MONTHYEARML20212G1611999-09-22022 September 1999 Proposed Tech Specs,Requesting one-time Extension of Unit 2 Surveillance Interval for Snubber Functional Testing ML20212F6611999-09-20020 September 1999 Proposed Tech Specs,Revising Surveillance Std to Which Ventilation Charcoal Must Be Laboratory Tested as Recommended by GL 99-02 ML20210B8771999-07-15015 July 1999 Final,Typed TS (Pages for LARs 262 & 135,previously Submitted with Editorial Changes Identified by ML20210B8981999-07-15015 July 1999 Final Typed Pages for LARs 109 & 115,previously Submitted by 990615 & 28 Ltrs.Revised Pages Replace Those Previously Provided for LARs 109 & 115 ML20210B8401999-07-15015 July 1999 Proposed Tech Specs Revising Surveillance Frequency for Quench & Recirculation Spray Systems Nozzle Air Flow Test from 5 Years to 10 Years,Per Guidance Provided in GL 93-05 ML20209C1941999-06-28028 June 1999 Typed,Final TS Pages for LAR 115.Summary Description of Editorial Changes Incorporated in Addition to Those Addressed in Previously Provided marked-up Pages ML20196G3871999-06-22022 June 1999 Proposed Final Tech Spec Pages for LARs 259 & 131 ML20196F0191999-06-17017 June 1999 Proposed Tech Specs Pages for LARs 262 & 135 ML20196F6881999-06-17017 June 1999 Proposed Tech Specs Updating Heatup,Cooldown & Overpressure Protection Curves & Bases to Apply for Up to 15 EFPYs ML20195K1821999-06-15015 June 1999 Proposed Tech Specs Pages for LAR 109 Re RCS ML20207E1851999-05-27027 May 1999 Proposed Tech Specs,Revising Frequency Notation for Manual Functions Specified in ESFAS to More Clearly Denote Appropriate Refueling Frequency for Testing ML20207E2331999-05-27027 May 1999 Proposed Tech Specs 3/4.3.3.3,relocating Seismic Instrumentation Requirements to Licensing Requirements Manual Based on Guidance Provided in GL 95-10 ML20207E2081999-05-27027 May 1999 Proposed Revised Tech Specs for LARs 259 & 131,revising Qualifications for Operations Mgt & Incorporating Generic Position Titles ML20205H5121999-03-31031 March 1999 Proposed Tech Specs Changes to Index Page Xvii,Changing Wording of Title for Table 3.7-1.Table 3.7-2 Will Be Changed to Be Consistent with Title of Table 3.7-3 ML20211N6651999-03-25025 March 1999 Issue 3,rev 3 to Bvps,Unit 1 Inservice Testing (IST) Program for Pumps & Valves ML20204E4381999-03-16016 March 1999 Proposed Tech Specs Bases Section 3/4.7.13,adding Wording Which Discusses Design Bases of Sys in Greater Depth ML20204E3851999-03-16016 March 1999 Proposed Tech Specs LCO 3.7.1.3,increasing Min Vol in Primary Plant DW to 127,500 Gallons,Adding New Footnote & Revising Wording Contained Action Statements ML20207K1331999-03-0303 March 1999 Proposed Tech Specs Changing Qualifications for Operations Mgt & Incorporating Generic Titles to Eliminate