Washington Public Power Supply System (206) 482-4428g '/
p.,
Box 1223 Elma, Washington 98541 1: ?,
Docket No. 50-508
- gg,,,
March 2, 1983 G03-83-189 U. S. Nuclear Regulatory Commission, Region V Office of Inspection and Enforcement 1450 Maria Lane, Suite 260 Walnut Creek, California 94596-5368 Attention:
Mr. D. M. Sternberg, Chief Reactor Projects Branch No. 1
Subject:
NRC INSPECTION AT WNP-3 NONCOMPLIANCE 50-508/83-02/01 FAILURE TO FOLLOW PROCEDURES -
fiANDATORY HJLD POINT NOT OBSERVED
Reference:
- 4RC Letter, Docket fic. 50-503, Mr. D. M. Sternberg to Mr. R. S. Leddick, NRC Inspection at Washington Nuclear Project No. 3 (WNP-3), dated December 2, 1982.
The referenced letter reported the results of the NRC inspection conducted on January 17-21, 1983 at WNP-3. As a result of this inspection, the subject noncompliance was identified with a Supply System response due by March 5, 1983.
Ebasco has received the contractor's response to the subject noncom-pliance; however, additional information is required to assure satis-factory corrective action has been taken. Upon receipt and evaluation of the supplemental data, a complete report of corrective / preventive actions and date of full compliance will ne forwarded to your office.
It is anticipated that the report will be provided by April 4,1983.
Should you have any questions or desire further information, please contact me directly.
^
R. S. Leddick (760)
Program Director, WNP-3 DRC:nj j
^