e AVERAGE DAILY UNIT POWER LEVEL
~
DOCKET NO.
50-250 Turkey Point 3 m'IT DATE _Dec. 15, 1982 COMPLETED BY P. Pace 654 TELE 1110NE i
MONTH.Nevember,1932 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL IMWe Net)
~
-(MWe-Net )
~
g 696 699
,7 698 699 2
g 696' 3
19 4
695 698 20 5
700 700 6
704 586 22 707' 7
23
.r 659 8
24 700 9
'S
~
04 to 0
702 27 702 12 28 02 13 29 14 700 584 3g 701 IS 699 INSTRUCTIONS On this formai. list the aver. ige daily unit power leselin MWe-Net for each day in the reporting inonth. Compute to the nearest whole megawatt.
(9/77) 8301270354 821215 PDR ADOCK 05000250 R
pop
OPERATING DATA REPORT DOCKET FO. 50-250 DATE _ Dec. 13, 1982 COSIPLETCD BY
_P. Bace TELEPHONE -(305) 552-3654 OPERATING STATUS i Unit Name:
Turkey Point 3 Notes
- 2. Reporting Period: November. 1982 Unil' 3 operated at essential--
- 3. Licensed Thern.at Power (MWt):
2200 ly full power except for an
- 4. Nameplate Rating (Gross blWe):
760 outage to repair a steam line
- 5. Design Electrical Rating (Net alWe):
693
- 6. blaximum Dependable Capacity (Gross MWe):
680
- 7. Masimum Dependable Capacity (Net MWe):
646
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
- 9. Power Level To Which Restricted. If Any (Net MWe):
- 10. Reasons For Restrictions.If Any:
t This Month Yr.-ro.Date Cumulatise
- 11. Ifours In Reporting Period 720 8016 87561.6
- 12. Number Of flow Reactor Was Critical 556.8 duto.i oueio.o
- 13. Reactor Reserve Shutdown flour, 0
0 c44.4
- 14. Ilours Generator On Line 550.0 46/J.1 5o,704.i
- 15. Unit Reserve Shutdown flours 0
121.8
- 16. Gross Thermal Energy Generated (MWil) i on1,771 10.601.565 119,799,1-20
- 17. Cross Electrical Energy Generated (MWH) 398.080 3,432,550 38,126,19,
- 18. Net Electrical Energy Generated (MWil) 378,43T a, a*, *n ooru,u,uo
- 19. Unit Senice Factor 76.4 60.8 67.1
- 20. Unit Availability Factor 76.4 60.8 67.3
- 21. Unit Capacity Factor (Using MDC Net) 81.4 62.8 63.8
- 22. Unit Capacity Factor (Using DER Net) 75.8 58.6 39.?
- 23. Unit Forced Outs;e Rate 23.6 12.9 30
- 24. Shutdowns Scheduled Over Nest 6 Munths IType. Date.and Duration of Each t:
i
- 25. If Shnt Down At I:nd Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status lPrior tu lonunercial Operation):
Foreca <t Achiesed 3NIflAL CRIIICALITY INIIl \\ L ELECTRICITY
( OM\\lLRCIA L OPER ATION I'l/77 e.
_50-250 UNITSilUTDOWNS AND POWER REDUCTIONS DOCKETNO. Turkey Point 3 UNIT NAME DATE Dec. 15. 1982
~
REPORT MONTH November, 1982 COMPLETED BY P. Pace
~
TELEPl!ONE 005) 552.3o54 e.
% s5 E
e n
.2 ::
E
- >.5 X Licensee F,,
s%
Cause & Corrective N," -
U He
}.
55 j
.5 i $
Event 4: b 7 '?
5'?
Action to
$3 5
j15
. Report :
NC EO Pres'ent Recurrence C
15 021122 F
170.1 A
1 CC PIPEXX Unit was removed from m rvice to re-pair weld on steam line to main steam line flow transmitter. Unit was then returned to service.
- {
I I
2 3
4 F: Forced Reason:
Method:
Exhibit G. instruelloas S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2 M.inual Scram.
