OPERATING DATA REPORT DOCKET NO. 50-333 DATE _ FEBRUARY 1983 COMPLETED BY J. COOK TELEPilONE _(315) 342-3840 OPERATING STATUS FITZPATRICK Notes

1. Unit Ns.ne:
2. Reporting Period:

830101 - 830131

3. Licensed Thermal Power (MWt):

2436 003

4. Nameplate Rating (Gross MWe):

832

5. Design Electrical Rating (Net MWe):

830

6. Maximum Dependable Capacity (Gross MWe).

810

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted,If Any (Net MWe):

NONE

10. Reasons For Restrictions,If Any:

This Month Yr.-to-Date Cumulatise 744 744 65881

11. Hours In Reporting Period 459.4 459.4 46715.1
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours 0

0 0

14. Hours Generator On-Line 434.0 434.0 45449.2
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 888960 888960

. _ _ 94412818

17. Gross Electrical Energy Generated (MWH) 296880 296880 32731660 287015 287015 31151400
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor 58.3%

58.3%

69.0%

20. Unit Availability Factor 58.3%

58.3%

69.0%

21. Unit Capacity Factor (Using MDC Net) 47.6%

47.6%

62.4%

22. Unit Capacity Factor (Using DER Net) 47.0%

47.0%

57.6%

23. Unit Forced Outage Rate 41.7%

41.7%

16.1%

24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):

i

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIA L CRITICALITY j

INITIA L ELECTRICITY COMMERCIAL OPER ATION l

8302080242 830203 PDR ADOCK 05000333 R

pop s

AVER ACE DAILY' UNIT POWER LEVEL DOCKET NO. 50-333 UNIT FITZPATRICL DATE EEBRUARY_t983 J. COOK CO. fPLETED BY

\\

TELEPHONE (315) 342-384_0 JANUARY 1983 MONni DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL ptWe-Net)

(MWe Net) 366 I

79_4_

17 793 18 0

2 794 19 0

3 4

794 20 0

0 791 21 0

6 792 22 0

556 23 7

131 308 24 8

484 25 9

0 655 10 0

26 672 0

27 11 570 0

28 12 691 0

29 13 636 0

30 la i

630 15 L47 31 563 16 l

SUMMARY

The FitzPatrick plant operated at near full thermal power during this reporting period with one power reduction for rod sequence exchange, one outage due to opening of the 345 KV breaker and one outage due to instrument malfunc-tion.

I L

UNIT S!!UTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-333 UNIT N AME F 1 TZPATRI CK DATE FEBRUARY 1983 REPORT MONTil JANUARY 1983 COMPLETED BY

_J. COOK TELEPl!ONE -(315) 342-3840 r.

i ui 5 3

~

c ei N...

Date E.

5_E 5

? $ cc

!'.g gg cause & corrective 3

vent sa n:

gg Action to p

.3 3 Di Report a u) V Prevent Recurrence

.2O cc g

Q 1

830107-S 0

H 4

N/A N/A N/A Reduced power for rod sequence exchange and scram time testing 2

830109 F

144.4 A

3 N/A EA CKT BRK Unit trip due to 345 KV breaker opening 3

830117 F

165.6 A

3 N/A ID INSTRU Malfunction of reactor vessel level indicator during level checks 1

i 1

2 3

4 F: Forced Reason:

Method:

Eithibit G. Inst ructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2 Manual Scram.

Entry Sheels for Licensee C. Refueling 3 Automatic Scram.

Event Report (LEll) File INUltEG.

D Regulatory Restriction 4-Ot her (Explain) 0161)-

E-Operator Training & License Examination F Administrative 5

G Operatiuna! Error (Explain)

Exhibit 1 Same Source ll Other I Explain)

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE JANUARY, 1983 The unit operated at near full thermal power for the first six days of the reporting perio.. On 830107 power was reduced for rod sequence exchange and scram time testing. On 830109 the unit tripped due to opening of the 345 KV breaker.

The unit returned to service on 830115 On 830117 the unit tripped due to instrument malfunction while performing reactor vessel level checks.

At the end of the reporting period the unit is operating at approximately 630 MWe.

I

JAMES A. FITZPATRICK NUCLEAR POWER PLANT JANUARY 1983 SAFETY RELATEb ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

DATE SYSTEM WORK REQUEST #

CO M ENT g HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME REPAIR HOURS 1/14/83 03 17941 OPS None Provided temporary power to directional HCU-22-31 control valves attempting to move CRD 5

22-31.

1/18/83 03 19817 OPS lli Valve packing leak Replaced lli valve, repacked, returned HCU-42-07 to stores.

4 1/21/83 03 17770 OPS Rod would not couple Replaced CRD.

