ML20070S448
| ML20070S448 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 01/28/1983 |
| From: | PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | |
| Shared Package | |
| ML20070S431 | List: |
| References | |
| NUDOCS 8302040399 | |
| Download: ML20070S448 (1) | |
Text
_ _ _.
Super.andent SLO' !
mmm l
Asst. Superintendent SID*
B2 l
88 i
i i
i N
Operationo Engineer (SID)
Clerical EngineerTechnical(SID)
L wineer Maintenance Senior m
Health gg
" Security Ibree Engineer Reactor
-ffaintenance Physicist Op
$US
"-- Engineer I & C (and/or Rec'.ts)
Support H.P.-
- Engineer Health Physics
- Custodial Applied H.P.-
~
- Engineer Chenistry
" Stores Plant Chemist-1/S Shift Supt. (SID)+*
~ Engineers Physicist / chemist / engineer-s
~
1/S Shift Technical Advisor *e*
Tech. Assist /technicie.r
{
1/S Shii r. Supr. (SID)**
l 1/S Control Op. Nuclear (ID)
+
At least one of these slull be licensed.
~ -
~
1 2/S Asst. Cont. Op. Nuclear (ID)
Only one of these need b be licensed g
during a training and gialification
.1/S Plant Op.
Period provided a second SIO is available on site.
1/S As t. Plant Op.
g I/S-Number of men per shift. All shift 1/SAux.'Op.
Positions are marked.
IO - NRC Licensed Operator.
SiO - NRC Licensed Senior Opentor i
f Responsible for onsite fire protection activities 1
- - Not applicable with plad dn the shutdows or refcel ORGANIZATION IDR CONDUCT OF mode.
PIANP OPERATIONS Figure 6.2-2 1
-