Entry Sheets foi Lkensee C Refueling 3 Aututaatie Scram.
Event Report (LER) File (NUREG.
D Regulatory Res:riction g-Other(Explain) 0161)
E-Operator Training & License Examination F Administrative p
S G-Operational Error (Explain) s g., ao a.4 eve n.c/
Exhibit !.Same Souree 19/77) li Other(Explain) '
O
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-250 UNIT Turkey Point 3 DATE December 15, 1982 COMPLETED BY P. L. Pace TELEPHONE (305) 552-3654 REPORT MONTH November 1982 Unit 3 operated at essentially full power for the entire month except for an outage to repair a weld on a steam line to a flow transmitter. See the " Unit Shutdowns and Power Reduction" Report for details.
Maior safety related maintenance activities included:
Several boric acid heat tracing circuits were repaired.
A steam auxiliary feed pump supply valve was replaced.
A leaking spent fuel pool pump was repaired.
Troubleshooting'of a high pressure safety injection pump motor was conducted, but the ma,1 function could not be duplicated.
Inspections and rectuirements of IE Bulletins and NUREG-0737 are continuing.
Florida Power & Light Company commitments for NUREG-0737 implementation are continuing.
Refer to correspondence between FPL and NRC for addi-tional information.
NO l A.,]
-Rg 2:,2
o AVERAGE DAILY UNIT POhTR LEVEL f
50-251 DOCKET NO. -
UNIT Turkey Point 4 Dec. 15, 1982 DAll COMPLETED itY P. Pace (305) 552-3654' TELEPilONE November, 1982 MONTil DAY AVERAGE D I PO ER LEVEL.
DAY AVER AGE DAILY POWER LEVEL
-(MWe Net!
I7 2
g 3
4 20
~~
S
.y 3 6
yy 7
23 5
8 24 9
25 10 26 27 28 13 39 14 30
~~
IS 3y INSTRUCTIONS On this fonnai. list the aver. ige daily unit power leselin MWe-Net for each day in the reporting month. Compute to the nearest whole exgawa.
(9/77)
OPERATING DATA REPORT DOCKET NO.54-251 DATE De.:. 15. D82 COMPLETED BY P.
Pace TELEPHONE ' N R49-1654 OPERATING STATUS
- 1. Unit Name:
Turkey Point 4 Notes N
er 82
- 2. Reporting Period:
s
- 3. Licensed Yhermal Power (MWI):
2200 Steam Generator Repair
- 4. Nameplate Rating (Gross blWe):
760 Program in progresr.
- 5. Design Electrical Rating (Net MWe):
693 6 Maximum Dependable Capacity (Gross MWe):
680
- 7. Maximum Dependable Capacity (Net NWe):
646
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
- 9. Power Level To Which Restricted. If Any (Net MWe):
- 10. Reavens For Restrictions. lf Any:
j This Month Yr.-to.Date Cumularise
!I. Ilours in Reporting Period 720 8,016 81,289
~
- 12. Number Of flours Reactor Was Critical 0
5,876.2 59,855.3
- 13. Reactor Reserve Shutdown flours 0
o 166.6
- 14. IIcurs Generator On.Line O
5,811.6 57.896
- 15. Unit Reserve Shutdown flours 0'
O 31.2
- 16. Gross Thermal Energy Generated (MWil) 0 12.701.621.
121,918,244
- 17. Gross Electrical Energy Generated (MW}l) 0 4.053.505 38,775,572
- 18. Net Electrical Energy Generated (MWil)
-1192 3,845,920
_36,'734,698
- 19. Unit Se.vice Factor 0
72.5 71.2
- 20. Unit Availability Factor 0
77.5 71.3
- 21. Unit Capacity Factor (Using MDC Net!
