Monthly Operating Repts for Feb 1991 for Peach Bottom Units 2 & 3.W/undated Ltr
ML20070L259
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 02/28/1991
From: Baron M, Miller D
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9103190366
Download: ML20070L259 (14)


Text

.

)

^t

.g d..

-+

g b

PIIILADELPHIA ELECTRIC COMPANY PEACil BUTIDM A1DMIC POWl:R STATION R. D.1. Box 208

- Delta,IYnnsylanta 17314 reacu morrou-tm P'wsm or tscrutNCE (7I7) 4$h7014 -

DJ 8. Miller, Jr..

Yke PresidentJ-

\\?

s Docket Nos. 50 277 s

6 50 278 U.S. Nuclear Regulatory Commission-Document Control Desi-Washington, DC 20555

- SUBJEcr:

Peach Bonm Atomic Power Station Monthly' Operating Report

- Gen'lemen:

t Enclosed are twelve copies of the monthly operating report for Peach Bottom Units 2 and a for the month of February 1991 forwarded pursuant to Technical Specification 6.9.1.d under the guidance of Regulatory Guide 10.1, Revision 4.

Sincerely, A

g

+

  • w s 5L r

DBM/ AF/ JN/I)RM/MJB: cmc Enclosure -

cc:

R.A. Burricelli, Public Service Electric & Gas T.M. Gerusky, Commonwealth of Pennsylvania J.J. Lyash, USNRC Senior Resident inspector R.

McLean, State of Maryland T,T. Martin, Administrator, Region I, USNRC H.C. Schwemm, Atlantic Electric j

-J. Urban, Delmarva Pawer INPO Records Center pom!.NRC -

U 031E>366 *1022e 1

(DR ADOCK 05000277 PDR g'p t/.

'It d

  • 4 NRC Monthly Operations Summary Peach llottom Atomic Power Station Februa7 1991 UNM 1 The unit ruained it. the refuel mode for the entire month, with outage activities in progress. The scheduled end of the outage is March 27,1991. Critical path aethities are currently nine days behind scheduled.

UhlT 3 Except for control rod pattern adjustments, the unit operated at nomina' 100% power for the entire month.

CC0291.NRC

. o Docket No. 50 277 Attachment to Monthly Operating Report for February 1991 s

UNIT 2 REI'UEl ING INFORM ATION 1.

Name of facility:

Peach llottom Unit 2 2.

Scheduled date for next refueling shutdown:

(1) Reload 8 in progress.

(2) Reload 9 scheduled for September 7,1992.

3.

Scheduled date for restart following refuenng:

(1) Restart following refueling forecast for March 21,1991.

(2) Restart following refueling forecast for November 22,1992, p

I 4.

Will refueling or resumption of operation therefore require a technical specification change or other license amendment?

l-(1) Yes.

l-(2) Requirements for Reload 9 have not been determined.

L If answer is yes, what, in general, will these be?

(1) Safety limit MCPR for cycle 9 prior to resumption of operation.

5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

(1) Submitted December 17,1990.

6.

Important licensing considerations associated wilt.cfueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

CCO291,NRC

Docket No. 50 277 Attachment to Monthly Operatin' Report for February 1991 Page 2 UNIT 2 REFUELING INFORMATION (Continued) 7.

The number of foci assemblics (a) in the core and (b) in the spent fuel storage pool:

Following Reload 8:

(a)

Core 764 Fuel Assemblies (b)

Fuel Pool-1894 Fuel Assemblics,58 Fuel Rcds 8.

The present licensed spent fuel pool storage capacity and the size of any incicase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

September 2003 without full core offload capability.

September 1997 with full core offload capability.

l

' CC0291.NRC

Docket No,50 278 Attachment to Monthly Operating Report for February 1991 UNIT 3 REFUEL,1NG INFORMATION 1.

Namo of fa<:llity:

Peach Bc: tom Unit 3 2.

Scheduled date for next refueling shutdown:

Reload 8 scheduled for September 9.1991 3.

Scheduled date for restart following refueling Restart following refueling scheduled for December 8,1991 s,.ytion of opara.. a thereafter requirc a technical specification change or other 4.

Will refueling o 6

license amendmen'9

Yes, if answer is yes, wh', in general, will these be?

Safety limit MC.'R for cycle 9 fuel.

5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

Submitted December 17,1990.

6.

Important licensing consideratione, associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or perforinance analysis methods, significant changes in fuel design, new operating

. xedures:

CC0291.NRC

l 1

Docket No. 50-278

.i e

Attachment to Monthly Operating l

Report for February 1991 l

Page 2 UNIT 3 REFUEt,iNG INFORMATION (Continued) 7.

