ML20071B160

From kanterella
Jump to navigation Jump to search

Requests That 830203 Application for Amend to License NPF-5,consisting of Changes to Tech Specs Re post-accident Monitoring Instrument List,Be Withdrawn from Consideration
ML20071B160
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 02/18/1983
From: Gucwa L
GEORGIA POWER CO.
To: Stolz J
Office of Nuclear Reactor Regulation
References
NED-83-107, NUDOCS 8302250432
Download: ML20071B160 (1)


Text

Georgia Power Company 3 33 Permord Avenuo Acanta. Georgta 30308 Tei. ahone 401526 EL2fi Yd'i;nQ Add 3 55 Pae: O'f.ce Bax 4545 m

AU,tva Getsgo 30302 Ccargia Power Power Generation Department February 18, 1983 Director of Nuclear Reactor Rcgulation Attention: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 Division of Licensing U. S. Nuclear Regulatory Commission Washington, n. C.

20555 NRC DOCKET 50-366 OPERATING LICENSE NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNIT 2 WITHDRAWAL OF TECHNICAL SPECIFICATION AMENDMENT PROPOSAL Gentlenen:

On February 3,1983 Georgia Power Company (GPC) submitted a letter and enclosures regarding " Request to Amend Technical Specification Post-Accident Monitoring Instrument List".

It is understood by GPC that evaluation of the proposed amendment has not yet commenced.

GPC hereby requests that that request be withdrawn from consideration at this time, and that the enclosed proposed changes to Unit 2 Technical Specification Section 3.3.6.4.a and Table 3.3.6.4-1 not be implemented.

Very truly yours, Wf W

L. T. Gucwa Chief Nuclear Engineer CBS/mb xc:

J. T. Beckham, Jr.

H. C. Nix, Jr.

f J. P. O'Reilly (NRC-Region II) 00 t Senior Resident Inspector j

8302250432 830218 PDR ADOCK 05000366 P

PDR