ML20070N089

From kanterella
Jump to navigation Jump to search
Amends 190 & 195 to Licenses DPR-44 & DPR-56,respectively, Eliminating Listing of Specific Position Titles for PORC Composition in Favor of Allowing Plant Manager to Appoint PORC Members
ML20070N089
Person / Time
Site: Peach Bottom  
Issue date: 04/26/1994
From: Chris Miller
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20070N093 List:
References
NUDOCS 9405050075
Download: ML20070N089 (8)


Text

_ _ _ - _ -.

l# RfC *%o n

iI

,E UNITED STATES

%I ii NUCLEAR REGULATORY COMMISSION

%, v,8 WASHINGTON, D.C. 20555-4001 PHILADELPHIA ELECTRIC COMPANY PUBLIC SERVICE ELECTRIC AND GAS COMPANY DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET N0. 50-278 PEACH BOTTOM ATOMIC POWER STATION. UNIT NO. 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 190 License No. DPR-56 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application fo'. amendment by Philadelphia Electric Company, et al.

(the licensee) daLd November 19, 1993, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I.

B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health or safety of the public; and E.

The issuance of this amtidment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. DPR-56 is hereby amended to read as follows:

9405050075 940426 PDR ADOCK 05000277 P

PDR

i

. j (2) Technical Soecificatiani The Technical Specifications contained in Appendices A and B, as revised through Amendment No.

190, are hereby incorporated in the

{

license. PECO shall operate the facility in accordance with the l

Technical Specifications.

3.

This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION i

Charles L. Miller, Director Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance:

April 26, 1994 i

r

~_

b ATTACHMENT TO LICENSE AMENDMENT NO. 190 FACILITY OPERATING LICENSE NO. OPR-44 DOCKET NO. 50-277 1

l Replace the following pages of the Appendix A Technical Specifications with the enclosed pages. The revised areas are indicated by marginal lines.

Remove Insert 246 246 l

l i

i

~

e

Unit 2 PBAPS 6.3 Facility Staff Qualifications 6.3.1 Each member of the facility staff shall meet or exceed the minimum qualifications of ANSI N18.1-1971 for comparable positions, except for (1) Senior - Health Physicist (radiation protection manager) who shall meet or exceed the qualifications of Regulatory Guide 1.8, September 1975 and (2) the Shift Technical Advisor who shall have a bachelor's degree or equivalent in a scientific or engineering discipline with specific training in plant design, and response and analysis of the plant for transients and accidents.

6.4 Trainina 6.4.1 A retraining and replacement training program for the facility staff shall be maintained under the direction of the Superintendent-Training and shall meet the requirements of Section 5.5 of ANSI N18.1-1971 and 10 CFR 55, Appendix A.

6.4.2 A training program for the Fire Brigade shall be conducted such that Fire Brigade members complete an instruction program within a two year period.

Regularly planned meetings will be held every 3 months.

6.5 Review and Audit 6.5.1 Plant Operations Review Committee (PORC) 6.5.1.1 Function The Plant Operations Review Comittee shall function to advise the Flant Manager on all matters related to nuclear safety.

6.5.1.2

.C. gap.gii11gn The Plant Operations Review Comittee is composed of nine regular members from Peach Bottom Atomic Power Station staff. Members shall collectively have experience in the following areas:

Plant Operations Engineering Maintenance Instrumentation and Controls

. ~. _

Planning Radiation Safety Chemistry Experience Assessment Members shall meet the requirements of ANSI N18.1-1971, Sections 4.2, 4.4, or 4.6 for applicable required experience and be appointed in writing by the Plant Manager. The Chairman and alternate Chairmen of the PORC shall be drawn from the PORC members and appointed in writing by the Plant Manager.

6.5.1.3 Alternates Alternate members shall be appointed in writing by the PORC Chairman to serve on a temporary basis; however, no more than two alternate members shall be used to satisfy a PORC quorum (See 6.5.1.5).