35 CRO-18-27 1/22/83 03

, CRD-26-23 16275 OPS Uncoupled during scram Replaced CRD.

30 1/22/83 03 17771 OPS Would not withdraw Replaced CRD.

50 CRD-22-31 l1/22/83 03 16273 Observation improper previous mainte-Disassembled, inspected, replaced parts CRD S/NS during mainte-nance as necessary, leak tested.

52 3038,3736 nance 2944,3055 1/22/83 03 19815 OPS Pltted inner plating of Replaced accumulator.

27 HCU-42-07 accumulator i

lI/23/83 03 16291 Observation improper previous mainte-Disassembled, inspected, dried.

6 CRD-3249 during maln-nance tenance 1/23/83 03 16289 Obse rva t ion Improper previous mainte-Disassembled, inspected, dried.

6 CRD-4726 du ri ng 'mai n-nance tenance 1/23/83 03 16290 Observation Improper previous mainte-Disassembled, inspected, dried.

6 CRO-3125 during main-nance tenance 1/24/83 03 16277 OPS Use in reactor stop pistor Disassembled, inspected, dried.

5 3197 S/N seals broken 1/24/83 03 16278 OPS Use in reactor stop pistor Disassembled, inspected, dried.

5 3054 S/N seals broken

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT January 1983 SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

DATE SYSTEM WORK REQUEST # HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE f1ECURRENCE TIME REPAIR f

HOURS t/24/83 03 16279 OPS Use in reactor inner filter Disassembled, inspected, dried.

5 3101 S/N not latched 1/26/83 03 16329 OPS Worn piston seal, pitting Disassembled, ins ggg was unsalvagable)pected, rebui l t, (I 4

1/27/83 03 20575 Breaker trippet E.C. Device out of adjus t-Adjusted trip device.

9 Breaker 11616 while starting ment Pump 1/9/83 01-125 17806 Tripped breakes Grounded component Removed grounded component.

6 B-SGBT Heater breaker 1/21/8; 02 16325 Visual Leaking flange gasket Replaced gasket.

90 SRV-71F 1/22/8, 02 16324 OPS Lifted at wrong pressure Replaced 1st stage cartridges.

40 SRV-71 JsK 1/23/8s 02 17436 Surveillance Broken primary cables Replaced primary cables.

6 Accoustic Monitors' for SRV-71 ALL 1/7/83 08 18086 OPS Faulty proximity & micro Replaced proximity & micro switch.

24 RefueIing swltch Bridge g1/19/8>

17 16357 incidental Lack of lubrication Replaced roots blower 4

Turbine Build Observation h

ing exhaust i

Rad Monitor

)1/19/8s 27 18061 incidental Bad bearings Replace motor bearings.

8 1

P-llB Observation

  • L I/8/83 29

_18024 Testing 90% switch broken while Replaced 90% swltch.

12 A0V-86B adjusting

~

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT JANUARY 1983 SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

s WOflK REQUEST #

REPAIR DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME PONENT #

HOURS 1/13/83 29 17812 Testing 90% swit'ch broken while Replaced 90% switch 20 A0V-868 adjusting j

il/22/83 29 14956 N/A None Performed Mod Mi-82-80; replaced 90%

110 A0V-86A,B,C, switch.

Actuat ing rainps.

D

,l/10/82 29 16386 Ground Detector Grounded full open switch Replaced full open switch.

46 l

A0V-868

'l/11/8]

29 18031 Visual Worn packing Replaced upper section of packing.

16 l

A0V-86B 1/23/82 29 16293 Incidental Worn piston rings Replaced piston rings.

28 A0V-86C observation 1/17/82 29 19811 OPS Misadjusted open torque Adjusted bypass switch, performed pre-12 MOV-77 bypass switch ventive maintenance on limi torque oper-ation.

1/27/8]

34 20259 Visual Gasket leaks Temporary repair by injecting Furmanite 20 NRV-111B compound.

1/27/82 34 20258 Visual Gasket l eat,3 Temporary repair by injecting Furmanite 20 NRV-1I1A compound.

lI/11/8 71 18001 Surveillance Low water level Added water.

8 SB-2 1/11/8:

71 14897 N/A No failure Installed temporary power supply to 4

l IBC 354 nuclear instrument battery chargers.

1/20/8.

71 14820 N/A Performed preventive Replaced & adjusted trip device.

16 i

Breaker maintenance.

11616 1/20/8i 71 20573 N/A Performed preventive Adjusted trip devices.

6 l

Breaker maintenance 12620

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT JANUARY 1983 SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

L i

WORK REQUESTp REPAIR DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME PONENT #

Il0URS 1/22/8.

71 20574 Incidental Missing conduit hanger Replaced hanger f, repaired seal tight.

