Requests Schedule for Insp of Listed Plants & Poses Questions Raised Following Alleged Problems Associated W/Bwr Designed by GE
ML20070K485
Person / Time
Site: Nine Mile Point, FitzPatrick  Constellation icon.png
Issue date: 07/14/1994
From: Rauch J
AFFILIATION NOT ASSIGNED
To: Selin I, The Chairman
NRC COMMISSION (OCM)
References
NUDOCS 9407260290
Download: ML20070K485 (1)


Text

$b O0D 50 533 73 Koster Row Buffalo, R.Y.

14226 Ivan Selin, Chairman 7-14-94 Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852

Dear Commissioner Selin:

A recent Associated Prese story (Chicago 3-94) indicates that at least ten boiling water reactore designed by GE have developed internal cracks which could result in serioue problems, even core meltdown, in the course of an unusual event.

I understand that Niagara !ohawk's Nine tile 2 reactor has been inspected for euch problems and been found to be OK.

When will the core shroud and reactor internal components be inspected at Nine

'Ille 1 and the :?ew York Power Authority's Fitzpatrick plant?

When will 'Iine ':ile l's steel dry well liner be inspected for corrosion?

Pleoce send me the schedule for all these inpections.

Since.:cv, 'iork currently hac over 7,000MW of excess capacity at peak demand, it would seen prudent to err on the side of safety if any errore are to be made.