Responds to NRC Re Violations Noted in IE Insp Rept 50-361/82-38.Corrective Action:Maint Data Record Form Revised to Clarify Requirement to Record 10 Randomly Selected Cells Used to Determine Average Electrolyte Temp
ML20070M309
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 01/07/1983
From: Dietch R
SOUTHERN CALIFORNIA EDISON CO.
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20070M300 List:
References
NUDOCS 8301250121
Download: ML20070M309 (2)


Text

.

l .~ e ..

ffhD Southern California Edison Company a o. ox soO 4 ,,, /

003 g gg 2244 WALNUT GRC(C AVENUE

!*/

ROBERT DIETCH ROSEMEAD, CALIFORNIA 98770 (/g. mEmor

-a~=""'

January 7,1983 " $* "* *

0. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596-5368 Attention: Mr. R. H. Engelken, Regional Administrator

Dear Sir:

Subject:

Docket No. 50-361 IE Inspection Reports 50-361/82-38 Response to Notice of Violation San Onofre Nuclear Generating Station, Unit 2 Mr. T. W. Bishop's letter of December 9, 1982, issued IE Inspection Report 50-361/82 38 and forwarded a Notice of Violation resulting frora the

November 15 through November 19, 1982, inspection conducted by Mr. M. M.

Mendonca.

The enclosure to this letter provides the Southern California Edison Company response to the Notice of Violation contained in Appendix A of Mr.

Bishop's letter of December 9, 1982.

I trust the enclosure responds adequately to all aspects of the violation. If you have any questions or if we can provide additional information, please let me know. ,

Sincerely, cc: A. E. Chaffee (USNRC Resident Inspector - San Onofre, Units 2&3) 8301250121 830119 ~

PDR ADOCK 05000361 Q PDR ,

Ob-Yf

ENCLOSURE Response to the Notice of Violation contained in Appendix A to Mr. T. W. Bishop's letter of December 9, 1982.

Appendix A to Mr. Bishop's letter of December 9,1982, states:

" Technical Specification 6.8.1.C requires that written procedures be implemented for surveillance and test activities of safety related equipment.

Technical specification 4.8.2.1.b.3 requires quarterly surveillance of safety related batteries to verify that the average electrolyte temperature of ten connected cells is above 600F. Additionally, maintenance procedure

5023-I-2.13, ' Quarterly Inspection of Batteries,' paragraph 6.S.2, requires as l follows: 'Averaga of electrolyte temperature for 10 randomly selected cells

! and record cell numbers, cell temperature and average temperatures...'

l l Contrary to these requiremen;s on two occasions (February IS,1982 for Class l IE Battery No. B007, and May 19, 1982, for Class IE battery 8009) only five cells were used to calculate average electrolyte temperature."

l "This is a Severity Level V Violation. _(Supplement I)"

RESPONSE

1. CO .RECTIVE STEPS WHICH HAVE BEEN TAKEN AND RESULTS ACHIEVED l Although only five cells were used in the electrolyte temperature averaging during the February and May 1982 inspections, electrolyte temperatures for all sixt) cells were recorded during these inspections and all cells exceeded 6007. In addition, the' quarterly inspections of the identifed batteries were satisfactorily performed in August and November of 1982 with no recurrence of the omission noted in the Notice of Violation. The batteries were, and are, in satisfactory condition.
2. CURRECTIVE STEPS WHICH JILL BE TAKEN TO AVOID FURTHER ITEMS OF NON-COMPLIANCE The omission identified in the Notice of Violation was due to a lack of I clarity in the Maintenance Data Record Form (MDRF) which is the attachment to Maintenance Procedure SO23-I-2.13. The MORF is used to record data required by the procedure to be taken and was misunderstood l

by the electrician performing the inspection. The MORf has been revised i to clarify the requirement to record the ten randomly selected cells used '

to determine the average electrolyte temperature.

3. DATE WHEN FULL COMPLIANCE WILL BE ACHIEVE 0 Full compliance was achieved with the quarterly inspections performed in August and November of 1982. Actions to prevent recurrence (MORF revision) were completed DecemDer 16, 1982.

l h

6676 l

A .