0 74.3 70.0
- 22. Unit Capacity Factor (Using DER Net) 0 69.2 65.2
- 23. Unit Forced Outage Rate o
11.3 3.9
- 24. Shutdowns Schedoled Oser Next 6 Months IType. Date.and Duratirm of Each 3:
- 25. If Shut Down At I:nd Of Report Period. Estimated Date of Startup:
June 1983
- 26. Units in Test Statm IPrior ta Commercial Operatina):
Foreca<t Achi. ved INITIA L CRIIICA LITY INl fl\\L ELEC TRICITV
( Oil \\tERCIA L OPERATION (9/77I t
DOCKETNO. 50-251 UNITSl!UTDOWNS AND POWER REDUCTIONS UNITNAME Turkey Point 4 DATE #ec-15 198' COMPLETED BY P _ Pree REPORTMONTH November, 1982 TELEPitONE (305) 552-2654 I
e.
't a 5
~
e c.
3$
5
?5y IICC"5CC h3,
!N.,
Cause & Cortcetive
~
g.
9 #
yy gj y
J ~ cc Event 48 h M
M
, Action to
]O Prevent Recurrence g Di j
. Report :
in U c
E 6
18 821009 S
720 H
4 HB llTEXCH Steam Generator Repair Program in accordance with Paragraph III.H. of the Unit 4 Facility Operating License DPR 41.
- f I
2 3
4 F: Forced Reason:
Method:
Exhibit C. Instructions S: Scheduled A Equipment Failure (Explain) t Manual for Preparation of Data 11 Maintenance or Test 2 Manual Scram.
Entry Slicers for Licensee C Refueling 3 Automatie Scram.
Event Report (LER) File (NUREG.
~
D. Regulatory Restriction C}-Other tExplain) 01611 E. Operator Training & License Examination F. Administrative Y~ C * *""##
5 G Operational Error (Explain)
.y. / o aa a.4cw.n.c/
Exhibit I Same Souree 19/77 )
!! OtheriExplain)
- J
SUMMARY
OF OPyRA,?ING EXPERIENCE DOCKET NO.
50-251 UNIT Turkey Point '4 DATE Dec. 15, 1982 COMPLETED BY P. L. Pace TELEPHONE (305) 552-3654 REPORT MONTH November 1982 Unit 4 continued the Steam Generator Repair Program.
Other' major safety related maintenance activities included:
Several boric acid heat tracing circuits were repaired.
A leaking Iligh Pressure Safety Injection pump was repaired.
A leaking manually oper.sted boric acid supply valve was replaced.
Inspections and requirements of IE Bulletins and NUREG-0737 are con.
tinuina.
Florida Power &. Light Company commitments for NUREG-0737 implemehta '
tion are continuing. Refer to correspondence between FPL and NRC for additional information.
d 44
AVERAGE DAtLY UNIT POWER LEVEL 30~335 DOCKETNO.
UNIT St. Lucie 1 Dec. 15, 1982 DA1E COMPLETED Gy '
P. Pace
'(305) 552-365'4 TELEPJIONE 1
November, 1982 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEYEL (MWe Net)
.(MWeM )
838 834 I
I.,
2 836 838 18 3
835 837' 19 833 839 4
20 837 842 5
839 839 6
22 841 82p 7
23 840 836 g
g 9
841 837 25 842 489 10 26 II 843 340 27 841 834 12 28 839 831 13 29 444 830 14 30 546 15 3I 799 16 INSTRUCTIONS On this format. fist the average daily unit power leselin MWe Net for each day in the reporting month. Compute to the nea:est whole megawait.
(9/77) a.
=
o OPERATING DATA REPORT DOCKET NO.
50-335 DATE Dec. 15, 1982 COMPLETED BY P. Pace TELEPIIONE OFERATING STATUS
- 1. Unit Name:
St. Lucie 1 Notes
- 2. Reporting Period:
Fovember 1982 Unit 1 operated at essentiall5
- 3. Lteensed Thermal Power (MWt):
')700 full Power except for brief
- 4. Nameplate Ra:Ing (Gross MWe):
"O
- 5. Design Electrical Rating (Net MWe):
830 outages. See " Unit Shutdowns
- 6. Maximum Dependable Capacity (Gross MWe):
862 and Power Reductions" Report.
