ML20070S448

From kanterella
Jump to navigation Jump to search
Revised Figure 6.2-2 to Tech Specs Re Health Physics Organization
ML20070S448
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 01/28/1983
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20070S431 List:
References
NUDOCS 8302040399
Download: ML20070S448 (1)


Text

_ _ _ . -__

mmm Super .andent SLO' !

l . .

Asst. Superintendent SID* -

B2 l 88 i N Operationo Engineer (SID) i i i Clerical EngineerTechnical(SID) L wineer Maintenance Senior m '

Health gg " Security Ibree Engineer Reactor -ffaintenance Physicist Op

$US "-- Engineer I & C (and/or Rec'.ts)

Support H.P.-

~

- Engineer Health Physics - Custodial Applied H.P.-

- Engineer Chenistry " Stores Plant Chemist-1/S Shift Supt. (SID)+* ~ Engineers Physicist / chemist / engineer- s

~

1/S Shift Technical Advisor *e* *""

Tech. Assist /technicie.r .

{

1/S Shii r. Supr. (SID)** *

  • l +

1/S Control Op. Nuclear (ID) -

At least one of these slull be licensed. ~ -

~

1 **

2/S Asst. Cont. Op. Nuclear (ID) -

Only one of these need b be licensed g during a training and gialification

.1/S Plant Op. Period provided a second SIO is available on site.

1/S As t. Plant Op.

g I/S- Number of men per shift. All shift 1/SAux.'Op. Positions are marked.

IO - NRC Licensed Operator.

i SiO - NRC Licensed Senior Opentor f -

Responsible for onsite fire protection activities 1

      • - Not applicable with plad dn the shutdows or refcel ORGANIZATION IDR CONDUCT OF mode. PIANP OPERATIONS Figure 6.2-2 1

. . . . -___