ML20070L922

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Re Removal of 3.25 Limit on Surveillance Interval Extensions,Per Generic Ltr 89-14
ML20070L922
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 03/15/1991
From:
ENTERGY OPERATIONS, INC.
To:
Shared Package
ML20070L921 List:
References
GL-89-14, NUDOCS 9103200359
Download: ML20070L922 (3)


Text

_ _ _ _ _ _- _ ___ -___ - __- _ _ _ ___

, NL-Al[CI APPLICABIUTV SURVEILLANCE REQUIREMENTS 4.0.1 Surveillance Requirements shall be met during thw OPERATIONAL CONDITIONS or other conditions specified for inoividual Limiting Conditions for 0Aey g n unless otherwise stated in an individual Surveillance Requirement, ant e, $

4.0.2 Each Surveillance Requirement-shall be performed within the specified r

-t4me interval with/ 9

-a,.L-f maximus allowable extension not to exceed 25% of the3 surveillance intervag but.

b. The-combined-t4me 4nteneMon-any-bconsecutive-surve4444nce-4eteeve4-

-sha44-not 4xcee4-M5-t4mes-the-spec 4f4+c-surve4444nce-4*terveh 4.0.3 Failure to perform a Surveillance Requirement within the allowed surveillance interval, defined by Specification 4.0.2, shall constitute noncom-pliance with the OPERABILITY requirements for a Limiting Condition for Operation.

The time limits of the ACTION requirements are applicable at the time it is identified that a Surveillance Requirement has not been performed. The ACTION reouirements may be delayed for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to permit the completion of that surveillance wnen tne allowable outage time limits of the ACTION requirements are less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Surveillance Requirements do not have to be performec on inoperable equipment.

4.0.4 Entry into an CPERATIONAL CONDITION or other specified applicable condition shall not be made unless the Surveillance Requirement (s) associated with the Limiting Condition for Operation have been performed within the appifcable surveillance interval or as otherwise specified. This provision shall not prevent passage through or to OPERATIONAL CONDITIONS as required to comply with ACTION requirements.

4.0.5 Surveillance Requirements for inservice inspection and testing of ASME Code Class 1, 2, & 3 components shall be applicable as follows:

a. Inservice inspection of ASME Code Class 1, 2, and 3 components and inservice testing of ASME Code Class 1, 2, and 3 pumos and valves shall be performed in accordance with Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda as required by 10 CFR 50, Section 50.55a(g), except where specific written relief has been granted by the Coemission cursuant to 10 CFR 50, 3ection 50.55a(g)

(6) (1).

, b. Surveillance intervals specified in Section XI of tie ASME Boiler and Pressure Vesrel Code ane applicable Addenda for the inservice inspection and testing activities recuired by the ASME Boiler and Pressurs Vessel Codt and appli. cable Addenda shall be applicable as follows in these Technical Specifications:

GRAND GULF-UNIT 1 3/4 0-2 Amendment No. 69 7 9103200359 c10315 PDR ADOCK 050004 M P PDR

NL ,9 i / 01 3/a.0 APPt8CABIL8TV BASES (Con't) _

4.0.1 This specification establishes the reouirement that surveillances must be performed during the OPERATIONAL CONDITIONS or other conditions for which the requirements of the Limiting Conditions for Operation apply unless othemise stated in an individual Surveillance Requirement. The purpose 2f this specification is to ensure that surveillances are performed to verify the operational status of systans and comoonents and that parameters are within specified limits to ensure safe operation of the facility wnen the plant is in an OPERATIONAL CONDITION or other specified condition for which the individual Limiting Concitions for Operation are applicable. Surveillance Requirements do not have to be perfonned wnen the f acility is in an OPERATIONAL CONDITION for which the requirements of the associated Limiting Condition for Operation do not apply unless othemise specified. The Surveillance Requirements associated with a Special Test Exception are only applicable when the Special Test Excep-tion is used as an allowaole exception to the requiy@tsgma of a specification, 4.0.2 This specification establishes the nconoinens-undee wnich the spe-

ified time interval for Surveillance Requirements may be extenced.f 4tesHer D permits an allowable extension of the normal surveillance interval to facilitate surveillance scheduling and consideration of plant operating conditions that may not be suitable for conducting the surveillance; e.g. , transient conditions or other ongoing surveillance or maintenance activities. )Jtee-e-+4mRs-the 3Q un 0f the-prev 444sas-of-4tesar--te-enswee--that it is-not-usee-repeatedly-to-

-extend the-seve444ar.se-4nterval bcy; ;d thet-speciffed. The limitwf-Spectf4 4 /

44t4en-4rorG-are based on engineering judgment and the recognition that the most procable result of any particular surveillance being performed is the verifica-These-prev +s4 ens-are- l tion sufficient to ensure that the reliability obtained throug h surveillance activ-of conformance with the Surveillance Requirements.A ities is not significantly degraded beyond that obtained from the spec 1fied Insert surveillance interval. 8 i 4.0.3 This specification establishes the failure to perform a Surveillance l Recuirement within the allowed surveillance interval, definea by the provisiens of Specification 4.0.2, as a condition that constitutes a failure to meet the OPERABILITY requirements for a Limiting Condition for Operation. Under the pro-

! visions of this specification, systems and comoonents are assumed to be OPERABLE wnen Surveillance Requirements have been satisfactorily performed within the specified time interval. However, nothing in this provision is to be construed as implying that systems or unponents are OPERABLE when they are found or known to be inoperable although still meeting the Surveillance Requirements. This specification also clarifies that the ACTION requirements are applicaule when Surveillance Requirments have not been completed within the allowed surveil-l lance interval and thit the time limits of the ACTION requirements apply from l the point in time it 13 identified that a surveillance has not been performed and not at the time tha' the allowed surveillance interval was exceeded. Com-pletion of the Surveillance Requirement within the allowaole outage time limits of the ACTION requirements restores compliance with the requirements of Specifi-cation 4. 0. 3. However, this does not negate the fact that the failure to have performed the surveillance within the allowed surveillance interval, defined by the provisions of Specification 4.0.2, was a violation of the OPERABILITY GRAND GULF-UNIT 1 B 3/4 0-4 Amencment No. 69,_._

Insert to Page J _3/_4_0f4 1 In grt A:

It also provides ticxibility t so modate the icngth of a fumi cycle for surveillances that are perforeca at each refueling outage and are sr-af fled with an 18-month surveillance interval. It is not inteided that this ,irov.sion be used repeatedly as a convenience to extend surveillance intervaln beyond that specified for sorveillances that are not performed during refueling outages.

The limitation of Specification 4.0.2 is Insert B:

This provision is G9102261/SNLICFLR - 13

. . _ _ . _ _ - - _ - - - . . - . _ - . . .. . _ . _ - _ _ - - . . _ - -