- 7. Maximum Dependable Capacity (Net MWe):
817
- 8. If Changes Occer in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
- 9. Power Level To Which Restricted.If Any (Net MWe):
- 10. Reawns For Restrictions. lf Any:
i This Month Yr to Date Cumulatise
- 11. Ilours in Reporting Period 720 8,016 52,104
- 11. Nunstr Of flours Reactor Was Critical 698.2 7,528.2 42,357A
- 13. Reactor Reserve Shutdown !!ours 0
0 205.3
- 14. Ilours Generator On-Line 691.8 7,471.8 41,4g4,7
- 15. Unit Reserve Shutdown ll,ours o
0 39.3
- 16. Gross Thermal Energy Generated (MWil) 1,816,532*
_19,854,742
_103,178,661
- 17. Gross Electrical Energy Generated (MWH) 596.510__,,,,
_ 6,512,630
_ 33,570,745 lb. Net Eiectiical Energy Generated (MWil) 565,107 6,174,492 31',654,039
- 19. Unit Service Factor 96.1 93.2 79.6
- 20. Unit Availability Factor 96.1 93.2 79.7
- 21. Unit Capacity Factor (Using MDC Net) 96.1 95.6 77.7
- 22. Unit Capacity Factor (Usin; l'ER Net) 94.6 93.6 75.4
- 23. Unit Forced Outage Kate 3.9 l1 4.8
- 24. Shutdow ns Scheduled Os er Next 6 Months IType.Date.and Duration of Eacht:
I Refueling, March 1982, 2 months
- 25. If Shut Down At I:nd Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status Irrior io Commercial Operationi:
Forecast Achiesed INillA L Cill flCAli fi INIIl \\L ELECTRICITY
( O\\l\\lLRCIA L OPEit ATION 3630x10s BTU diverted to St. Lucie Unit 2 for testing.
lu/7h e
1 UNITSIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-335 i
UNITNAME st. Lucie 1 DATE Dec. 15, 1982 November 1982 COMPLETED BY P.
Pace REPORT MONTH TELEPl!ONE (305) 552-3654 P
m.,
.! ?
".k
.Y Licensee 5 t, h%
Cause & Currective No.
D.H e
- i 5?
4
.5 i e Event 4: b 37 E?
Action to
$3
$ di j
. Report :
NG E
Prey'ent Recurrence U
Q 07 821114 F
8.2 G
3 335-82-57 SF Valvex Unit tripped on low S/G pressure following unintentional emergency boration. Unit returned to service.
08 82114 F
2.9 H
3 CH Valvex Unit tripped during Power increase following above event due to loy S/G level. Unit returned to service.
09 821126 F
17.2 G
3 335-82-62 IA Instru Unit tripped during testing of safe-guards instrumentation cabinet due to mispositioned switch. The unit was returned to service.
- J" 1
4 F: Forced Reason:
Methcd:
Exhibit G -Instructions S: Scheduled A Equipment Failure (Explain)
- 1. Manual for Preparation of Data B-Maintenance of Test 24!anual Scram.
Entry Sheets for Licensee C. Refueling
$0ther(Explain) 0161) 3 Automatie Scram.
Event Report (LER)IMe(NUREG.
D Regulatury Restriction E-Operator Training & License Examination F Administrative b
0**"'" " "
S G-Operational Error (Explain; c. /.o ao runw.r..c/
Exhibit ! Same Source t
(9/77)
Il Other(Explain) -
,,0
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-335
...s.
UNIT st. Lucie 1 DATE Dec. 15, 1982 COMPLETED BY P. L. Pace TELEPHONS (305) 552-3654 REPORT MONTH Novemigr 1982 Unit 1 operated at essentially full power for the entire month except for three brief outages.
Report for details.
See the " Unit Shutdowns and Power Reductions" Maior safety related maintenance activities included:
Repairs were made to an Auxiliary Feedwater control valve.
Inspections and requirements of IE Bulletins and Nureg-0737 are continuing.
Florida Power & Light Company commitments for NUREG-0737 implenenta-tion are continuing.
additional information, Refer to correspondence between FPL and NRC for a
'.Y e