ML20071C197

From kanterella
Jump to navigation Jump to search

Submits Schedule for Site Visits to Conduct Operator Licensing/Instructor Exams Through Feb 1986,in Response to 830111 Generic Ltr 83-01
ML20071C197
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 02/23/1983
From: Gucwa L
GEORGIA POWER CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-1.A.2.1, TASK-2.B.4, TASK-TM GL-83-01, GL-83-1, NED-83-106, TAC-44166, TAC-44167, NUDOCS 8303010551
Download: ML20071C197 (2)


Text

Georn a Power Company 333 Piedmont Avenue

, Adanta George 30309 Telepncre 404 526 6506 t/aibog Address Post Oftce Oc. 454s ga Atanta Georg:a 30302 Georgia Power Power Generation Department NED-83-106 February 23, 1983 Mr. Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1, 2 NRC DOCKETS 50-424, 50-425 C0tGTRUCTION PERMITS CPPR-108,109 ALVIN W. V0GTLE NUCLEAR PLANT, UNITS 1, 2 OPERATOR LICENSING EXAMINATION SITE VISIT REQUIREMENTS _

TFfl0 UGH DECEMBER 1985 (GENERIC LETTER 83-01 DATED JANUARY ll, 1983)

Gentlemen:

In response to the subject letter, Georgia Power Company (GPC) requests NRC staff site visits to conduct operator licensing / instructor examinations through February 1986 on the following schedule:

Category of Examination:

(1) Initial (cold) license examinations for units applying for operating licenses.

(2) Initial license examinations to extend licenses to a second, identical unit after initial licensing.

l (3) Examinations to support certification of utility employees as l

Instructors.

l (4) Examinations to support certification of individuals who are not utility employees, but who are under contract to instruct licensed l

operators.

(5) Examinations for initial licensing of personnel at operating facilities or for upgrading a license from the Reactor Operator level to the Senior Operator level.

fDCb B303010551 830223 PDR ADOCK 05000321 V

PDR

w GeorgiaPower A Mr. Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation February 23, 1983 Page Two NUMBER OF EYAMINATIONS PROPOSED GPC BY CATEGORY DATE PLANT 1

2 3

4 5

5 SRO R0 02/28/83 Hatch 8

6 05/23/83 Hatch 4

5 2

07/25/83 Vogtle 5

5 09/26/83 Hatch 4

5 11 11/14/83 Vogtle 4

2 02/20/84 Hatch 2

2 8

3 04/16/84 Hatch 1

5 12 06/84 Hatch 1

2 3

17 07/84 Vogtle 4

2 09/84 Hatch 14 12/84 Vogtle 3

1 07/85 Hatch 1

2 8

07/85 Vogtle 3

1 12/85 Hatch 15 02/86 Vogtle 80 If the PflC is not able to support our requested schedule, please respond to this office as soon as possible.

l Very truly yours, j

[C

<!Q&

2 L. T. Gucwa Chief Nuclear Engineer i

GB/mb xc:

J. T. Beckham, Jr.

D. O. Foster H. C. Nix, Jr.

M. Manry J. P. O'Reilly (NRC-Region II) l Senior Resident Inspectors 700775