Need to Develop Amend Request When Corresponding plant-specific Titles Are Changed ML20207E6261999-02-26026 February 1999 Proposed Typed,Final Tech Specs Pages for LAR 111 ML20199G5431999-01-18018 January 1999 Proposed Tech Specs Re Limiting Safety Sys Settings 2.2.1 & Associated Table 2.2-1 ML20198F9661998-12-24024 December 1998 Proposed Tech Specs Section 3/4.8.1, AC Sources, Clarifying EDG Fuel Oil Storage Requirements by Addition of Term Usable & Increasing EDG Largest Single Load Rejection Test Requirements ML20206N9541998-12-24024 December 1998 Proposed Tech Specs,Modifying Applicable Sections by Removing Rod Position Deviation Monitor,Rod Insertion Limit Monitor,Afd Monitor & QPTR Monitor ML20198D6711998-12-14014 December 1998 Proposed Typed,Final Tech Specs Pages for LARs 246 & 116, Consisting of Editorial Changes Due to Pagination,Changes Incorporated by Previous Amends & Corrected Typos ML20205F6961998-11-30030 November 1998 Revs to Offsite Dose Calculation Manual ML20211K6871998-11-30030 November 1998 Issue 2,Rev 1 to Inservice Testing (IST) Program for Pumps & Valves ML20155J0161998-11-0303 November 1998 Proposed Tech Specs Page 3/4 1-15,re Reactivity Control Sys ML20155B9681998-10-23023 October 1998 Proposed Final,Typed Tech Specs Bases Pages for LARs 260 & 133 Re Limiting Safety Sys Settings ML20154Q8021998-10-15015 October 1998 Proposed Tech Specs,Deleting Two License Requirements, Modifying One LCO Applicability,Modifying Three Definitions, Changing Action Statement Number & Deleting Meteorological Monitoring Spec ML20154Q4341998-10-15015 October 1998 Proposed Tech Specs,Adding Discussion That Explains Why Use of Time Constants,Expressed as Equality,Such as T = X Seconds,Are Acceptable ML20154D6381998-09-30030 September 1998 Proposed Tech Specs Re Revised Typed Bases for LAR 235 ML20154C6501998-09-24024 September 1998 Proposed Tech Specs Section 3.1.2.8,eliminating Potential for non-conservative Interpretation of Values of RWST & Bat Min Contained Volume & Eliminating Need for Plant Administrative Controls ML20197C5711998-09-0808 September 1998 Proposed Typed,Final TS Pages Re Surveillance Requirements for LAR 235 ML20154D5241998-08-14014 August 1998 Issue 2,Rev 0C to Inservice Testing (IST) Program for Pumps & Valves ML20202G9831998-07-22022 July 1998 Issue 3,rev 2 to BVPS Unit 1 IST Program for Pumps & Valves ML20236S4921998-07-15015 July 1998 Proposed Tech Specs 3/4 3 Re Reactor Trip Sys & ESF Sys Instrumentation ML20236S2881998-07-13013 July 1998 Proposed Tech Specs Revising BVPS-1 UFSAR Pages 9.7-7 & 8 & BVPS-2 UFSAR Pages 3.6-11 & 12 Re Potential Flooding of Intake Structure Pump Cubicles ML20236P8051998-07-0909 July 1998 Proposed Tech Specs Revising TS 3.7.1.1, Svs, Incorporating Improved STS Guidance