801998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Waterford 3 Ses. with ML20151W8331998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Waterford,Unit 3. with ML20237B5261998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Waterford 3 ML20236N4181998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Waterford,Unit 3 ML20249A4711998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Waterford 3 Ses ML20247F6761998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Waterford,Unit 3.W/ ML20216B1751998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Waterford 3 Ses ML20248L3621998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Waterford 3 ML20202G5091998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Waterford,Unit 3 ML20198M2301997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Waterford 3 Ses ML20203F9701997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Waterford 3 Ses ML20199B3491997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Waterford 3 Ses ML20217H9481997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Waterford 3 Ses ML20210T5421997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Waterford 3 ML20210J3541997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Waterford 3 ML20148K1691997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Waterford ML20141C8751997-04-30030 April 1997 Monthly Operating Rept for April 1997 for Wgs ML20137U7861997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Waterford 3 Ses ML20136H2661997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Waterford 3 ML20138K5841997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Waterford 3 Ses ML20133L9151996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Waterford 3 Ses ML20132B9441996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Waterford 3 Ses ML20134K5441996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Waterford 3 Ses ML20128P9921996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Waterford 3 Ses ML20129A6851996-08-31031 August 1996 Monthly Operating Rept for Waterford 3 Ses for Aug 1996 ML20116L0431996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Waterford 3 ML20115F0421996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Waterford 3 ML20117M9471996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Waterford 3 ML20117F6991996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Waterford Unit 3.W/ ML20107B9071996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Wateford 3 Ses.W/ ML20106H0741996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Waterford 3 Ses ML20097G0771996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Waterford 3 Ses ML20096C2761995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Waterford 3 Ses.W/ ML20095E6151995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Waterford 3 Ses ML20094L0261995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Waterford 3 ML20093D1731995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Waterford 3 ML20092D0181995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Waterford 3 ML20087H1001995-07-31031 July 1995 Monthly Operating Rept for July 1995 for Waterford 3 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217F2891999-10-13013 October 1999 Drill 99-08 Emergency Preparedness Exercise on 991013 ML20217G7211999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Waterford 3 Ses. with ML20211Q2141999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Waterord 3 Ses.With ML20210Q6361999-07-31031 July 1999 Corrected Monthly Operating Rept for July 1999 for Waterford 3 ML20210S0581999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Waterford 3.With ML20210D8951999-07-23023 July 1999 Safety Evaluation Accepting First 10-yr Interval Inservice Insp Plan Requests for Relief ISI-018 - ISI-020 ML20209H3781999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Waterford 3 Ses. with ML20195J8951999-06-17017 June 1999 Safety Evaluation Granting Relief for Listed ISI Parts for Current Interval,Per 10CFR50.55a(g)(5)(iii) ML20207E8631999-06-0303 June 1999 Safety Evaluation Accepting Licensee 990114 Submittal of one-time Request for Relief from ASME B&PV Code IST Requirements for Pressure Safety Valves at Plant,Unit 3 ML20195K3391999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Waterford 3 Ses.With ML20195C3041999-05-28028 May 1999 Annual Rept on Abb CE ECCS Performance Evaluation Models ML20206S7401999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Waterford 3.With ML20205T2621999-04-22022 April 1999 LER 99-S02-00:on 990216,contract Employee Inappropriately Granted Unescorted Access to Plant Protected Area.Caused by Personnel Error.Security Personnel Performed Review of Work & Work Area That Individual Was Involved with ML20205N9671999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Waterford 3 Ses.With ML20205E8531999-03-30030 March 1999 Corrected Pages COLR 3/4 1-4 & COLR 3/4 2-6 to Rev 1, Cycle 10, Colr ML20205A6331999-03-25025 March 