OPERATING DATA REPORT 050-298 DOCKET NO.
DATE 12-2-82 COMPLEIED BY P. L. Ballinger TELEPHON'd 402-523-3s11 OPERATING STATUS '
Notes
- l. Unit Name:
Cooper Nuclear Station November 1982
- 2. Reporting Period:
N
- 3. Licensed Thermal Power (MWt):
836
- 4. Nameplate Rating (Gross MWe):
778
- 5. Design Electrial Rating (Net MWe):
787
- 6. Maximum Dependable Capacity (Gross MWe):
764
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Whiali Restricted,1f Any (Net MWe):
- 10. Reasons For Restrictions.If Any:
'lliis Month Yr to.Date Cumulative 720.0 8,016.0 73,801.0
- 11. Hours In Reporting Period 720.0 6.740.5 60.626.9
- 12. Number Of Hours Reactor Was Critical 0.0 0,o
' O. o
'13. Reactor Reserve Shutdown Hours 720.0 6,670.5 59,628.0
- 14. Hours Generator On.Line
- 15. Unit Reserve Shutdown Hours 0.0 '
O.0 0.0-
- 16. ' Gross Thermal Energy Generated (MWH) 1,691,040.0 14,632,896.0 118,321,374.0
- 17. Gross Electrical Energy Generated (MWH) 569,794.0_,
4.866.949.0 37,347,736.0
- 18. Net Electrical Energy Generated (MWH) 551.437.0 4,710,332.0 36,007.710.0
- 19. Unit Service Factor 100.0 83.2 80.8
- 20. Unit' Availability Factor 100.0 83.2 80.8 l
- 21. Unit Capacity Factor (Using MDC Net) 100.2 76.9 63.9
- 22. Unit Capacity Factor (Using DER Net) 98.4 75.5 62.7
- 23. Unit Forced Outage Rate 0.0 3.0 3.9
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each t:
Refueline. May 1. 1983:~4 weeks
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION l.
8301270202 821202
~
PDR ADOCK 05000298 I"/771 R
PDR t
AVERAGE DAILY UNIT POWER LEVEL 050-298 DOCKET NO.
Cooper Nuclear Station WIT LATE December 2. 1982 e
COMPLETED BY P. L. Ballinger TELEl-iiONE 402-825-3811 MONTH November DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 764 770 1
g7 752 771 2
jg 3
754 19 773 4
766 20 773 5
765 731 21 773 6
766 22-7 719 772 23 776 772 8
24 777 772 9
25 777 10 26 773 13 775 772 27 772 12 g
768 13 771 772 29 769 14 30 772 l
l15 772 3,
l 16 772 1
INSTRUCTIONS On thi format. list the average daily unit power level in MWe Net for each day in 'he reporting month. Compute to the neare:t whole megawatt.
(9/77)
{
m 050-298 DOCKET NO.
UNIT SHUTDOWNS AND' POWER REDUCTIONS Cooper Nuclear Statioq UNIT N AME
-December 2, 1982-DATE COMPLETED BY.
P. L. Ballinger REPORT MONTil November TELEPHONE 402-825-3811
~h
=
s sc.
Cause & Currective ~
8."3 L
.2 _e E
,.s X Licensee g't.
Action to
. No.
Date g
3g 3
_g g 5 Event u7
$E 5
j i.i g Repor,e
,# G u
Prevent Recurrente 6
(NONI', DURING REPORTING PERIOD) l i
i 2
3 4
F: Forced Reason:
Method:
Exhibit G-Instructions 5: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data H. Maintenance of Test 2 Manual Scram.
Entry Sheets for 1icensee C-Refueling 3 Automatic Scram.
Event Report (LER) File (NilRI G.
D Regulatory Restriction 4 Other (Explain) 01611 E-Operator Training & License Examination 5
l F-Administrative Exhibit I - Same Source I
G-Operational Error (Explain) pf/77) ll Other (Explain)
m:--
9
~
- r OPERATIONS NARRATIVE
~
Cooper Nuclear Station November 1982-The plant-operatedithe month of November with no shutdowns or power reductions.
~
A capacity factor of:98.4% was achieved throughout the month.-