n11nois Power Company u-0603 T.ns R1(n1 15)T.
500 SOUTH 27TH STREET, P. O. BOX 511, DECATUR. ILLINOIS 62525-1805 Docket Number 50-461 February 15, 1983 Mr. James G. Keppler Regional Administrator, Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137
Reference:
IE Bulletin No. 82-04 dated December 3, 1982
Subject:
Clinton Power Station Unit 1
Dear Mr. Keppler:
This is in response to the referenced IE bulletin on the subject of deficiencies in primary containment electrical penetration assemblies.
No Bunker Ramo Company electrical penetrations which use the hard epoxy module design are installed or planned to be installed in safety-related systems at the Clinton Power Station.
I hereby affirm that the information in this letter is correct to the best of my knowledge.
Sincerely, G.
E. Wuller Supervisor-Licensing Nuclear Station Engineering GEU/j mm l
cc:
H. H. Livermore, NRC Resident Inspector H. Abelson, NRC Clinton Project Manager Director, Office of I & E, USNRC, Wash.
D.C.
Illinois Department of Nuclear Safety 8303090125 830215 Ik PDR ADOCK 05000461
/