The number of fuel assemblics (a) in the core and (b) in the spent fuel storage pool:

(a)

Core 764 Fuel Assemblies (b)

Fuel Pool 1496 Fuel Assemblics,6 Fuel Rods 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies. Modification of the fuel pool is expceted to be complete in the second quarter of 1991 9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

With the current fuel pool capacity (prior in the completion of the fuel pool reracking :nodification):

September 1996 without full core offload capability.

End of next cycle with full core ofiload capability (est. January 1991).

With increased fuel pool capacity (subsequent to the completion of the fuel pool reracking niodification):

September 2004 without full core offload capabili.ty.

September 1998 with full core offload capability.

l CCO291.NRC

r 4

't 3

AVERAGE DAILY UNIT POWER LEVEL

- DOCKET NO, 50 - 277 UNIT PEACH SOTTOM UNIT 2-i DATE MARCH 15, 1991 COMPANY PHILADELPHIA ELECTRIC COMPANY-M. J. BARON SUPERVISOR REPORTS GROJP PEACH BOTTOM At0MIC POVER STATION

= TELEPHONE (717) 456-7014 EXT. 3321 MONTH FEBRUARY-1991 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POVER LEVEL

' (KdE-NET ).

(KdE-NET) 1 0

17 0

2

-0 18 0

3 0

19 0

4 0

20 0

0 21 0

6 0

22 0

7 0

23 0

8 0

24 0

.9 0

25 0

10-0 26 0

^

11 0

27 0

12 0

28 0

13 0

14-0 i

.1%.

0

_16 _

0 4

=9 y

-~-

,w,--

m

=-e.

w

m.

..~

m.

if ft AVERAGE' DAILY UNIT PDVER LEVEL

)

DOCKET NO, 50 + 278 c-

""?CH BOTTDM UNIT 3 DATE

.H 15. 1991 COMPANY,d!LADELPHIA ELECTRIC COMPANY M. J. BARON SUPERVISDR i

REPDRTS GROUP PC4CH BOTTOM ATOMIC POVER STATION TELEPHONE (?!?) 456-7014 EXT. 3321 MONTH FEBRUARY 1991 4

DAY AVERAGE DAILY POWER LEVEL

.0AY AYERAGE DAILY POWER LEVEL (MWE-WET)

(MWE-NET) 1 1055 17 913 2

1064 18 1049 3

1060.

19 1064 4'

1060 20 1068 5

'1068 21 1077 6

1046 22 1068 7

1050 23 1064 8

1062 24 1064 9

1063 25 1068 10 1067 26 1060 11 1060

'27 1068

+

3 12 1060' 28 1055-lh

'1060 "141

.1058 l

15 -

1063-16

.-735 u

S

[ !.

t

!.k l

&,$ ~^

u

,. a

~.. -,.. -

r

-.1 c4 OPERATING DATA REPORT DOCKET NO. 50 277 DATE MARCH 15, 1991 COMPLETED BY PHILADELPHI A ELECTRIC CUMPANY M. J. BARON SUPERVISOR REPCRTS GROUP PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-7014 EXT. 3321 OPERATING STATUS

1. UNIT NAME: PEACH BOTTDM UNIT 2 NOTES:
2. REPORTING PERIOD: FECRUARf,1991 REFUELING OUTAGE.

3.LICENSEDTHERMALPOWER(MVT':

3293 4, NAMEPLATE RATING (GROSS MWE):

1152

5. DFSIGN ELECTRICAL RATING (NET MWE):

106S

~

6. MAXIMUM DEPENDADLE CAPACITY (GROSS MWE): 1098
7. MAXIMUM DEPENDABLE CAPACITY l NET MVE):

bh5

.l 4.............

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ifEMS NUMBER 3 THROUGH 7) 51NCE 1 AST REPORT, GIVE REASON 5:
9. POVER LEVEL TO WHICH RESTRICTED, IF ANY (NET MVE):
10. REASONS FOR RESTRICTIONS, IF ANY; THli NONTH YR.T0-DATE COMUL A!!VE T11. HOURS IN REPORTING PERIOD--

672

. 416 145,992

)

-12.' NUMBER OF HOURS REACTOR VAS CRIT *,AL -

0-264.4 86,965.1

13. REACTOR RESERVE SHUTDOWN HOURS
0.0.

0.0 :

0.0 -

<!4,- HOUki GENERATOR ON-LINE 0.0-264.4 83.840.5 7.........-

~

0.0

0.0

- 0;0 IS, UNIT-RESJAVF;$h0TDOWN HOURS

'16. GROSS THERMAL-ENERGY GENERATED (MVH) '

