ML20070T268

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EPIP-OSC-8 Re Medical Assistance & EPIP-TSC-1 Re Activation of Technical Support Ctr.Receipt Form Encl
ML20070T268
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 01/25/1983
From: William Jones
OMAHA PUBLIC POWER DISTRICT
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20070T264 List:
References
LIC-83-025, LIC-83-25, NUDOCS 8302080273
Download: ML20070T268 (2)


Text

_.-

?""

Omaha Public Power District 1w23 HARNEY a OMAHA. NEBRASMA 68102 1

TELEPHONE 536 4000 ARE A CODE 402 January 25, 1983 LIC-83-025 Mr. J. T. Collins, Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011

Reference:

Docket No. 50-285

Dear Mr. Collins:

Pursuant to 10 CFR 50, Appendix E, Section IV, Paragraph V, thirteen (13) copies of changes to the Fort Calhoun Station Emergency Plan Imple-menting Procedures are being provided to the Comission. Three (3) copies (for control copy numbers 154, 155, and 156) are provided for your office. Ten (10) copies (for control copy numbers 157 through 166) have been provided to the Office of Nuclear Reactor Regulation.

Please note that copy numbers 165 and 166 were sent addressee only to Mr. Rohrer and Mr. Tourigny, respectively. A transmittal sheet is provided for each copy to confirm receipt of the serialized document.

It is requested that these sheets be completed and returned within five (5) days of receipt.

Sinc rely, f/. W I

W. C. Jones Division Manager Production Operations WCJ/TLP:jm Enclosures cc: Mr. Harold R. Denton, Director (10)

U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation 60 Washington, D.C.

20555 LeBoeuf, Lamb Leiby & MacRae 1333 New Hampshire Avenue, N.W.

Washington, D.C.

20036 py i

8302000273 830202 DR ADOCK 0500

OMAHA PUBLIC POWER DISTRICT CONFIRMATION OF TRANSMITTAL iMERGENCY PLAN IMPLEMENTING PROCEDURES (EPIP)

Name D.

26hrtSb11-January 24, 1983 ate Holds and maintains Copy No. /k[

The following procedures are provided for your use:

Reacve Insert Procedure No.

Page No.(s)

Procedure No.

Page No.(s)

Table of Contents i thru ix Table of Contents i thru ix (11-24-82)

(1-07-83)

EPIP-0SC-8 No Numbers EPIP-0SC-8 8-1 and 8-2 (R0 2-20-81)

(R1 11-10-82)

EPIP-E0F-14 14-1 thru 14-3 EPIP-EOF-14 14-1 thru 14-3 (R0 7-14-81)

(R1 11-10-82)

EPIP-EOF-15 15-1 thru 15-5 EPIP-E0F-15 15-1 thru 15-5 (R0 4-23-82)

(R111-10-82)

EPIP-TSC-1 1-1 and 1-2 EPIP-TSC-1 1-1 and 1-2 (R17-14-81)

(R2 11-10-82)

EPIP-TSC-4 4-1 EPIP-TSC-4 4-1 (R17-14-81)

(R211-9-82)

EPIP-TSC-6 6-1 EPIP-TSC-6 6-1 (R02-20-81)

(R1 11-10-82) b o W N s-s u Y Manager - Radiological Health

& Emergency Plannino I hereby acknowledge receipt of the above copy or numbered ages. The additional or revised pages havebeen included'in#my asYigneda'co y of pthe EPIP an'dror s~uper-I seded pages have been removed as required.

l Signed Date (Please sinn and return this fem within 5 days te the Administrative Services l

De;artrent, Attention: Jane.fiorfeld, Omaita Public Power Cistrict,1623 Harney Street, Omaha, ;tebraska 68102.)

Note:

If EPIP copies have been transferred to another person or address, please fill out the spaces below.

l l

Name of Holder Address Title / Department i

.