Responds to IE Bulletin 82-04 Re Deficiencies in Primary Containment Electrical Penetration Assemblies.No Bunker-Ramo Electrical Penetrations Using Hard Epoxy Module Design Installed or Planned to Be Installed in safety-related Sys
ML20071D038
Person / Time
Site: Clinton Constellation icon.png
Issue date: 02/15/1983
From: Wuller G
ILLINOIS POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
REF-SSINS-6820 IEB-82-04, IEB-82-4, U-0603, U-603, NUDOCS 8303090125
Download: ML20071D038 (1)


Text

n11nois Power Company u-0603 T.ns R1(n1 15)T.

500 SOUTH 27TH STREET, P. O. BOX 511, DECATUR. ILLINOIS 62525-1805 Docket Number 50-461 February 15, 1983 Mr. James G. Keppler Regional Administrator, Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Reference:

IE Bulletin No. 82-04 dated December 3, 1982

Subject:

Clinton Power Station Unit 1

Dear Mr. Keppler:

This is in response to the referenced IE bulletin on the subject of deficiencies in primary containment electrical penetration assemblies.

No Bunker Ramo Company electrical penetrations which use the hard epoxy module design are installed or planned to be installed in safety-related systems at the Clinton Power Station.

I hereby affirm that the information in this letter is correct to the best of my knowledge.

Sincerely, G.

E. Wuller Supervisor-Licensing Nuclear Station Engineering GEU/j mm l

cc:

H. H. Livermore, NRC Resident Inspector H. Abelson, NRC Clinton Project Manager Director, Office of I & E, USNRC, Wash.

D.C.

Illinois Department of Nuclear Safety 8303090125 830215 Ik PDR ADOCK 05000461

/