0 855,720 247,272,7S3 17.-GROSSELECTRICALENUU.YGENERATED(MWH) 0 284,000 81,292,290

-L 18.- NET ELECTRICAL-ENtdGY GENERATED (MWH)-

-1,636 271.567 77.826,213 PAGE I 0F 2~

q

\\

l i

i l

.?

s l-OPf Ai!NG DATA REPORT (CONTINUED)

DOCKET:NO. 60 277-DATE MARCH IS, 1991 l

THl$ HONTH YR 10-DATE CUMUL AT IVE 19, UN!i SERVICE FACTOR 0,0 18.7 57.4

20. UNIT AVAILABILITY FACTL2 0.0 18.7 57.4
21. UNIT CAPACITY FACTOR (USING MOC NET) 0.0 18.2 S0.5
22. UNIT CAPACITY FACTOR (USING DER NET) 0,0 18.0 50.1
23. UNIT FORCED OUTAGE RATE 0.C 0.0 14.3 24, SHUTDOVNS SCHEDULED DVER NEXT 6 MONTH 5 (TYPE, DATE, AND DLRAi!ON OF EACH):

l l

l

25. IF SHUTDOWN AT (ND OF REPORT PERIOD, EST! MATED DATE OF STARTUP:

}

H00E SVITCH TO STARTUP MARCH 24, 1991, I-

' 26 _ UNITS IN TE$i STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVCD e

JNITIAL-CRITICALITY 09/16/73 INiilA!. ELECTRICITY 02/18/74 COMMERCIAL vPERA1109 07/05/74

.,k PAGE 2 0F 2

  • '-' NEGATIVE VALUE REPOR'F0 FOR CONSISTENCY VITH FEDGAL ENERGY REGULATOAf *t dC^,iv. REPORIS.

11 i

r e

i t

r v

.,e,,,-

m

)

.0PERATING DATA REPORT DOCKET NO. 50 - 278 DATE MARCH 15, 1991 j

COMPLETED BY PHILADELPHIA ELECTRIC COMPANY M. J. BARON SUPERVISOR REPORTS GROUD

-l PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-7014 EXI. 3321

)

OPERATING $1ATUS

i i
1. UNIT NAME: PEACH 00TTOM UNIT 3 NOTES:

2, REPORTING PERIOD: FEBRUARY,1991

3. L] CENSED TriERMAL POVER(MVT):

3iG3 4.NAMEPLATERATING(GROSSMVE) 1152 5.DESIGNELECTRICALRAllkG.(NETMVE):

1065-6, MAXIMUM DEPENDABLE CAPACITY (GROS $ MVE): 1098

7. MAXIMUM DEPEhJABLE CAPACITY (NET-HVE) 103$

l 8, IF CHANGES'0CCDR'IN CAPAC11( RATINGS (ITEMS NUMBER _3 THROUGH 7) SINCE LAST REPOR1, GiVE REASONS:

9. POWER LEVEL TD VHICH RESTRICTED, IF ANY (NET MWEli r

. 10. REASONS FOR RESTRICTIONS, IF ANY:

i THIS MONTH Yk-10-DATE CUMULATIVE

11. HOURS lN REPORTING PERIOD 67*

1,4161 141,888:

12. NUMBER OF H00d5 REACTOR VAS CRITICAL 672.0

'.296.5 86.299.4 13, REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0

0. 0.-
14. HOURS GENERATCR ON-LINE 672.0:

1,273,7 83,364,3'

15. UNIT LESERVE SHLTD0VN HOURS b 0; h0 hb
16. GROSS THERMAL ENERGY GENERATED (MVH) 2,162,664 3,990.264 243,842.770 17, GROSS ELECTRICAL ENERGY GENERATED (MVH)-

723,100 1,323,500 79,999,032

-18.. NET ELECTRICAL ENERGY GENERATED (MVH) 701,905 1,262,772

.76,659,4i4

'I PAGE 1 0F 2 1

1 1

s

i

-5

-i OPERAT]NG DATA REPORI (CONTINUED).

DOCKET NO. 50 - 278 i

i.

DATE KARCH 15, 199)

THis MONTH YR-TO-DATE CUMUL AllVE

- 19. UN]T SLPVICC FACTOR 100.0 90.0 58.8

20. UNIT AVAIL ASILITY FACTOR 100.0 90.0 58.B 21.UNITCAPACITYiACTOR(USINGMDCNET) 10t> 4 87.5 52.2

- 22. UNIT CAPACITY FACTOR (USING DER NET) 98.1.

