_ _..
- e. Enterg c"t rav on 'aiiaa* iac-Operations W. T, Cottle i
April 12, 1991 U.S. Nuclear Regulatory Commission Mail Station Pl-137 Washington, D.C.
205S5 Attention:
Document Control Desk i
Subject:
Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 Monthly Operating Report i
GNRO-91/00065 Gentlemen:
In accordance with the requirement of Technical Specification 6.9.1.10, is:
Entergy Operations is providing the Monthly Operating Report for Grand Gulf 1J.
Nuclear Station Unit 1 for March 1991 (attachment).
If you have any questions or require additional information, please contact this office.
Yours truly, co Y cam WTC/TKM/cg attachments: 1.
Operating Status 2.
Average Daily Power Level 3.
Unit Shutdowns and Power Reduction, cc:
(See next page) 9104160260 910331 ADOCK0500g6 F DR i
M00PMARC/SCMPFLR
[,
April 12, 1991 GNRO-91/00055 Page 2 of 3 cc:
Mr. D. C. Hintz 'w/a) s Mr. R. B. McGehee (w/a)
Mr. N. S. Reynolds (w/a)
Mr. H. L. Thomas (w/0)
Mr. J. L. Mathis (w/a)
Mr.StewartD.Ebneter(w/a)
Regional Administrator U.S. Nuclear Regulatory Comission Region 11 101 Marietta St., N.W., Suite 2900 Atlanto, Georgia 30323 Mr. L. L. Kintner, Project Manager tw/a)
Office of Nr lear Reactor Regulation U.S. Nuclear 'legulatory Comission Mail Stop 11021 Washington, D.C.
205S5 l
l MOOPMARC/SCMPFLR 1
- to GNRO-91/00065 DOCKET NO.
50-416 DATE 04/12/91 COMPLETED BY L, F. Daughtery
_ J.1)437-2334 TELEPHONE
(
i OPERATl_NG STATUS 1.
Unit Names GGNS UNIT 1 Notes:
~
2.
Reporting PirToT:
March 1991 3.
Licensed Thermal Power (MWT): 3833 MWT Nameplate Rating IT/E5 MWE DesignElectrical(GrossMWE): Rating (Net fiWe): 1250 MWE 4.
5.
6.
Maximum Dependable Capacity (Gross MWe): 1190 MW 7.
MaximumDependableCapacity(NetMWe): 1143 MWE 8.
If Changes Occur in Capacity Ratings (!tems NumTer 3"Through 7) Since Last Report.
Give Reasons:
New MDC test Performed on 01/17/91
~
(Net MWe): ~ N/A Power Level ~To Which Restricted, in Any /A 9.
- 10. Reasons For Restrictions, if Any:
N This Month Yr to Date Cumulative
- 11. Hours in Reporting Period 744 2160 56,482-
- 12. Number of Hours Reactor Was Critical 744 2T55-44,126 B
'~
- 13. Reactor Reserve Shutdown Hours 0
0 0
10 Hours Generator On-Line 744 2160 42,173.7
~
- 15. Unit ReserYe Shuidown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH)
DilG6F 8,182,038 T44 DULT69
- 17. Gross Electrical Energy Generated (MWH) 916,545~
2 666 4T2
~3, 29,586 a
- 18. Net Eiectrical Energy Generated (MWH) 881,7W~
2,F 43,707 461 u
- 19. Unit Service Factor 100.0 166
~~77.6
- 20. Unit Availability factor 100.0 1D O 77.6
- 21. Unit Capacity factor (Using MDC Net) 102 7 10 7 73.4
- 22. Unit Capacity Factor (Using DER Net) 94.T C o'~D 66.5
- 23. Unit Forced Outage Rate 0
0 5.9
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
~
- 25. If Shut Down At End of Report Period.
Estimated Date of Startup:
NA
~~~
- 26. Units In Test Status (Prict to Comercial Operation).
Forecast Achieved INITIAL CRITICAllTY 08/18/82 INITIAL ELECTRICITY T0/20/84 COMMERCIAL OPERAT10N
'67/6T783 M00PMARC/SCMPFlR
' to GNR0-91/00065 DOCKET N0.
50-416 UNIT DATE v4/12/91 COMPLETED BY L. F. Daughtery TELEPHONE 6_01-437-2334 MONTH March 1991 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY P3...R LEVEL (MWe-Net)
(MWe-Net) 1 1184.9 17 1189.0..
s 1170.6 18 1199.0 3
1204.0 19 1196.9 4
1205.2 20 1188.3 5
2.
.4 21 1174.6 6
1181.1 22 1169.8 7
1198.5 23 1168.5 8
1037.7 24 1188.1 9
1187.0 25 1183.2, 10 1206.7 26 1174.7 11 1200.3 27 1173.1 12 1188.I 28 1181.2 13 1194.0 29 1195.1 14 1208.2 30 1197.2 15 1207.2 31 1204.3 16 1194.6 l
M00PMARC/SCMPFLR
P A
l
- to GNRO-91/00065 UNIT SHUTDOWNS ANE! POWER REDUCTIONS DOCKET NO.
50-416 UNIT NAME 1
DflE 04/12/91 COMPLETED BY L. F. Dauchtery TELEPHONE 601-437-2334 REPOR MONTH March 1991 l
l l
l Method of l Licensee l
l l
Cause & eorrective l
l No. l Date l Type iDuration Reason l Shutting Downl Event
] System l Component l A-N- To l
xurrence l
l l
l j (1)
Hours (2) l Reactor l Report #
l Code l bde l
Preve n
l l
l l
(3) l l
(4)
I (5) l l
i l
I l
lNone l
l I
I I
I I
I I
I I
I I
I I
I i
I i
l i
i i
I i
I i
l I
l l
I I
I I
I I
I I
I I
I I
I I
1 I
I I
I I
I I
I I
I I
I I
I I
I i
l i
l I
I i
l I
I I
I i
i l
i I
I I
I I
I I
I I
I I
I I
i i
i i
I I
I i
l l
I I
I I
I i
l l
I I
I I
I i
1 l
l l
l l
l l
l l
l l
l 1
2 3
4 F: Forced Reason:
Methoo:
Exhibit G - Instructions i
S: Scheduled A-Equipment Failure 1-l.anual for Preparation of Data l
(Explain) 2-Manual Scram B;tnj 'ineets for Licensee 1
5-Maintenance or Test 3-Automatic Scram Event Report (LER)
C-Refueling 4-Continued File (NUREG-0161)
D-Regulatory Restriction 5-Reduced load E-Operator Training &
6-Other Licensing ixamination 5
F-Administratize Exhibit 1-Same Source G-Operational Erre.-
(Explain) i H-Ot.'er (Explain)
M00PMARC/SCMPFLR f