Amends Response to NRC Re Violations Noted in IE Insp Rept 50-255/82-15.Corrective Actions:Surveillance Test MO-24 Changed from 1 Wk After Startup to Prior to Primary Coolant Temp of 325 F
ML20071G779
Person / Time
Site: Palisades Entergy icon.png
Issue date: 04/04/1983
From: Johnson B
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20071G772 List:
References
NUDOCS 8305240371
Download: ML20071G779 (3)


Text

-

i p

h' Consumers Power Company Geieral officos: 212 West Michigen Avenue, Jackson, MI 49201 *(517) 788-0550 April 4, 1983 James G Keppler, Administrator Region III US Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 DOCKET 50-255 - LICENSE DPR JALISADES PLANT - AMENDED RESPONSE TO IE INSPECTION REPORT 82-15 Consumers Power Company responded to an item of noncompliance contained in IE Inspection Report 82-15 by letter dated August 23, 1982. That response stated, under Corrective Action to Prevent Recurrence, that; "A new surveillance procedure will be written specifically for comparison of the auxiliary feed-water flow indication."

Upon further evaluation, it has been concluded that different corrective action could be taken which would also prevent recurrence. Therefore, Consumers Power Company is amending its response to IE Inspection Report 82-15 as follows:

CORRECTIVE ACTION TO PREVENT RECURRENCE The schedule for Technical Specifications Surveillance Test MO-24, given in Administrative Procedure 9.22, has been changed from one week after start-up to:

a) prior to a primary coolant temperature of 325* for the electric motor driven auxiliary feedwater pump, and b) prior to reactor criticality for the steam driven auxiliary pumps.

0305240371 830517 PDR ADOCK 05000255 G

PDR OC0383-0029A-NLO2 APR 6 1983'

JGKippler, Adrinistrator 2

Palisades Plant AMENDED RESPONSE TO IEIR 82-15 April 4, 1983 In addition, a back-up computer program has been changed to identify test M0-24 as a " prior to start-up" test.

This program will notify the appropriate personnel of the requirement to perform this test prior to every start-up.

. _. )

Brian D Johnson Staff Licensing Engineer CC Director, Office of Nuclear Reactor Regulation Director, Office of Inspection and Enforcement NRC Resident Inspector - Palisades i

4 OC0383-0029A-NLO2

e

~

s t

i Consumers Power Company Palisades Plant Docket 50-255 - License DPR-20 AMENDED RESPONSE TO IE INSPECTION REPORT 82-15 At the request of the Commission and pursuant to the Atomic Energy Act of 1954 and the Energy Reorganization Act of 1974, as amended, and the Commission's Rules and Regulations thereunder, Consumers Power Company i

submits our Amended Response to IE Inspection Report 82-15 dated August 23, 1982. Consumers Power Company's response is dated April 4, 1983.

4 CONSUMERS POWER COMPANY N

BY R B DeWitt, Vice President Nuclear Operations Sworn and subscribed to before me this 4th day of April 1983.

%d mt G

I Helen I Dempski, Notary Public Jackson County, Michigan My commission expires December 14, 1983.

OC0383-0029B-NLO2

.