1999 SER Accepting Request to Use Mechanical Nozzle Seal Assemblies as an Alternative Repair Method,Per 10CFR50.55a(a)(3)(i) for Reactor Coolant Sys Applications at Plant,Unit 3 ML20204H1401999-03-23023 March 1999 Rev 1 to Engineering Rept C-NOME-ER-0120, Design Evaluation of Various Applications at Waterford Unit 3 ML20204H1231999-03-22022 March 1999 Rev 1 to Design Rept C-PENG-DR-006, Addendum to Cenc Rept 1444 Analytical Rept for Waterford Unit 3 Piping ML20204H2451999-03-22022 March 1999 Rev 2 to C-NOME-SP-0067, Design Specification for Mechanical Nozzle Seal Assembly (Mnsa) Waterford Unit 3 ML20204F0791999-03-17017 March 1999 Rev 1 to Waterford 3 COLR for Cycle 10 ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results ML20207F3491999-03-0505 March 1999 LER 99-S01-00:on 990203,contraband Was Discovered in Plant Protected Area.Bottle Was Determined to Have Been There Since Original Plant Construction.Bottle Was Removed & Security Personnel Performed Search of Area.With ML20204B5141999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Waterford 3.With ML20203H8591999-02-17017 February 1999 Safety Evaluation Accepting Licensee Second Ten Year ISI Program & Associated Relief Requests for Plant,Unit 3 ML20199H6261999-01-21021 January 1999 Safety Evaluation Accepting Classification of Instrument Air Tubing & Components for Safety Related Valve Top Works.Staff Recommends That EOI Revise Licensing Basis to Permit Incorporation of Change ML20199C9101998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Waterford 3.With ML20196F4911998-12-0101 December 1998 SER Accepting Request for Relief ISI2-09 for Waterford Steam Electric Station,Unit 3 & Arkansas Nuclear One,Unit 2 ML20206N4131998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Waterford 3.With ML20195C4841998-11-0606 November 1998 SER Accepting QA Program Change to Consolidate Four Existing QA Programs for Arkansas Nuclear One,Grand Gulf Nuclear Station,River Bend Station & Waterford 3 Steam Electric Station Into Single QA Program ML20195E5161998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Waterford 3.With ML20155C1351998-10-26026 October 1998 Rev B to Entergy QA Program Manual ML20154K0801998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Waterford 3 Ses. with ML20151W8331998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Waterford,Unit 3. with ML20237B6831998-08-17017 August 1998 LER 98-S01-00:on 980723,discovered That Waterford 3 Physical Security Plan,Safeguards Document Was Not Under Positive Control of Authorized Person at All Times.Caused by Human Error/Inappropriate Action.Counseled Employee Involved ML20237C5661998-08-17017 August 1998 Safety Evaluation Accepting Licensee Request for Exemption from Section Iii.O of Appendix R to 10CFR50 ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML20237B5261998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Waterford 3 ML20236S9031998-07-22022 July 1998 SER Accepting Rev 19 to Quality Assurance Program for Waterford Steam Electric Station,Unit 3 ML20198H3911998-07-14014 July 1998 Non-proprietary Rev 5 to HI-961586, Thermal-Hydraulic Analysis of Waterford-3 Spent Fuel Pool ML20236N4181998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Waterford,Unit 3 ML20248E7781998-06-0101 June 1998 Annual Rept on Abb CE ECCS Performance Evaluation Models ML20249A4711998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Waterford 3 Ses ML20196A4051998-05-31031 May 1998 Rept of Facility Changes,Tests & Experiments,Per 10CFR50.59 for 970601-980531. with ML20198H4681998-05-20020 May 1998 Non-proprietary Rev 1 to HI-981942, Independent Review of Waterford Unit 3 Spent Fuel Pool Cfd Model ML20247A3891998-05-0101 May 1998 SG Eddy Current Examination (8th Refueling Outage) ML20247F6761998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Waterford,Unit 3.W/ ML20217M8951998-04-30030 April 1998 QA Program Manual ML20217P8281998-04-0707 April 1998 Safety Evaluation Accepting Relief Authorization for Alternative to Requirements of ASME Section Xi,Subarticle IWA-5250 Bolting Exam for Plants,Per 10CFR50.55a(a)(3)(i) ML20216B1751998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Waterford 3 Ses ML20217M1411998-03-0303 March 1998 Rev 2 of Waterford 3 Cycle 9 Colr 1999-09-30
[Table view] |
Text
- .- .. -
= ENTERGY %""s """ "*' '"*'
KW ind LA 70066 1e! 504 739 6774 R. F. Burski D<. ~ .
u m sea, 6., m3 W3F1-94-0097 !
A4.05 j PR July 14,-1994 U.S. Nuclear Regulatory Commission r ATTN: Document Control Desk Washington, D.C. 20555 I t
Subject:
Waterford 3 SES Docket No. 50-382 i License No. NPF-38 Monthly Operating Report Gentlemen:
Attached is the subject monthly report which covers the operating statistics !
for the month of June, 1994. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No.
NPF-38. .
t Very truly yours, tVi R.F. Burski Director Nuclear Safety '
i '
RFB/ssf Attachment cc: L.J. Callan, (NRC Region IV) ;
R.B. McGehee N.S. Reynolds [
F..Yost (Utility Data Institute, Inc.)