of NUREG-1431 & Recommendations of W Nuclear Safety Advisory 94-01,dtd 940120 ML20236P7761998-07-0909 July 1998 Proposed Tech Specs 3/4 3-2,3/4 3-11 & B 3/4 3-1b,modifying Source Range Neutron Flux Requirements to Allow Use of Alternate Detectors ML20249C4531998-06-23023 June 1998 Final Tech Specs Pages for LARs 256/126 ML20249C3161998-06-19019 June 1998 Proposed Tech Specs Modifying Channel Calibr Definition to Exclude RTDs & Thermocouples from TS Channel Calibr Requirements ML20248M1901998-05-19019 May 1998 Proposed Rev 2F to Bvps,Unit 2 Inservice Testing (IST) Program for Pumps & Valves ML20247L3071998-05-14014 May 1998 Proposed Tech Specs,Final Pages for License Amend Requests 249/118 & 254/123,as Amends A-249,A-118,A-254 & A-123, Respectively ML20247J2851998-04-20020 April 1998 Alternative Request BV1-RV-AUG-1,Rev 1 for Reactor Vessel Lower Circumferential Weld (RC-R-1-C-8) ML20247J6761998-04-20020 April 1998 Alternative Request BV2-RV-AUG-1,Rev 1 for Reactor Vessel Lower Circumferential Weld (2RCS-REV21-C-4) ML20216J9771998-04-13013 April 1998 BVPS Unit 1,Cycle 13 Startup Physics Test Rept ML20248K3061998-03-20020 March 1998 Rev 1,Issue 3 to Inservice Testing Program for Pumps & Valves ML20237B9721998-03-19019 March 1998 Rev 1 to Procedure Npdap 2.14, Fitness-For-Duty for Duquesne Light Employees ML20216G7011998-03-17017 March 1998 Proposed Tech Specs,Revising Engineered Safety Feature Actuation Sys Instrumentation Table 3.3-3,action 34 & Associated Bases Section ML20216G1011998-03-16016 March 1998 Proposed Tech Specs Adding New LCO 3.0.6 to Section 3/4.0, Applicability ML20216G0801998-03-16016 March 1998 Proposed Tech Specs,Exempting Neutron Flux Detectors from Channel Calibr Requirements 1999-09-22
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20211N6651999-03-25025 March 1999 Issue 3,rev 3 to Bvps,Unit 1 Inservice Testing (IST) Program for Pumps & Valves ML20211K6871998-11-30030 November 1998 Issue 2,Rev 1 to Inservice Testing (IST) Program for Pumps & Valves ML20205F6961998-11-30030 November 1998 Revs to Offsite Dose Calculation Manual ML20154D5241998-08-14014 August 1998 Issue 2,Rev 0C to Inservice Testing (IST) Program for Pumps & Valves ML20202G9831998-07-22022 July 1998 Issue 3,rev 2 to BVPS Unit 1 IST Program for Pumps & Valves ML20248M1901998-05-19019 May 1998 Proposed Rev 2F to Bvps,Unit 2 Inservice Testing (IST) Program for Pumps & Valves ML20247J6761998-04-20020 April 1998 Alternative Request BV2-RV-AUG-1,Rev 1 for Reactor Vessel Lower Circumferential Weld (2RCS-REV21-C-4) ML20247J2851998-04-20020 April 1998 Alternative Request BV1-RV-AUG-1,Rev 1 for Reactor Vessel Lower Circumferential Weld (RC-R-1-C-8) ML20248K3061998-03-20020 March 1998 Rev 1,Issue 3 to Inservice Testing Program for Pumps & Valves ML20237B9721998-03-19019 March 1998 Rev 1 to Procedure Npdap 2.14, Fitness-For-Duty for Duquesne Light Employees ML20249A8671998-03-0606 March 1998 Rev 1H to BVPS Unit 1 IST Program for Pumps & Valves ML20217K0591997-12-31031 December 1997 Offsite Dose Calculation Manual for Units 1 & 2 ML20217G7261997-12-15015 December 1997 Relief Request 1-TYP-2-B5.40-1,Rev 0 to Pressurizer Nozzle to Safe End Welds ML20202B2511997-10-0303 October 1997 Pressure Testing Program for Third Ten-Yr Interval at Bvps,Unit 1 & Second Ten-Yr Interval at Bvps,Unit 2,Relief Request BV3-IWA-2,Rev 1, Re Class 1,2 & 3 Bolting Removal Due to Leakage ML20217B2941997-07-0202 July 1997 Rev 0 to 1TYPP-3, ISI Ten Year Plan for Third Interval at Beaver Valley Power Station Unit 1. W/22 Oversize Drawings ML20140C0151997-05-30030 May 1997 Issue 2,Rev 0 to 2nd Ten-Year Interval Update of BVPS-2 IST Program ML20196G3181997-04-17017 April 1997 Rev 16 to IST Program for Pumps & Valves ML20137T2201997-04-0909 April 1997 Rev 8 to 2OM-53C.4.2.6.4(ISS1A), SG Tube Leakage ML20137T2331997-04-0909 April 1997 Rev 8 to 1OM-53C.4.1.6.4(ISS3A), SG Tube Leakage ML20148A9501997-03-21021 March 1997 Rev 0,Issue 3 to IST Program for Pumps & Valves ML20137G4551997-03-12012 March 1997 Relief Request BV2-B3.110-2,Rev 0 to Pressurizer Nozzle-to-Vessel Welds ML20137G4221997-03-12012 March 1997 Relief Request BV1-B3.120-2,Rev 0 to Pressurizer Surge Nozzle Inner Radius Section (RC-TK-1-RADIUS-6) ML20137G4081997-03-12012 March 1997 Relief Request BV1-RV-WELDS,Rev 0 to Reactor Vessel Circumferential Welds (RC-R-1-C-1 & RC-R-1-C-8) ML20137G4351997-03-12012 March 1997 Relief Request BV1-B9.31-2,Rev 0 to Reactor Coolant Sys Branch Connection Welds ML20137G4651997-03-12012 March 1997 Relief Request BV3-IWA-1,Rev 0 to Insulation Removal for Class 1 & 2 Bolted Connections Located Inside Containment ML20137G4591997-03-12012 March 1997 Relief Request BV2-D2.20-1,Rev 0 to Svc Water Sys Welded Attachments ML20137G4791997-03-12012 March 1997 Relief Request BV3-IWA-2,Rev 0 to Class 1,2 & 3 Bolting Removal Due to Leakage ML20137G4441997-03-12012 March 1997 Relief Request BV2-B1.11-1,Rev 0 to Reactor Vessel Lower Circumferential Weld (2RCS-Rev21-C-4) ML20141D2021996-04-26026 April 1996 Rev 14 to Updated IST Program Issue 2 ML20101L7871995-10-11011 October 1995 Unit 2 Offsite Dose Calculation Manual ML20096D3811995-09-26026 September 1995 Issue 1,Rev 15 to Beaver Valley Unit 2 Inservice Testing Program for Pumps & Valves ML20093D6751995-09-19019 September 1995 Rev 0 to BVPS SSFI Technical Assessment Plan for Unit 1 - Safety Injection Sys ML20096D3301995-07-24024 July 1995 Issue 2,Rev 13 to Beaver Valley Unit 1 Inservice Testing Program for Pumps & Valves ML20095B5171995-07-0707 July 1995 Proposed