ML20070H073

From kanterella
Jump to navigation Jump to search
Proposed Tss,Changing Analog Channel Operational Test Interval for Selected Radiation Monitors from Monthly to Quarterly
ML20070H073
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 07/15/1994
From:
WOLF CREEK NUCLEAR OPERATING CORP.
To:
Shared Package
ML20070H028 List:
References
NUDOCS 9407210090
Download: ML20070H073 (2)


Text

'

l i

Attachment IV to CO 94-0005 Page 1 of 2 l

I t

t 1

i l

l ATTACHMENT IV l

PROPOSED TECHNICAL SPECIFICATION CHANGE l

l i

l 9407210090 940715 ADOCK 05000482 PDR POR p

~

Attachment IV to CO 94-0005 Page 2 of 2 TABLE 4.3-3 6

O RADIATION MONITORING INSTRUMENTATION FOR PLANT y

OPERATIONS SURVEILLANCE REQUIREMEN_T3 NT oy ANA' OG MODES FOR rn CHANNEL WHICH SURVEIL-7 CHANNEL CHANNEL OPERATIONAL LANCE IS c

FUNCTIONAL UNIT CHECK CAllBRATION TEST REQUIRED E

1. Containment

[

a. Containment Atmosphere-Gaseous Radioactivity-High (GT-RE-31 & 32)

S R

QM All l

b. Gaseous Radioactivity-RCS Leakage Detection (GT-RE-31 & 32)

S R

QM 1,2,3,4 l

c. Particulate Radioactivity -

RCS Leakage Detection e

(GT-RE-31 & 32)

S R

QM 1, 2, 3, 4 l

a

[

2. Fuel Building N
a. Fuel Building Exhaust-Gaseous Radioactivity-High (GG-RE-27 & 28)

S R

QM l

b. Criticality-High Radiation Level
1) Spent Fuel Fool S

R QM l

(SD-RE-37 & 38)

2) New Fuel Pool (SD-RE-35 & 36)

S R

QM l

3. Control Room

[

Air intake-Gaseous Radioactivity-High (GK-RE-04 & 05)

S R

QM AD l

  • With fuel in the respective fuel storage pool "With irradiated fuel in the fuel storage areas or fuel building.

.