DUQUESNE LIGHT COMPANY Beavar Vcl1Gy Power Station NARRATIVE SIDefARY OF MONTHLY OPERATING EXP2RIENCE - N0'.' EMBER 1982 November 1 At 0450 hours0.00521 days <br />0.125 hours <br />7.440476e-4 weeks <br />1.71225e-4 months <br />, isolation of the D section of the main condenser was begun for tube inspection and plugging. At 0535 hours0.00619 days <br />0.149 hours <br />8.845899e-4 weeks <br />2.035675e-4 months <br />, upon request'of the system operator, the load was increased to about 820 MWe and a nominal 100% reactor power. The vacuum on the main condenser detto:1 orated continuously following the isolation of the D waterbox, thus causing a drop in the main unit-generator output to 740 MWe at 1206 hours0.014 days <br />0.335 hours <br />0.00199 weeks <br />4.58883e-4 months <br />. At 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br />, the D waterbox was returned to sat 971ce. Generator output was.

increased.cos 820 MWe at 1600 hours0.0185 days <br />0.444 hours <br />0.00265 weeks <br />6.088e-4 months <br />.

November 2 Station was in _ Operational Mode 1 with reactor power at a throug'a nominal 100% and "the Reactor Coolant System at normal oper-November 26 ating temperature and pressure.

November-27 With the station in Operational Mode 1 and the reactor at a through nominal 100% power, the following load changes took place at November 29 the request of the system operator: at 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> on the 27th the load was-decreased by 150 MWe to about 700 MWe and i

82% reactor power; at 0700 hours0.0081 days <br />0.194 hours <br />0.00116 weeks <br />2.6635e-4 months <br /> on the 27th, the load was increased 'to 870 MWe and a nominal 100% reactor power; at 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> on the 28th, the load was decreased 100 MWe to approximately 770 MWe and 87% reactor power; at 0800 hours0.00926 days <br />0.222 hours <br />0.00132 weeks <br />3.044e-4 months <br /> on the 28th, the load was increased to 870 MWe with reactor power at a nominal 100%; at 0000. hours on the 29th, the load was reduced by 150 MWe to about 705 MWe and 79% reactor power; at 0530 hours0.00613 days <br />0.147 hours <br />8.763227e-4 weeks <br />2.01665e-4 months <br /> on the 29th, the reactor was returned l

to a nominal 100% power.

N2vember.30 Station was in Operational Mode 1 with reactor power at a nominal 100% and Reactor Coolant System at normal operating temperature and pressure.

L l~

8301270165 821202 PDR ADOCK 05000334 PDR R

q.

e.

c.

e.

DUQUESNE LIGHT CCMPANY Beaver Valle'y Power Station MAJOR SAFETY-RELATED MAINTENANCE - NOVEMBER 1982 4

There was no major safety-related maintenance performed during November.

s e

e J

l J

j i

4-

s AV10tAGE DAll. UNIT POWER LEVEL 50-334 DOCXZT NO.

m 37?S Unit il DATE December 8,1982 -

CDMFtEIED BY J. L. Holtz -

TELEPHONE 412:343-1369.

November

,g i

DAY AYERAGE DAILY POWER LEVEL DAY AYERAGE DAILY POWEK !.EVEL (MWeNett (MWe+1stl 751 818 g

7 789 2

gg gi4 I~

810 822 3-g, 822 818 3

4 815 814 g,

21 813 822 6-g g

809 814

'4 7

y-808 830 f

g 3

1 814 818 9

g i

818 821 L

le 3

t 77.6 gg 810 27 810 786 12 g

822 776 q

13 3

810 792 g4 30 822 15 31 813 g4 INSTRUCTIONS On this format. !ist the awrap daily unit pimer Icet in MWe-Net for each day in the reportins inunih. Gunpute su the nearest whole mepwast.

(9.177)

~..

F,

,,n t

},

.e-r OPERATI G DATA RIPORT DOCKET NO. 50-334 DATE 12-8-82 COMPLETED BY J. L. Holtz TELEPHONE. til') 643-1369, OPERATING STATUS

!. Unit Nesse:. Bea m Valley Power Station, Unit #1 Notes November, 1982

2. Reporting Period.

L.I

3. LiemusedThannelPower(MWt):

7AAn

.. 4 Namepiste Rating (Gross MW,):

923

~

852

.S.' Design I!setrical Rating (Nec MWe):

6. wh Dependable Capeaty (Gross MW ):

860

7. u.h r ; --
  • Capacity (Not MWe).

-810

8. If Changes Occur in Capacity Ranags (Itsans Number 3 Thmagh 7) Sinsa Last Report, Give Reasons:
9. Power Level To Which Restricted,If Any (Net MWe):

None

10. Reasons For Restrier!ons,If Any N/A

' This Month

~

Yr.h Cmanistive 720' 8,016 57,720

..i

^

a.,

. 11. Boursla Reputing Feded

' 13.. Number Of Hours Reactor Was Critical 720 3,014.2 24,073.5 e 4,482.8

13. Reector Reeseve Shutdowa Houss 0

0 14 EoursGeneratorOh 720 2,902.1 23,056.2

15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH).

1,868,403.0 7,070,409.7 50,699,350

17. Gross Electrical Energy Generstad (MWH) 608,700 2,270,900 15,921,340
38. Net Electrical Energy Generated (MWH) 583,631 2,124.775 14,619,351
19. Unit Service Factor 100.0 36.2 42.2
20. Unic Availability Factor 100.0 36.2 42.2
21. Unit Capacity Factor (Using MDC Net) 100.1 32.7 34.5
  • 22. Unit Capacity Factor (Using DER Net) 95.1 31.1 32.8
23. Unit Forced Outage wate 0

6.7 37.0

24. Shatdowns Scheduled Over Next 6 Months (Type. Dete.and Duration of Eacht:
25. If Shut Down At End Of Report Period. Estimated Date of Surtup:
26. Units In Test Status IPrior to Commercial Operation):

Forecast Ach=ved INITIAL CRITICALITY N/A INITIAL ELECTRICIT*/

N/A N/A COMMERCIAL OPERATION N/A N/A

.