Rev 2E to BVPS Unit 2 IST Program for Pumps & Valves ML20095B5091995-07-0707 July 1995 Proposed Rev 1G to BVPS Unit 1 IST Program for Pumps & Valves ML20085J6021995-04-28028 April 1995 Issue 1,Rev 14a to BVPS Unit 2 IST Program for Pumps & Valves ML20085L0211995-03-24024 March 1995 Rev 12A,Issue 2 to Duquesne Light Co Beaver Valley Power Station Unit 1 IST Program for Pumps & Valves ML20078G9671994-09-30030 September 1994 Rev 13,Issue 1 to Beaver Valley Power Station Unit 2,IST Program for Pump & Valves ML20072Q9281994-07-18018 July 1994 Proposed Rev 2D to BVPS Unit 2 IST Program for Pumps & Valves ML20072Q9191994-07-18018 July 1994 Proposed Rev 1F to BVPS Unit 1 IST Program for Pumps & Valves ML20065S3781994-03-25025 March 1994 Proposed Rev 2C to Beaver Valley Power Station Unit 2 IST Program for Pump & Valves ML20029D8541994-03-25025 March 1994 Proposed Rev 1E to BVPS Unit 1 IST Program for Pump & Valves. ML20063H2051993-11-19019 November 1993 Rev 11,Issue 2 to Inservice Testing (IST) Program for Pumps & Valves ML20067A3261993-11-18018 November 1993 Rev 12,Issue 1 to Beaver Valley Unit 2 IST Program for Pumps & Valves ML20058P8591993-10-20020 October 1993 Bvps,Units Odcm ML20058P9231993-09-14014 September 1993 IST Program for Pump & Valves, Issue 1,Rev 11 ML20045E2291993-06-17017 June 1993 Odcm. ML20045E1201993-03-25025 March 1993 Issue 2,Rev 9 to Bvps,Unit 1 IST Program for Pump & Valves. ML20045E1191993-01-29029 January 1993 Revised Proposed Rev 1D to Bvps,Unit 1 IST Program for Pump & Valves. ML20116B3271992-08-24024 August 1992 Issue 1,Rev 10 to Inservice Testing Program for Pump & Valves 1999-03-25
[Table view] |
Text
. ._ - - ._--
e e
DUQUESNE LIGHT COMPA"Y Beaver Valley Power Station Jf; SERVICE TESTIN0_FROGRAM FOR PL'MPS AND VAINES PROPOSED REVISION APPROVAL SHEET Unit 1 IST Progrum Proposed Unit Revision Operations OSC Approval Letter _Mnrager Review Review Number Pages Issued Initials /Date Date Signature Date nj 107,108,109,111, 1B 190,191,192. ( ,g 31191 BV OSC
-9 91 gh2/$ %,
/
3/7/91 /
T' tis " Proposed Revision" was made against Revision 6 of the present Jnit J _ 'ST Program, 9104120350 910405 R ADOCK 050003?4 PDR
[
Btf PS- 9 .61 Vr.tVE T[SY s ftG 0U11 I N[ .
SYSTEM NAME: R i ve r Wa te r_ SYST[M NUMBfA: _]Q, Va We Valve Category CSJ or Mark D raw ing D rawi ng Test Relier Number Class __
NSA OM No. C&o rd . Requirement Request Co m nt*
A B C D P oe DS X RM1278 8-2 QS b R "O - OST 1.30 2-FS" 1RW-57 3
_M 4 3 on_i, AD , T ti 4( 5Q1 . 3: o ( su QS OS! 1. 30. 3,6-I S,RD (Q) 1RW-58 3 X RM127B T-3 QS OST 1.30_3-FS _
nn w A oOSIs 1,30.
r i. s 2,6-F e - kS,RD s(.Of
_ FDCR1
( Q )
~
QS Or- P5 1RW-59 3 X RM1278 F -es QS N P. 9 'O OST 1.30.6-f5N, D 101 fW % 3 OS r 1. h fa - F5, P b L R 3 QS OST 1. Sc.2,3-f S.RD (Q) 1RW-95 3 X RM1278 5-1 QS OST 1. 3*s.2-FS 50 (Q) 1PW-96 3 X RM1278 F-2 QS OSs 3. 30. 3-I S, FD ( 0 )
