ML20070R045

From kanterella
Jump to navigation Jump to search
Forwards Rev 6 to ISI-P-008, Inservice Test Program & Rev 3 to Georgia Power Co Inservice Test Program (ISI-P-016) for Vogtle Electric Generating Plant Unit 2
ML20070R045
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 03/25/1991
From: Mccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20070R047 List:
References
MSV-00467, MSV-467, NUDOCS 9104010053
Download: ML20070R045 (2)


Text

-

y 9 S Georg*a Power Compww 40 Ineness Centrar Pa4way Ptml C%ce Don !?95 Bam ngNm. Alabama OfC01 Tt u:phwe 205 B17-7122 m

C. K. McCoy Georgia Power t% !outwn t. wax sNrom March 25, 1991 MSV-00467

  1. 1544

$ Docket Nos 50-424 J 50 425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

V0GTLE ELECTRIC GENERATING PLANT 1RSERVICE TEST PROGRAM REVISIONS Please find the enclosed revisions to the Inservice Test (IST) Program for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. The IST Programs were previously submitted as documents ISI-P-008 and ISI-P-016 for VEGP-1 and 2, respectively. The enclose'l program changes represent revisions six and three for the Inservice Test rogram documents.

The enclosed revisions were reviewed against NRC Generic Lt: . 09-04,

" Guidance on Developing Acceptable Inservice Testing Prograns . dated April 3, 1989. It is our belief that the enclosed changes fall wi'.nin the provisions of NRC Gene " Letter 89-04 for program revirions not requiring prior NRC review and spr tal . A; such, we are submitting these revisions to mt ,tain the accuray of tnc VEGP-I and 2 IST program documents on file With ti. NRC. The enclosures contain a brief summary of the ilocument revisions.

It should be noted that we have takte credit fur a previously approved Cold Shutdown Justification in the case of the mair, feedwater regulating valve additions. Cold Shutdown Justi fii ation CS-40 for the regulating valves duplicates the previously approved Cold Shutdown Justification CS-20 for the main feedwater isolation valves and as such, prior NRC review and approval was not requested for this addition.

Additionally, Inservice Testing Program revisions submitted to the NRC by our latters MSV-00060 and MSV-00067 dated May 22, 1990 for VEGP-1 and 2, l respectively, contained Relief Request PR-5 for each unit. The subject relief request would allow the use of autoscaling digital vibration i]

i monitors for obtaining pump vibration measurtments. Since Relief Request PR-5 did not appear to fall within the provisions of NRC Generic Letter 89-04, prior NRC review and approval was considered necessary. However, recent NRC approval of ASME Cooe Case N472, as documented in Regulatory 9104010053 910325 'ef' PDR ADOCK 05000424 g T.

r.

O.

PDR AU[-l f1

. - _ - _ - - ~

V V. S. Nuclear Regulatory Commission MSV-00467 Page 2 Guide 1.147, Revish P., dated November 1990, allows the use of autoscaling digital vibrat;on itors. Accordingly, we are withdrawing the subject relief request and have included the necessary changes in the enclosed program revisions.

Should there be any questions in this regard, please contact this office. '

Sincerely, C. K. McCoy CKM/KLG/9b

Enclosures:

1. Revision 6 to VEGP-1 IST Program, ISI-P-008
2. Revision 3 to VEGP-2 IST Program, ISI-P-016 xc: Georoia Power Company Mr. S. H. Chesnut (w/o ancl.)

Mr. P. D. Rushton (w/u encl .)

Mr.W.B. Shipman (w/ encl.)

Mr. L. A. Ward (w/o encl.)

NORMS (w/ encl.)

V. S. Nuclear Reaulat ry Commission Mr. S. D. Ebneter, Regional Administrator 'w/ encl,)

Mr. D. S. Mood, Licensing Project Ma,.ager, eB (w/ encl.)

Mr. b. R. Bonser, Senior Resident Inspectc.*, Vogtle (w/ encl.)

6 0

.. GEORGIA POWER COMPANY INSERVICE TEST PROGRAM (ISI-P-008)

FOR VOGTLE ELECTRIC GENERATING PLANT UNIT I PREPARED BY SOUTHERN NUCLEAR OPERATING COMPANY INSPECTION AND TLaTING SERVICES GROUP O

S 4C GPC REV. DATE DESCRIPTION TD TD E*.f E E.' N-(n) (n) %f %f @, N:

. -- - ==" X.XXXXX

' ~ >' - -- XXXXXX

, u,- - - - -

XXXXXX

> "a* Tar X.XXXXX 4 -- - t%- XXXXXX

- u-- == XXXXXX O

Hn == W* %+ = % &

j

. _ _ _ _ _ _ _ _ _ - - - - _ _ _ . - -