ML20071C197
| ML20071C197 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 02/23/1983 |
| From: | Gucwa L GEORGIA POWER CO. |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737, TASK-1.A.2.1, TASK-2.B.4, TASK-TM GL-83-01, GL-83-1, NED-83-106, TAC-44166, TAC-44167, NUDOCS 8303010551 | |
| Download: ML20071C197 (2) | |
Text
Georn a Power Company 333 Piedmont Avenue
, Adanta George 30309 Telepncre 404 526 6506 t/aibog Address Post Oftce Oc. 454s ga Atanta Georg:a 30302 Georgia Power Power Generation Department NED-83-106 February 23, 1983 Mr. Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1, 2 NRC DOCKETS 50-424, 50-425 C0tGTRUCTION PERMITS CPPR-108,109 ALVIN W. V0GTLE NUCLEAR PLANT, UNITS 1, 2 OPERATOR LICENSING EXAMINATION SITE VISIT REQUIREMENTS _
TFfl0 UGH DECEMBER 1985 (GENERIC LETTER 83-01 DATED JANUARY ll, 1983)
Gentlemen:
In response to the subject letter, Georgia Power Company (GPC) requests NRC staff site visits to conduct operator licensing / instructor examinations through February 1986 on the following schedule:
Category of Examination:
(1) Initial (cold) license examinations for units applying for operating licenses.
(2) Initial license examinations to extend licenses to a second, identical unit after initial licensing.
l (3) Examinations to support certification of utility employees as l
Instructors.
l (4) Examinations to support certification of individuals who are not utility employees, but who are under contract to instruct licensed l
operators.
(5) Examinations for initial licensing of personnel at operating facilities or for upgrading a license from the Reactor Operator level to the Senior Operator level.
fDCb B303010551 830223 PDR ADOCK 05000321 V
w GeorgiaPower A Mr. Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation February 23, 1983 Page Two NUMBER OF EYAMINATIONS PROPOSED GPC BY CATEGORY DATE PLANT 1
2 3
4 5
5 SRO R0 02/28/83 Hatch 8
6 05/23/83 Hatch 4
5 2
07/25/83 Vogtle 5
5 09/26/83 Hatch 4
5 11 11/14/83 Vogtle 4
2 02/20/84 Hatch 2
2 8
3 04/16/84 Hatch 1
5 12 06/84 Hatch 1
2 3
17 07/84 Vogtle 4
2 09/84 Hatch 14 12/84 Vogtle 3
1 07/85 Hatch 1
2 8
07/85 Vogtle 3
1 12/85 Hatch 15 02/86 Vogtle 80 If the PflC is not able to support our requested schedule, please respond to this office as soon as possible.
l Very truly yours, j
[C
<!Q&
2 L. T. Gucwa Chief Nuclear Engineer i
GB/mb xc:
J. T. Beckham, Jr.
D. O. Foster H. C. Nix, Jr.
M. Manry J. P. O'Reilly (NRC-Region II) l Senior Resident Inspectors 700775