ML20071B080

From kanterella
Jump to navigation Jump to search
Forwards Change 1 of Overinsp Program,Incorporating Schedule Date Changes to Overinsp Milestone Event List. List of Effective Pages & Record of Corrections Encl
ML20071B080
Person / Time
Site: Clinton Constellation icon.png
Issue date: 02/15/1983
From: Hall D
ILLINOIS POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
0982-L, 982-L, NUDOCS 8302250326
Download: ML20071B080 (6)


Text

f t

s ILLIN0/8 POWER COMPANY 0982-L CLINTON POWER STATION. P.O. BOX 678, CLINTON, ILLINOIS 61727

. February 15, 1983 FP 3LST/tEj Docket.50-461 S- .g313Al-l ECS I 2/Pe. t s f

.;jn j i Mr. J. G..Keppler gg g{5 v~,- WM; Regional Administrator _ f i Nuclear Regulatory Commission . , p ~" i~-~]!!

Region III 799 Roosevelt Road

((Wgi, v((L;] db ~J~~:

i 2 Glen Ellyn, Illinois 60137 3L

! #iL

Reference:

Letter, D. P. Hall to J.'G. Keppler, 0982-L dated December 20, 1982

Subject:

Overinspection Program Plan, Change 1

Dear Mr. Keppler:

The referenced letter forwarded Revision 1 of the Overinspection Program.

Attached is Change 1 of the Overinspection Program which incorporates schedule date changes to the Overinspection

. Milestone , Event List.

Changes to the schedule are necessary because:

1) Development of a method for selecting samples to be inspected in accordance with MIL-STD 105D has been time consuming. Use of MIL-STD 105D in development of the Overinspection sampling plan is important since it is an industry wide recognized standard.

! 2) Development of inspection checklists was delayed l

by the effort needed to identify critical attributes of applicable codes, specifications and standards.

Joint meetings with Sargent & Lundy, Baldwin Associates and Illinois Power were necessary to complete this task.

t 1

( 8302250326 830215 l

gDRADOCK 05000461 PDR l-FEB 181983 l -rf;26' ,

J. G. Kcppler . February 15, 1983-Replace the List of Effective Pages, Record of Corrections.Page, and the Milestone Event List (attachment 4) with the attached pages. Check the list of effective pages for correctness and record the entry of change one on the Record of Corrections page.

If there are'any questions, contact Illinois. Power Company.

Si rel ours, Vice President RLB/prh attachments cc: US NRC Resident Inspector Manager-Quality Assurance Director-Office of I&E, Washington, DC Illinois Department of Nuclear Safety l

l

4 LIST OF EFFECTIVE PAGES

'The following pages and the'ir indicated changes and date of CN*

issue are included in the Illinois Power Co. Clinton Pcwer-Station j

Overinspection Program Plan.

Page No. ' Change No.' Date-i 11 1 2/4/83 111 1 2/4/83' 1 -

2 3

4 5

6

^

7 8

9 10 11 12 13 14 Attach. 1 Pg. l'- 14 Attach. 2 Pg. 1-2 Attach. 3 Page 1 of 1 Attach. 4 Page 1-2 1 2/4/83 11 Rev. 1 CH 1

RECORD OF CORRECTIONS Advance Change Entered C#-

Notice Date Affected Pages (Initials) Date 8

, Entered c g' Change Date Affected Pages (Initials) Date ,

1 2/4/83 Page 11 Page-iii Attach.4, Pg.1-2 iii Rev. 1 CH 1

Attachm:nt 4

. Rav 1 MILESTONE EVENT LIST Pega 1 of 2 MILESTONE: Dept: As of:

IPQA 2/4/83 OVERINSPECTION Resp: W. Connell RESP- SCHED EST CHG ACT Review previous audits & reports Budnick 11/15/82 =11/15/82 Submit OI plan to NRC Budnick 11/15/82 11/15/82 NRC concurrance of.OI' plan NRC: -----

12/3/82 Davalop checklist instructions Findley 12/15/82 2/1/83 2 2/1/83

& checklists Review Schopfer 1/14/83 2/15/83 1 Resolve comments Findley 1/18/83 2/21/83 1 Findley 2/21/83 1 Approve Schopfer 1/18/83 2/25/83 1 Bernard- 3/7/83 1 Connell 3/8/83 1 Prepare checklist instructions & Findley 1/21/83 3/8/83- 1 checklists for NRC review NRC review & concur with checklist NRC 1/24/83 3/9/83 - 1 eg instructions and checklists to 3/16/83 ,

Davalop document tracking program Findley 12/15/82 1/15/83 1 1/25/83 Budnick 11/24/82 12/10/82 1 12/8/82 Develop Overinspection review Budnick 12/3/82 11/30/82 procedure Review Overinspection Reports Budnick 1/4/83 12/27/82 issued prior to 10/6/82 Issue NCR's to BA .Budnick 1/7/83 1/6/83 Develop sampling plan Findley 12/15/82 2/25/83 2 Connell 12/17/82 12/30/82 2 1/27/83 Develop evaluation analysis Findley 12/15/82 2/9/83 2 program. Connell 12/17/82 2/21/83 2 Develop surveillance checklists Connell 1/31/83 i Develop inaccessible installation Findley 12/15/82 1/1/83 1 1/22/83 l p rocedure i

Develop NCR procedure Budnick 12/3/82 12/6/82 Develop Measuring & Test Budnick 12/10/82 12/6/82 Equipment procedure CH 1

Attachment'4'(Cont.)

. - Rev 1

, Pego 2.-of 2 RESP SCHED EST CHG ACT Dsvalop craft. support procedure. Findley- 12/15/82 2/25/83 2 Budnick 11/30/82 1 12/6/82 Davalop training & certification Findley 12/15/82 12/25/82 1 1/22/83.

procedure 'Budnick 12/24/82 12/10/82 1. 12/7/82 Dsvalop IP. interface procedure Findley ~12/15/82 1/8/83 1 1/17/83 Connell 1/21/83 2/25/83 1-

. Dsvalop feedback method Findley 2/1/83 2/9/83 2 Connell 2/10/83 2/15/83 2 c,,

I Conduct training & certification Findley.- 1/15/83 3/5/83- 2_

-Connell 12/17/82- 1/17/83 1 1/19/83 NRC review and concur with BA & IP Livermore 2/1/83 3/9/83 procedures to 3/16/83 1 Commence Phase II (Field Verifica- Findley 2/1/83 3/17/83,1 tion Inspectionaof Overinspection performed prior to 10/6/82).

Commence. Surveillance of BA Field Connell 2/10/83 3/17/83 1 Verification

^

Commence Phase II (Field Verifica- Findley 2/1/83 3/17/83 1 tion Inspection in accordance with approved sampling plan)

. Commence Phase III (IPQA-Over- 1ConnellL 3/15/83 4/15/83- 1

' inspection in accordance with' i

approved sampling plan)

Evaluate root causes Hall 5/1/83

, Evaluate and analyze Over- Connell 4/15/83 5/15/83 1 inspection results

~

CH 1 1