Amendment No. 27, 39, 61, 73, 96,.118,

-246-132, 155, 190

l..

l touq A

i W

3 UNITED STATES Q, g*v j/

  • i NUCLEAR REGULATORY COMMISSION g

WASHINGTON, D.C. 2055fH)001 i

PHILADELPHIA ELECTRIC COMPANY PUBLIC SERVICE ELECTRIC AND GAS COMPANY DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY 1

DOCKET NO. 50-277 l

PEACH BOTTOM ATOMIC POWER STATION. UNIT N0. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 195 License No. DPR-44 1.

The Nuclear Regulatory Commission (the Commission) has.found that:

A.

The application for amendment by Philadelphia Electric Company, et al.

(the licensee) dated November 19, 1993, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the l

Act), and the Commission's rules and regulations set forth in 10 CFR l

Chapter I.

B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health or sa#'ty of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of-the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. DPR-44 is hereby amended to read as follows:

J (2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 195, are hereby incorporated in the license.

PECO shall operate the facility in accordance.with the Technical Specifications, j

i 3.

This license amendment is effective as of its date of issuance.

1 FOR THE NUCLEAR REGULATORY COMMISSION h

Charles L. Miller, Director Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance:

April 26, 1994 i

~w--

7-e

--m-en.-e n.e e

,,e.w

.m,,e.

w -

i' ATTACHMENT TO LICENSE AMENDMENT N0. 195 FACILITY OPERATING LICENSE NO. DPR-56 DOCKET N0. 50-278 Replace the following pages of the Appendix A Technical Specifications with the enclosed pages.

The revised areas are indicated by marginal lines.

Remove

-Insert-246 246 l

l l

s t

l

.~

, - _ _ _ ~ - - -,.,. _,,

-, _ _. ~,,

Unit 3 PBAPS 6.3 Facility Staff Qualifications 6.3.1 Each member of the facility staff shall meet or exceed the minimum qualifications of ANSI N18.1-1971 for comparable positions, except for l

(1) Senior - Health Physicist (radiation protection manager) who shall meet or exceed the qualifications of Regulatory Guide 1.8, September 1975 and (2) the Shift Technical Advisor who shall have a bachelor's degree or equivalent in a scientific or engineering discipline with specific training in plant design, and response and analysis of the plant for transients and accidents.

l 6.4 Trainina 6.4.1 A retraining and replacement training program for the. facility staff shall be maintained under the direction of the Superintendent-Training and shall meet the requirements of Section 5.5 of ANSI N18.1-1971 and

.l 10 CFR 55,-Appendix A.

6.4.2 A training program for the Fire Brigade shall be conducted such that Fire Brigade members complete an instruction program within a two year period.

Regularly planned meetings will be held every 3 months.

6.5 Review and Audit 6.5.1 Plant Onerations Review Committee (PORC) 6.5.1.1 EMDC11RR The Plant Operations Review Comittee shall function to advise the Plant Manager on all matters related to nuclear safety.

6.5.1.2 Comoosition The Plant Operations Review Committee is composed of nine regular members from Peach Bottom Atomic Power Station staff. Members shall collectively have experience in the following areas:

Plant Operations Engineering Maintenance Instrumentation and Controls Planning Radiation Safety Chemistry Experience Assessment Members shall meet the requirements of ANSI N18.1-1971, Sections 4.2, 4.4, or 4.6 for applicable required experience and be appointed in writing by the Plant Manager. The Chaiman and alternate Chairmen of the PORC shall be drawn from the PORC members and appointed in writing by the Plant Manager.

6.5.1.3 Alternates Alternate members shall be appointed in writing by the PORC Chairman to serve on a temporary basis; however, no more than two alternate members shall be used to satisfy a PORC quorum (See 6.5.1.5).

Amendment No. 27, 39, 6f, 74, H,122,

-246-135, 157, 195

,