ML20071B883

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Lack of Insp of Small Bore Piping Bends.Initially Reported on 821013.Results of Insp Undergoing Engineering Evaluation.Final Rept Will Be Submitted 830318
ML20071B883
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 02/22/1983
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, L-83-87, NUDOCS 8303010261
Download: ML20071B883 (1)


Text

- _ _ _ _ _ _ -_____-_ -_______ - .______ -__-

P. O. BOX 14000, JUNO BEACH, FL 33408

  • , f FLORIDA POWER & LIGHT COMPANY 83 FEB 25 AfD. 34 February 22, 1983 L-83-87 Mr. James P. O'Reilly Regional /dministrator, Region II U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

Re: St. Lucie Unit 2 Docket No. 50-389, 10 CFR 50.55(e),82-019 Bent Small Bore Piping Not Inspected On October 13, 1982, Florida Power and Light notified the NRC of a potential 10 CFR 50.55(e) condition existing at St. Lucie Unit No. 2 site involving inspection of approximately 240 small bore (2 inches and under) piping bends. Florida Power and Light has completed the piping inspection, but the results are still undergoing Engineering evaluation.

Florida Power and Light will complete the Engineering evaluation and submit a final response by March 18, 1983.

Very truly yours, Robert E. Uhrig i Vice President

, Advanced Systems & Technology REU/RJS/ cab .

OFiqCIAL COPyd 8303010261 830222 gDRADOCK05000 Tg Q ME . . SERVING 9 LOPLE

. .- .. . .- _ _ - . . . - - - - - . - . - _ -