ML20071C601

From kanterella
Jump to navigation Jump to search
Amend 29 to License NPF-2,modifying Tech Specs to Extend Fourth Refueling Outage Cold Shutdown from 30 H to 96 H, for One Time Only
ML20071C601
Person / Time
Site: Farley 
Issue date: 02/17/1983
From: Varga S
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20071C602 List:
References
NUDOCS 8303030199
Download: ML20071C601 (4)


Text

-

o UNITED STATES

~,,

8 NUCLEAR REGULATORY COMMISSION o

h WASHINGTON, D. C. 20655 f

ALABAMA POWER COMPANY DOCKET NO. 50-348 JOSEPH M. FARLEY NUCLEAR PLANT, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 29 License No. NPF-2 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Alabama Power Company (the licensee) dated January 14, 1983, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will opera',e in confo mity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable pssurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

I 8303030199 830217 DR ADOCK 05000

2-2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-2 is hereby amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 29,are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment was effective on* January 14, 1983.

F0kTHENUCftAlEGULATORY COMMISSION M

k teven A.

arga, Chi f Operating Reactors anch #1 Division of Licensi

Attachment:

Changes to the Technical Specifications Date of Issuance: February 17, 1983 W

G O

1

4 ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO. 29 TO FACILITY OPERATING LICENSE NO. NPF-2 DOCKET NO. 50-348 Revise Appendix A as follows:

Remove Page*

Insert Page*

3/4 6-1

'3/46-1

  • NOTE: After reaching cold shutdown conditions at the start of fourth refueling outage, the removed page 3/4 6-1 will be reinserted and this insert page 3/4 6-1 is cancelled.

t 4

/

O e

f O

e e

O

.f

~

3/4.6 CONTAINMENT SYSTEMS

~'

3/4.6.1 PRIMARY CONTAINMENT CONTAINMENT INTEGRITY LIMITING CONDITION FOR OPERATION s

3.6.1.1 Primary CONTAINMENT INTEGRITY shall be maintained.

' APPLICABILITY:

MODES 1, 2, 3 and 4.

ACTION:

Without primary CONTAINMENT INTEGRITY, restore CONTAINMENT INTEGRITY within one hour or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 96** hours.

l SURVEILLANCE REQUIREMENTS 4.6.1.1 Primary CONTAINMENT INTEGRITY shall be demonstrated:

a.

At least once per 31 days by verifying that all penetrations

  • not capable of being closed by OPERABLE containment automatic isolation valves and required to be closed during accident conditions are closed by valves, blind flanges, or deactivated automatic valves secured in their positions, except as provided in Table 3.6-1 of Specification 3.6.3.1.

b.

By verifying that each containment air lock is OPERABLE per Specification 3.6.1.3.

After each closing of each penetration subject to Type B testing, c.

if opened following a Type A or B test, by leak rate testing the seal with gas at P leakage rate for t8e(48 psig) and verifying that when the measured se seals is added to the. leakage rates deter-mined pursuant to Specification 4.6.1.2.d for all other Type B and C penetrations, the combined leakage rate is less than or equal to 0.60 L,.

~

"Except valves, blind flanges, deactivated automatic valves and the equipment hatch which are located inside the containment and are locked, sealed or otherwise secured in the closed position. These penetrations shall be verified closed during each COLD SHUTDOWN except that such verification need not be performed more often than once per 92 days. The blind flange on the fuel transfer canal flange shall be verified closed after each draining of the canal.

    • 0ne-time'only change during shutdown for the fourth refueling outage.

FARLEY-UNIT 1 3/4 6-1 AMENDMENT NO. JWI 29 1

--