85,1 50.7

23. UNIT FORCED OUTA3E kATE 0.0 10.0 -

12.5 24, SHUTDOWNS SCHEDULED OVER NEXT $ MONTHS (TYPE,-DATE, AND DURATION OF EACH):

. 2$, IF' SHUTDOWN AT END OF REPORT PERIOC ESilHATED DATE OF STAR'VP:

p

.s.

26. UNITS IN= TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

F0i '-

ACHIEVED INiilAL CRlitCP. liv-08/07/74L INITIAL ELECTRICITi 09/01/74 I

COMMERCIAL OPERATION 12/23/74 5

1 PAGE 2 0F 2-a.

'[

---_a_--_.__.

b i

jg.*;_

...i

-a,,

..z

.i-i UN'T SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 777 L

UNIT NAME PEACH BOTTOM UNIT 2

't DATE MARCH 15, 1991 REPORT MONTH FEBRUARY, 1991 CDMPLETED BY PHIL ACELPHI A ELECTRIC COMPANY M. J. BARON SUPERV150R

=E REPORTS GROUP l-PEACH BOTTOM ATOMIC POVER STATION TELEPHONE (717) 456+7014 EXT, 3321>

METHOD 0F LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTf!NG DOWN EVENT CODE CODE ACTION TD N0;

-DATE-(1)

(HOURS)

(t)

REACTOR (3)

REPORT #

(4)

(5)

PREVENT RECURRENCE I

l-910201-S 672.0 N/A ZZ ZZZZZZ PL ANNED REFUEL OUTAGF.-

P h

b

j j

672.0 l

j s

1

?-

4 (1)

(2)'-

(3)

(4)

F - FORCED REASON METH00 EXHIBIT G - INSTRUCT 10NS

,E

'S - $CKEDULE02 l A - EQUIPMENT FAILURE- (EXPLAIN) 1 MANUAL

'ENIRY SHEETS FOR LICENSEE FOR PREPARATION OF DATA

-B - MAINTENANCE OR TEST I - MANUAL SCRAM.

l C - REFUELING ~

3 - AUTOMATIC $(R AM.

EVENT REPORT (LER) 0 - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)-

FILE (NUREG-0161) r n

i.

E OPERATOR TRAINihG + LICENSF EXAMINATION F - ADMINISTRATIVE (5)

G - OPERA'!ONAL' ERROR (EXPLAIN)

H - OTHER(EXPLAIN)=

EXHIBli ! - SAME 190RCE Q

i l

I!

l k r...

. m

y.

- -. ~

~

..:-..7.,=

o

+ < -; * - :

+

s I

s UNii $HUTDOWNS AND POWER REDUCTIONS -

DOCKET NO. 50 - 278 ll UNil NAME PEACH B0110M UNIT 23 DATE MARCH 15,~1991 REPORT HONTH FlBRUARY,1991 COMPLETED BY PHILADELPHIA Elff'RIC COMPANY:

M. J. BARON:'

'l SUPERVISOR REPORTS GROUP PEACH BOTTOM ATOMIC POWER 51All0N -

TELEPHONE (717) 456-7014 EXT. 3321

. METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CDRRECTIVE TYPE DURATION REASON $HUTilNG D0VN EVENT CODE CODE ACil0N TO

.NO.

OATE (1)

(HOURS)

(2)-

RE ACTOR (3)-

REPORT #

(4)

(5)

PREVENT RECURRENCE

-2' 910216 S

0,0 H.

4

_N/A

.~ RB _

CONROD_

CONTROL R00 PATTERN ADJUSTMENT.

~

REACiOR WAS NOT SHUT DOWN.

l (1)L

(2).

. (3) :

(4)

F ' FORCED', -REASON,.

METHOD- -

EXHIBIT 0 - INSTRUCil0NS

.S - SCHEDUl[0, "A - EQUIPMENT FAILURE (EXPLAIN) '

.2. MANUAL SCRAM.

ENTRY SHEEf5 FOR LICENSEE 1. MANUAL

.FOR PRfPARATION OF DATA 8'. MAINTENANCE OR TEST C - REFUEL!HG..

3 - AUTOMATIC 3 CRAM.

EVENT REPORT -(LER)

D. REGULATDRY RE5tRIC110N ?

4 OTHER-(EXPLAIN)

FILE-(NUREG-0161)

E - OPERATOR 1RAlklNG + LICENSE:EXAMINAi!0N-F~. ADMINISTRATIVE -

(5)-

G - OPERATIONAL ERROR (EXPLAlk)

H-OTHER(EXPLAIN)

- EXHIBil ! - SAME. SOURCE

~.