1RW-97 3 X RM1278 F-3 QS OST f.30.6-FS,FD f4)
. _ _ _ ~ _
RV-IRW-101A 2 X RM127B O-1 SPT 1BVT 1.60.5 f**,
RV-IRW-1018 2 X RM1278 E-1 SPT 1BVT 1.60.5.( R )
RV-1RW-101C 2 X RM1278 F-1 SPT 1BVT 1.60.5- *}
v RV-1RW-1010 2 X RM1278 F-1 Sri IBVT 1.60.5-(R)
RV-1RW-102A 3 X RM127B B-3 SPT 1BVT 1.60.5-(R)
MOV-1RW-102A1 3 X S RM1278 F-2 QST OST 1.as7.3A-Stroke & T ifwe (Q) e40V-1 RW- 102A2 3 X 0 RMI27B F-2 QST OST 1. as 7. 3 A-St roke & T i me ( Q)
-107- 1SSUE 2 REVISION 6
( PoeSoSED REVisiMO 16 )
BVPS-1 tST VALVE TESTlNG OU1LfNE SYSitM MAMT: R i ve r Wa te r_ SYSfEM NUMBER: 30 j valve Valve Category CSJ or Mark Drawing Drawing Te .t Retier Number Class _
NSA OH No. Coord. Requirement Request Comments A B C D P RV-IRW-1028 3 X RM12TB B-3 SPT IBVT 1.60.5-(R)
MOV-1RW-10281 3 X S HM12TB F-3 l
QS1 1
OST 1.4T.3A-Stroke & Time (Q)
MOV-1RW-10282 3 X S RM12TB F-3 QST OST 1.47.3A-St roke & T ime (Q)
RV-1RW-102C 3 X RM1278 C-3 $PT 1 B*ii 1.60.5-(R)
MOV-1RW-102C1 3 X S RM1278 F-4 QST OST
- 1. 4 7. 3 A-St roke & T i me ( Q1 MOV-1RW-102C2 3 X S ftM12 78 f~ - 4 QSY OST 1. 4 7. 34-St roke & T ime ( Q)
MOV-1fM-103A 3 X S RM127A D-4 1 Z. R QST QQ L)Q OST 1. 30.f-St roke & Time (g)
HOV-1RW-1038 SL R 3 X 5 RM127A D-4 QST gy OST 1. 30.y-Stroke & Time (g)
MOV-1RW-103C 3 X S RH127A F-4 QST g yy OST 1. 30.[g, Stroke & Time ( )
MOV-1RW-103D X 11 R 3 S RM127A F-4 1. 30.f-St roke & T ime ig)
QST RQ%Q C31 MOV-1RW-104 3 X S RM127A E-8s QST OST 1.30.4-Stroke & Time (Q) r MOV-1RW-104A 2 X 0 RM127A D-3 QST OST 1.30.4-Stroke & Time (Q)
P3V-1RW-1048 2 X 0 RM127A E-3 QST OST 1.30.5-Stroke & Time (Q)
MOV-TRW-104C 2 X 0 RM127A E-3 QST OST 1.30.4-Strobe & Time (Q)
MCV-1RW-104D 2 X 0 RM127A F-3 QS1 OST 1.30.5-Stroke & ? ime (Q)
-108- ISSut 2 REVISIC:e 6 (PROPOSED RE\liSION 16)
__ ._ . _ _ _ _ . _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ___ _ _ . _ _ .._m ._ _ _ . -_ _ . _ - - - _ _ - - -
, 'I 4
.i '~
[
' BVPS.: 57 b
' i l
VALVE lES14MG 0:tTL8sst .
}
SYST!M MAME: River Wa.tel SYSTEM 88tmBIR: JQ,
~
i Vaive Valve Category CSJ or j Mark Drawing Drawing Test Retier 1- etumber Ctass MSA OM 900 Coord. Requirement A B C D P Restsest Comments r
4 MOV-IRW-105A 2 X O RM127A- D-1 QST OST 3. 30. 4-St robe & T ime ( Q) ;
a t i . t MOV-1RW-1058 2 X 0 RM12FA F-2 QST l OST 1.30.5-Strobe & Time (Q) c '
l MOV-1RW-105C 2 X O Rett 27A E-1 QST i OST 1.30.4-S* roke & Time (Q) t i - f MOV-1RW-1050 2 X O RM12TA F-1 QST i OST 1.30.5-Stroke & Time (Q) i j
f MOV-1RW-106A 3 X O IUt127A I D-5 QST OST 3.30.4-Stroke & Time (Q) :
?
RV-IRW-106A -3 X ftM17TA F-4 SPT
, 1BVT 1.60.5-(R) {
M(y;#-1RW- 106B 3 M O stM12 F A f E-5 QST UST 1.30.5-Stroke & T ime (Q) t I
RV-1RW-tC6B 3 i
,X RMt2TA C-4 SPT !