J.T. Wheelock (INP0 Records Center) ,
NRC Resident Inspectors Office (WADM526) l f
.9407150179 94o630 f a PDR ADOCK 05000392 i R PDR I
I i
i l
l NRC MONTHLY OPERATING REPORT
SUMMARY
OF OPERATIONS WATERFORD 3 JUNE 1994 The unit operated at an average reactor power of 94.5% and experienced one significant power reduction during the period.
a
, \
. l PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 During the month of June 1994, there were no pressurizer safety valve failures or challenges.
s i
l l
. l 1
OPERATING DATA REPORT l
. DOCKET NUMBER: 50-382 i UNIT NAME: WATERFORD 3 DATE OF REPORT: JULY,1994 i COMPLETED BY: T.S. BECKER '
TELEPHONE: 504-739-6683 OPERATING STATUS
- 1. Reporting Period: June,1994 :
Gross Hours in Reporting Period: _720
- 2. Currently Authorized Power Level (MWt): 3390 Maximum Dependable Capacity (Net MWe): 1075 Design Electrical Rating (Net MWe): 1104
- 3. Power Level to which Restricted (if any) (Net MWe): N/A ,
- 4. Reasons for Restriction (if any): N/A j THIS MONTH YR TO DATE CUMULATIVE
- 5. Number of Hours Reactor was Critical 720.0 3,205.8 64,305.8 Reactor Reserve Shutdown Hours '
- 6. 7. Hours Generator was On-line 708.8 3,139.1 63,427.3
- 8. Unit Reserve Shutdown Hours -0 !
- 9. Gross Thermal Energy Generated (MWH) 2,306,353 10,364,289 209,392,766
- 10. Gross Electrical Er:ergy l Generated (MWH) 753,140 3,393,490 69,814,270 i
- 11. Net Electrical Energy !
Generated (MWH) 717,446 3,226,038 66,536,483
- 12. Reactor Service Factor 100.0 73.8 83.7
- 13. Reactor Availability Factor 100.0 73.8 83.7 i
- 14. Unit Service Factor 98.4 72.3 82.5 l
- 15. Unit Availability Factor 98.4 72.3 82.5 l
- 16. Unit Capacity Factor (using MDC) 92.7 69.1 80.5 l 1
- 17. Unit Capacity Factor (Using DER) 90.3 67.3 78.4 !
1
- 18. Unit Forced Outage Rate 0.0 0.6 3,4 '
I i
OPERATING DATA REPORT DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: JULY,1994 COMPLETED BY: T.S. BECKER TELEPHONE: 504-739-6683 OPERATING DATA REPORT (Con't)
- 19. Shutdowns Scheduled over next 6 Months (type, date and duration of each):
N/A
- 20. If Shutdown at end of report period, estimated date of startup:
- 21. Unit in Commercial Operation THIS MONTH YR TO DATE CUMULATIVE
- 22. Hours in Reporting Period 720.0 4,343.0 76,848.0
- 23. Unit Forced Outage Hours 0.0 20.3 2,199.0
- 24. Nameplate Rating (Gross MWe): 1200
- 25. If Changes Occur in Capacity Ratings (Items Number 2 and 24) Since Last Report, Give Reasons: N/A l
)
, 1 AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: JULY,1994 COMPLETED BY: T.S. BECKER TELEPHONE: 504-739-6683 MONTH JUNE.1994 j DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL !
(MWe-NET) (MWe-NET) 1 1076 17 1067 2 1075 18 1068 3 1075 19 1068 4 1074 20 1066 5 1073 21 1065 6 1072 22 1063 7 1070 23 1065 8 1069 24 1065 9 1069 25 1066 10 1067 26 1064 11 1068 27 1064 12 463 28 1064 13 293 29 1064 14 541 30 1064 15 830 31 N/A 16 1065 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt. -
UNIT SHUTDOWNS AND POWER REDUCTIONS C^CKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: JULY,1994 l COMPLETED BY: T.S. BECKER TELEPHONE: 504-739-6683 REPORT FOR JUNE.1994 Type Method of Shutting ,
F = Forced Duration Down the Reactor or Cause, Comments and Number Date S = Scheduled (Hours) Reason (1) Reducina Power (2) Corrective Actions 94-03 940612 F 0.0 H 5 A Reactor Power Cutback was initiated due to a Turbine trip. The Turbine tripped on an invalid 2 out of 3 logic for MSR A2 High Level. The cause of the invalid High Level alarm was a failure to replace insulation on the sensing line for the MSR level switches. The reduced insulation in association with large amounts of rain caused the water level to rise in the float chamber which caused the level switches to actuate.
The sensing lines for the MSR level switches have been insulated.
(1) REASON (2) METHOD A= Equipment Failure (explain) 1= Manual B= Maintenance or Test 2= Manual Scram C= Refueling 3= Automatic Scram
,D= Regulatory Restriction 4= Continuation from Previous Period E= Operator Training and 5= Power Reduction License Examination 6= Other (explain)
F= Administrative G= Operational Error (explain)
H= Other (explain)
.-. - . . . . . - . - - .- - . . , . . - ._