4 Conduit Observation ICX582EB il/I8/8 70 18088 OPS Hisadjusced actuation Readjusted actuator ar'm.

16 MOD-108A 1/13/8 93 18095 OPS Burned out lamp Replaced lamp.

1 ECP-B J

l O

u______

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE

SUMMARY

ISC FEBRUARY 1983 ACTION TAKEN REPAIR CAUSE OF RESULTS OF lDATE WORK REQUEST #

D D

TO PRECLUDE TIME SYSTEM COMPONENT #

MALFUNCTION MALFUNCTION RECURRENCE HOURS I

1/23 02 17437 JIC Defective Needs replacing Replaced and 14 Accelerometer performed IMP-2.6 SRV-71J 1/19 02 18009 OPS Verification of Verify which SRV Verified all SRV's 10 SRV's Points temp to point 1/21 02 19829 OPS Check response Check r sponse of Checked response 8

TE with ice TE-113G 1/19 02-3 18101 OPS Indicator sticking Reading down scal'e Calibrated 13 FT-63B 1/18 03 17824 JIC Need for verifica-Perform friction Performed test 20 CRD 18-27 tion test on rod 1/21 03 19820 OPS Out of calibration Low press alarm Performed IMP-3 5 4

seals in wrong 42-07 1/12 07 17803 OPS Defective connectort Spiking after Replaced detector 44 insertion

onnector IRM-G l

1/06 07 17863 OPS Dirty drive gears Black pen sticking : leaned gears and 3

al ibra ted l

PR-468 l

t/13 07 17883 JIC Defective Detector not Replaced detector 60 working correctly SRM-D 1/06 07 18071 OPS Jut of calibration 120% trip occurred Recalibrated 3

1 APRM-F at 117.5%

I 1/07 07 18097 OPS

'surned-out card Dutput to high Repaired card and 12 calibrated l

TIP MACH B l

9 sig,-

ll;

~,

.?=

l

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE

SUMMARY

l&C FEBRUARY 1983 WORK REQUEST #

@ ATE SYSTEM HOW DETECTED CAUSE OF RESULTS OF ACTION TAKEN REPAIR COMPONENT #

MALFUNCTION MALFUNCTION TO PRECLUDE TIME RECURRENCE HOURS 1/30 07 19965 OPS Defective dete tor Plotter is erratic Replace tip and 49 TIP MACH 2 on trace and adjusted 1/27 07 19966 OPS Out of adjustment No trace available Adjusted and ran 1

TIP # 4 trace 1/27 07 19967 OPS Verification of No trace available Adjusted and ran 1

NM-102D adjustment t race 1/23 07 20531 JIC Defective connector Replace / repair Replaced cable 10 LPRM-20-37 cable connector connector 1/13 10 18159 OPS Out of adjustment Not closing at the Reset timer i

K45A & B proper time 1/21 16 19831 OPS Loose connections Pressure reading Charged to 15 psig 8

X-1118 and cap low and tightened 1/28 17 19248 OPS Defective switch Monitor goes down Replaced switch 30 RIS-456A scale spuriously for HV Ind Lit 1/26 17 19982 JIC Defective power inop and downscale Repaired power 4

RM-50A supply supply and cal 1/11 2-3 19444 JIC Normal wear Test valve needs Replaced valve and 4.5 PS-52D replacing performed IMP-6-10 1/25 23 19977 JIC Dirty contacts on Out of calibration Cleaned and 10 LT-201B power supply calibrated 1/05 27 17884 JIC Looose connection Paper does not Repaired loose 6

R-102 on plug advance connection

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE

SUMMARY

ISC FEBRUARY 1983 WORK REQUEST #

DATE SYS TEM H

ETECTED CAUSE OF RESULTS OF ACTION TAKEN REPAIR COMPONENT #

MALFUNCTION MALFUNCTION TO PRECLUDE TIME RECURRENCE HOURS 1/25 27 940 OPS Computer Program Values on computer Reprogrammed 2, 5 out of spec computer 1/25 27 20534 JIC Bent pin on Torus level PT 1 Bent to original 10 R-102 connector doesn't respond shape and cal 1/14 29 17812 OPS Defective switch 90% does not pick Replaced switch &

20 A0V-86B up performed iSP-65-1 1/08 29 18024 OPS Defective switch 90% L.S. malfunc-Replaced switch 26 A0V-86B tion and adjusted 1/14 76 17776 OPS Defective trans-No alarms Replaced card 48 SDA mitter card 1/17 76 17937 OPS Loose connection in constant alarm Repaired loose 12

  1. 3 MUX AL on power supply connection 1/22 76 18013 OPS Defective parts Zone *25 in alarm Replaced parts 20 FPP ZON 25 no reset i

i s