ML20071C697

From kanterella
Jump to navigation Jump to search
Responds to Action Item 5 of IE Bulletin 82-04, Deficiencies in Primary Containment Electrical Penetration Assemblies. No Bunker-Ramo Containment Electrical Penetration Using Hard Epoxy Module Design Installed
ML20071C697
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 03/03/1983
From: Haynes J
SOUTHERN CALIFORNIA EDISON CO.
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
REF-SSINS-6820 IEB-82-04, IEB-82-4, NUDOCS 8303070055
Download: ML20071C697 (1)


Text

Southern California Edison Company

$G P. O BOX 800 22 44 W ALNUT GROVE AVENU E ROSEMEAD. CALIFORNI A 91770

~~.. oY~~u"cI[."[o'n..no~,

March 3, 1983 U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596-5368 Attention: Mr. R. H. Engelken, Administrator

Subject:

Docket Nos. 50-361 and 50-362 San Onofre Nuclear Generating Station Units 2 and 3 As requested in IE Bulletin No. 82-04:

Deficiencies in Primary Containment Electrical Penetration Assemblies, this letter provides our response to Action Item No. 5 for San Onofre Units 2 and 3.

A review has been conducted, and we have determined that no Bunker Ramo containment electrical penetration which uses the hard epoxy mo'ifule design is installed or is planned to be installed in safety related systems at San Onofre Nuclear Generating Station, Units 2 and 3.

Subscribed on this 3

ay of M4to

, 1983.

Very truly yours, MC By J. G. Haynes' Manager of Nuclear Operations Subscribe and sw n to b fore me thisJ day of

, 1983 OFFle:AL SEAL DONA ftWY tilLCOMB 4f7 l

N ts t

W car.sma bz ue ls. ises Notary Public in 9fjd for the County of Los Angeles, SMte of California Enclosure cc:

Director, Office of Inspection and Enforcen ent, NRC A. E. Chaffee, USNRC Site Inspector, S023

{

8303070055 030303 PDRADOCK05000g G

-