-DUKE POWER GOMPANY P.O. box 33180 -
oHARLOTTE, N.o. 28242 HALB. TUCKER TELEPHONE vaca rammsmawr (704) 373-4531 frVOLaAR PRODOCTION May 20, 1983 Mr. Harold R. Denton, Director Office of' Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention:
Ms. E. G. Adensam, Chief Licensing Branch No. 4 Re: McGuire Nuclear Station Docket Nos. 50-369, 50-370
Dear Mr. Denton:
Duke Power Company has re-evaluated the control scheme for the McGuire Hydrogen Mitigation System. As a result, switches will be added to permit manual actuation of the system from the control room. These switches-will be added to both Units 1 and'2 during the first refueling shutdown of each unit. A revised description of the system will be put in the Final Safety Analysis Report.(Section 7.6.18) and the " Red Book" in the near future.
Please advise if there are questions regarding this matter.
Very truly yours, fS.
l<,jf Hal B. Tucker CAC/php cc:
Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II~
101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30303 Mr.
W.'T. Orders NRC Resident Inspector McGuire Nuclear Station r
~
8(/I0