T~ 18VT 1.60.5-(R) t i
.- 2
}
- 'RW-106 3 X M9t t27A .' - 8 U N3 "
i ee PF l QS OST 1. 30.2.6-FSMD (Q)
R R 44 A DET 4. M. l . 4m - 5: 5. FO { ft )
l '
QS RR3i
- OSI 1.30.8-fS.RO (R)
TRW-10T 3 X F. Mil /A % QS bN b OST fi30.3.6-FS.FD (Q)
ER M 3 oi? t. Ma _ m - E S . 5:n ( R i 4
QS RR38 OSI 1.30.8-FS.RO ( R) D i
- tRW.106 3 x 8tM127A D-4 2. a 05 QRQ$ W OST 1.30.9,6-FS.FD (M sRW-to, x r-= 42. R 3 RMt2rA - QS g p sgg OST 1.30.L +-FS.FD (p3 ;
-io9- ISSut 2 j
REVIS80se 6 ;
- i. (PROPOSED RaisioN }B)
- j. .
4 f
4 t i
_ ~
, - - - y y , ._w .
-w . .. -.._q,_.. . _ _ _ n. :__ __.____< -___ . .
BVPS . est l
9 val ' f. 4 OUI 1_IMF .
SYSifM MAMi: R i ve r Waje r_ _A NUMBER: J O_
Vaive Valve Category CSJ or Mark Orawing Drawing test Relief Munbe r Cisss NSA OM Mo. Coord. Requirement Request Comments A B C D P MOV-1RW-116A 3 X S RM12TA F-8 QST OST 1.30.1A-Stroke & Time (Q)
MOV-iRW-1168 3 X 9 S RM127A 1
T-8 QST OST 1.:J.19-Stroke & Tim. (c)
MOV-1RW-117 3 X S RM127A D-5 MT "ST 1. 30.5-St roke & T ime ( c )
1RW-135 3 X RM12TA A-7 QS RR33 at8-stroke ver fled by piscing Control Room Redundant CooIing Coii into service.
1RW-136 3 X RM127A 8-9 QS RR33 Full-stroke verified by placing Controt Room Redundant Coo 8ing Cone into service.
I r .
1RW-158 3 l X RM1?FA C-6 QS OST 1. 30.14-f S, f D (Q) 1RW-159 3 X RM127A B-6 QS OST 1. 30.14-FS, F D (Q) 1RW-193 2 X RM12TA t ?. R D-3 QS RQ 95 OST 1.30.M-FS, FD (JP) l'L R 1RW-19ts 2 X RM1?TA E-3 CS KRS$ MT 1. 30.fA-T S,f D M 1RW-195 2 X RMi27A s2 a ;
, E-3 CS RQQ3 OST 1.30.M-FS.FD ( AT)
TRW-196 2 X RM127A e 2. R F-3 QS RR45- e r 2 30 u -rS.'s W Seepte VitusI inspection per QS RR34 CMP 1/2-75-WATER CHECR-1M (R) 051 1.30.2.3,6 & IBvi 1.30.2-1RW-19T 3 X RM127A D-1 QS PS, T D ( Q. R )
I --
-111- srSuE 7 R~,VIStost 6 (PROPOSED RE05tura 16)
l
. I l
i FNPS-1 ISf )
RELILT RD?UrSt - 43 Valve No. 1W-57 1W-106 1W-58 1W-107 1W-59 Category - C_ Class 3 runction: River Water punp dischargo ard dwnstronm header chock valves Test Requirementst Quarterly full-stroko Pasis for Relief: To fullfill their safety function t.hese chock valves must open to ensure a coolirg water flow path through the Recirculation Spray (RS) heat exchargurs durity a DIA. Plant operatiry experience has chcwn that exercisirg these valves quarterly by initiatiry River Water (W) flow through the RS heat exchargers unnocccsarily degrades the operational readiness of the heat exchargers by depositing asiatic clams, other mrino lifos rivc.r mud and silt in the heat exchargara.
To alleviate this problem, the plant interds to place the W side of the heat exchangers in a chendcal wet layup, once inplemented, the heat exchangers would then be mintained in layup during norm 1 plant operation ard chemically treated on a r>criodic basis to mintain their operational readiness in the event of an accident. If the program of chemically treating the heat exchargers is not successful, quarterly full-stroke testirg by initiatirg flew through the RS heat excharscra will be mintaincd.
l Alternata Test: Doperdirg on the availability of the Camponent Cooling Water (CER) heat exchangers, the check -valves will be either full-stroke or part-stroke exercised open quarterly by catablishirg a flow path through the W side of the CCR heat exchangers when testirg the W pumps per 1057-30.2, 3 & 6.
