Amend 90 to License NPF-30,re Deletion to Sections 2.3 & 4.3, Cultural Resources, of App B,Environ Protection Plan
ML20070H224
Person / Time
Site: Callaway Ameren icon.png
Issue date: 07/13/1994
From: Wharton L
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20070H227 List:
References
NUDOCS 9407210164
Download: ML20070H224 (5)


Text

--

g% MCy y

i UNITED STATES j

'j NUCLEAR REGULATORY COMMISSION t

WASHINGTON, D.C. 2066E4001

\\,*****/

UNION ELECTRIC COMPANY CALLAWAY PLANT. UNIT 1 DOCKET NO. 50-483 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 90 License No. NPF-30 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment filed by Union Electric Company (UE, the licensee) dated February 21, 1992, supplemented by letters dated April 16, 1992, and March 29, 199'.. complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),

and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical 4

Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-30 is hereby amended to read as follows:

9407210164 940713 PDR ADOCK 05000483 P

PDR

. (2) Technical Soecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No.

90, and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated.into the license. UE shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of-issuance. The Technical Specifications are to be implemented within 30 days from the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION L. Raynard Wharton, Project Manager Project Directorate III-3 Division of Reactor _ Projects III/IV Office of Nuclear Reactor Regulation

Attachment:

i l

Changes to the Technical l

Specifications l

Date of issuance:

July 13, 1994 b

l l

)

ATTACHMENT TO LICENSE AMENDMENT NO. 90 OPERATING LICENSE NO. NPF-30 DOCKET NO. 50-483 Revise Appendix B Environmental Protection Plan by removing the pages.

identified below and inserting the enclosed pages. The revised pages are identified by the captioned amendment number and contain marginal lines indicating the area of change. The corresponding overleaf 'page is also provided to maintain document completeness.

REMOVE INSERT TABLE OF CONTENTS

-TABLE OF CONTENTS 2-1 2-1 4-2 4-3 I

l l-l.

I l

i 1

CALLAWAY PLANT UNIT 1 ENVIRONMENTAL PROTECTION PLAN (NON-RADIOLOGICAL).

TABLE OF CONTENTS-Section g

1.0 Objectives of the Environmental Protection Plan 1-1 2.0 Environmental Protection Issues 2-1 2.1 Aquatic' Issues......._..............

2-1 2.2 - Terrestrial Issues...................-

.2-1 3.0 Consistency Requirements................

3-1 3.1 Plant Design and Operation...............

3-1 3.2 Reporting Related to_the NPDES Permit and State tertification...................

3-2 3.3 Changes Required for Complianca with Other Environmental Regulations 3-3 4.0 Environmental Conditions 4-1 4.1 Unusual or Important Environmental Events 4-1 4.2 Aerial Remote Sensing 4-1 5.0 Administrative Procedures 5-1 5.1 Review and Audit....................

5 5.2 Records Retention 5-1 L

5.3 Changes in Environmental Protection Plan........

5-1 5.4 Plant Reporting Requirements..............

5-1 l

l l

i l.

Amendment No. 90 l

~

2.0 Environmental Protection Issues In the FES-OL dated January,1982, the staff considered the environmental.

impacts associated with the operation of Callaway Plant.

Certain-environ-mental issues were identified which required study 'or license conditions to Jresolve. environmental concerns and to assure. adequate protection.of the environmental.

2.1 Aquatic Issues No. specific aquatic issues were raised by the staff in the FES-OL.

2.2 Terrestrial Issues The specific. terrestrial issue raised by the staff. in the FES-OL is the need -

to undertake a limited-term terrestrial monitoring program by'means of infrared aerial photography with accompanying ground truth aimed at monitoring the impact of cooling tower. drift on the local flora.

(FES-OL: Section 5.5.1.6)

)