p-a

.c n

OPERATING DATA REPORT 050-298 DOCKET NO.

DATE 12-2-82 COMPLEIED BY P. L. Ballinger TELEPHON'd 402-523-3s11 OPERATING STATUS '

Notes

l. Unit Name:

Cooper Nuclear Station November 1982

2. Reporting Period:

N

3. Licensed Thermal Power (MWt):

836

4. Nameplate Rating (Gross MWe):

778

5. Design Electrial Rating (Net MWe):

787

6. Maximum Dependable Capacity (Gross MWe):

764

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Whiali Restricted,1f Any (Net MWe):
10. Reasons For Restrictions.If Any:

'lliis Month Yr to.Date Cumulative 720.0 8,016.0 73,801.0

11. Hours In Reporting Period 720.0 6.740.5 60.626.9

- 12. Number Of Hours Reactor Was Critical 0.0 0,o

' O. o

'13. Reactor Reserve Shutdown Hours 720.0 6,670.5 59,628.0

14. Hours Generator On.Line
15. Unit Reserve Shutdown Hours 0.0 '

O.0 0.0-

16. ' Gross Thermal Energy Generated (MWH) 1,691,040.0 14,632,896.0 118,321,374.0
17. Gross Electrical Energy Generated (MWH) 569,794.0_,

4.866.949.0 37,347,736.0

18. Net Electrical Energy Generated (MWH) 551.437.0 4,710,332.0 36,007.710.0
19. Unit Service Factor 100.0 83.2 80.8
20. Unit' Availability Factor 100.0 83.2 80.8 l
21. Unit Capacity Factor (Using MDC Net) 100.2 76.9 63.9
22. Unit Capacity Factor (Using DER Net) 98.4 75.5 62.7
23. Unit Forced Outage Rate 0.0 3.0 3.9
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each t:

Refueline. May 1. 1983:~4 weeks

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achiesed INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION l.

8301270202 821202

~

PDR ADOCK 05000298 I"/771 R

PDR t

AVERAGE DAILY UNIT POWER LEVEL 050-298 DOCKET NO.

Cooper Nuclear Station WIT LATE December 2. 1982 e

COMPLETED BY P. L. Ballinger TELEl-iiONE 402-825-3811 MONTH November DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 764 770 1

g7 752 771 2

jg 3

754 19 773 4

766 20 773 5

765 731 21 773 6

766 22-7 719 772 23 776 772 8

24 777 772 9

25 777 10 26 773 13 775 772 27 772 12 g

768 13 771 772 29 769 14 30 772 l

l15 772 3,

l 16 772 1

INSTRUCTIONS On thi format. list the average daily unit power level in MWe Net for each day in 'he reporting month. Compute to the neare:t whole megawatt.

(9/77)

{

m 050-298 DOCKET NO.

UNIT SHUTDOWNS AND' POWER REDUCTIONS Cooper Nuclear Statioq UNIT N AME

-December 2, 1982-DATE COMPLETED BY.

P. L. Ballinger REPORT MONTil November TELEPHONE 402-825-3811

~h

=

s sc.

Cause & Currective ~

8."3 L

.2 _e E

,.s X Licensee g't.

Action to

. No.

Date g

3g 3

_g g 5 Event u7

$E 5

j i.i g Repor,e

,# G u

Prevent Recurrente 6

(NONI', DURING REPORTING PERIOD) l i

i 2

3 4

F: Forced Reason:

Method:

Exhibit G-Instructions 5: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data H. Maintenance of Test 2 Manual Scram.

Entry Sheets for 1icensee C-Refueling 3 Automatic Scram.

Event Report (LER) File (NilRI G.

D Regulatory Restriction 4 Other (Explain) 01611 E-Operator Training & License Examination 5

l F-Administrative Exhibit I - Same Source I

G-Operational Error (Explain) pf/77) ll Other (Explain)

m:--

9

~

r OPERATIONS NARRATIVE

~

Cooper Nuclear Station November 1982-The plant-operatedithe month of November with no shutdowns or power reductions.

~

A capacity factor of:98.4% was achieved throughout the month.-

~ _. -

F 1

i y

I+

i '

4 4

m