During refuelirg outages, the valves will be full-stroke exercised open by establishing a flow path through either the W side of the RS heat excwgers or the W side of the CCR heat exchargers ard passing required accident flow through the valves per lOSP-30.2, 3 or 6.
-190-(PPOPOSED REVISION 1B)
. _ . _ _ _ _ _ _ . _ _ . _ _ . . _ _ _ _ . _ . _ . _ _ _ . _ _ . _ . ~ . . _ . _ _ _ . . _ _ . . _ .
4 UVPS-1 IErr RillII RD2UESP 44 Valve No. IOV-11M-103A lOV-11M-103C IOV-1TM-103B IOV-11M-103D ,
l Catcgory B Class 3 i runction: River Water header isolation valves to the River Water side-of the Recirculation Spray heat exchangers '
Test Requirements: Quarterly stroke ard timo i
l Basis for Relief: These valves are normally closed durity power operation, 7b fullfill their safety function these valves receive a CIB ,
open signal to ensure a coolirg water flow path through the Ibcirculation Spray (RS) heat exchargers during a DIM.
Testirg these valves quarterly requires unisolating the River Water (IM) system frm the RS heat exchargers. Plant operatirg exTerience. has shown that this unnecessarily degrades the operational readiness of the heat exchangers by >
depositing asiatic clans, other marine life, river nud ard i
silt in the heat exchangers. To alleviate this problem,- the plant intends to place the IW side of thz heat exchangers in a chemical wet layup. Once implemented, the heat exchangers ,
would then be maintained in layup during normal plant c operation and ehemically- treated on= a periodic basis to
, maintain their operational readiness _ in the event of an accident. Because these valves will w within the layup boundaries, rollef frm quarterly valve stroke testing is required. If the program of chemically treating the heat exchargers is not su m naful, quarterly full-stroke testing will be maintained.
Alternate 7bst: Full-stroke exercised and timet open durirg refueling outages per 1050-30.12. ;
l
-191-(PROPOSED REVISION 1B) 1 .. _ . - . . . , , . - . _ _ . . . , . . . . _ _ . . , . , . . . _ , , . _ , , _ . _ _ . . _ _ _ . . , . . . --....m . _ _ - ~ ,__.-. ., _ . ..,__.._ . _.m .
BVPS-1 ISTr RELIEF IUQUFST 45 Valvo No. 1W-108 1W-193 1.W-109 1W-194 1W-195 1W-196 Category C Class .2. 3 j
Function: River Water supply chock valves to the Rccirculation Spray heat exchangers Test Requirerents: Quarterly full-stroke Basis for Relief: Theco check valv9s are normally closed during power operatio.1. Tb fullful *hoir safety function the valves must orc 1 to ensure a cooling water flow path through the Rocirculation Spray (RS) heat exchangers during a DBA. To test these valves quarterly River Water (W) flow must bo initiated through the RS heat exchangers. Plant operating experience has shown that this unnocessarily degrados the operational readiness of tho heat exdiangers by depositing asiatic cla.ns, other marine life, river mud and silt in the heat exchangers. 7b alleviate this problem, the plant intends to place the W sido of the heat exchangers in a chemical wet layup. Once implemented, the heat exthargers would then be maintained in layup during normal plant operation ard chemically treated on a periodic basin to maintain their operational readiness in the event of an accident. Because these valves will be within the layup boundaries, relief from querterly valve stroke testiry is required. If the program of chemically treating the heat exchargers is not successful, quarterly full-stroko testing will be maintained.
Alternate 7tst: Full-stroke exercised open during refuelirg outages by establishing a flow path through the W side of the RS heat
- exchargers and passing required accident flow through tho l valves per 10570-30.12.
-192-l (PROPOSED REVISION 1B) l
.--- _