ML20071G378
| ML20071G378 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 05/19/1983 |
| From: | Fay C WISCONSIN ELECTRIC POWER CO. |
| To: | Clark R, Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8305240131 | |
| Download: ML20071G378 (1) | |
Text
O l%sconsin Electnc eomcouem 231 W. MICHIGAN, P.O. BOX 2046. MILWAUKEE, WI 53201 May 19, 1983 Mr.
H.
R.
Denton, Director Office of Nuclear Reactor Regulation U.
S.
NUCLEAR REGULATORY COMMISSION Washington, D.
C.
20555 Attention:
Mr.
R.
A.
Clark, Chief Operating Reactors Branch 3 Gentlemen:
DOCKET NOS. 50-266 AND 50-301 PIPING AND INSTRUMENTATION DIAGRAMS POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Your letter dated April 27, 1983 requested two additional sets of selected full-size drawings so that you may continue your review of the Point Beach Units 1 and 2 IST program.
This request became necessary because P&ID's previously supplied in our June 4, 1980 C. W.
Fay to H.
R. Denton submittal were of reduced scale and did not provide sufficient detail to permit your review.
We are providing, under separate cover, two sets of the requested piping and instrumentation diagrams.
The P&ID's provided are the most up-to-date versions; we hope they meet your review needs.
If your review of the material indicates that you have additional questions, please do not hesitate to contact us.
Very truly yours, c/
/
g?cU/
Vice President-Nuclear Power C. W.
Fay Copy to NRC Resident Inspector
[ool 8305240131 830519 DR ADOCK 05000266 p