Monthly Operating Rept for June 1994 for Callaway Plant Unit 1
ML20070F942
Person / Time
Site: Callaway Ameren icon.png
Issue date: 06/30/1994
From: Blosser J, Mcinvale J
UNION ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ULNRC-3041, NUDOCS 9407190242
Download: ML20070F942 (6)


Text

- - - -

Callusy Piant

  • Post O!!n Bon 620 Fulton. Missouri 65251 July 11,1994 j i

! I l 1 4

i UNION i Etscriac a  ;

Nuclear Regulatory Commission Document Control Desk l Washington,DC 20555 i

j ULNRC-3041 i

l

Dear Sir:

i I DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 '

l MONTHLY OPERATING REPORT l' JUNE.1994 l

l The enclosed Monthly Operating Report for June,1994 is submitted pursuant to f section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.

r J. D. Blosser f

Manager, Callaway Plant hs JDB/DEY/JA=L AM/JBM/ad l

Enclosure l

l cc: Distribution attached  :

i l j l

l l

l 1 -

9407190242 940630 , i

'PDR ADOCK 05000483-- l R PDR l

cc distribution for ULNRC-304I with enclosures i Mr. M. J. Farber, Chief Reactor Projects Section 3C U.S. Nuclear Regulatory Commission Region 111 801 Warremille Road Lisle,IL 60532-4351 Mr. L. R..Wharton (2 copics) .

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 1 White Flint, North, Mail Stop 13E21 1155 Rochille, MD 20852 NRC Resident Inspector Manager, Electric Department Missouri Public Senice Commission P.O. Box 360

' Jefferson City, MO 65102 l

i I

I l

l f -.

i

  • DOCKET NO. 50-483 UNIT NAME . . CALLAWAY UNIT 1 l

l DATE- 07-11 94 i l

1 COMPLETED BY-- J. B. McInvale l TELEPHONE 314/676-8247 i

PART A OPERATIONS

SUMMARY

The plant operated at approximately 100% power for the month of June with the follouing exception: ,

Power was reduced to 97% briefly for instrument calibrations on 06-24-94.

I PART B PORV AND SAFETY VALVE

SUMMARY

1 l

l None i i

i I

i I

l l

l l

l l

l Page 1 of 4

PART C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-483 UNIT Callaway Unit 1 DATE 07-11-94 COMPLETED BY J. B. McInvale TELEPHONE 314/676-8247 MONTH: JUNE 1994 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net) DAY (MWe-Net) 1 1146 17 1134 2 1156 18 1134 3 1157 19 1131 4 1148 20 1129 5 1142 21 1133 6 1142 22 1135 7 1142 23 1135 8 1149 24 1140 9 1156 25 1140 10 1150 26 1144 11 1149 27 1142 12 1138 28 1138 13 1128 29 1141 l

14 1121 30 1143 15 1128 31 l

! 16 1131 l

l l

l l Page 2 of 4 l

l

1 PART D OPERATING DATA REPORT  ;

I DOCKET NO. 50-483 l UNIT NAME CALLAWAY UNIT 1 l DATE 07-11-94

, COMPLETED BY J. B. Mcim ale l TELEPHONE 314/676-8247 1

\

OPERATING STATUS (YTD) (CUM)  !

1. REPORTING PERIOD: JUNE 1994 GROSS IlOURS IN REPORTING PERIOD: 720 4343 83,508.5 2 CURRENTLY AUTilORIZED POWER EVEL(MWt): 3565 MAX. DEPEND. CAPACTIY (MWo. Net): 1115 DESIGN ELECTRICAL RATING (MWe-Net): 1171
3. POWER LEVEL TO WlIICII RESTRICTED (IF ANY)(MWe-Net):

j 4. REASONS FOR RESTRICTION (IF ANY):

TIIIS MOhT{ YR TO DATE CUMULATIVE

5. NUMDER OF !!OURS REACTOR WAS CRmCAL... 720 4343 73,289.7
6. REACTOR RESERVE SIIUTDOWN llOURS. 0 0 0 .

l

7. HOURS GENERATOR ON LINF 720 4309.7 71,864.8 f
8. UNrr RESERVE SliUrDOWN llOURR 0 0 0
9. GROSS TIIERMAL ENERGY GENERATED (MWil). 2,543,816 15,141,364 242,006,452
10. GROSS ELECTRICAL ENERGY GENERATED (MWH)... 860,324 5,189,784 82.560,907
11. NET ELECTRICAL ENERGY GENERATED (MWII) 820,794 4,956,119 78,520,170
12. REACTOR SERVICE FACTOR 100.0 100.0 87.8
13. REACTOR AVAI1 ABILITY FACTOR 100.0 100.0 87.8
14. UNIT SERVICE FACTOR 100.0 99.2 86.1
15. UNrr AVAILABILITY FACTOR . 100.0 99.2 86.1
16. UNIT CAPACITY FACTOR (Using MDC). 102.2 102.3 84.3
17. UNIT CAPACITY FACTOR (Using Design MWe)..... 97.4 97.5 80.3 18 UNIT FORCED OUTAGE RATE 0.0 0.0 2.39
19. SHUrDOWNS SCHEDULED OVER NEXT 6 MONTIIS (TYPE, DATE, AND DURATION OF EACH):
20. IF SHUR DOWN AT END OF REPORTING PERIOD, ESTIMATE DATE OF STARTUP: N/A l

l Page 3 of 4

PART E UNIT SIRTTDOWNS AND POWER REDUCTIONS ,

DOCKET NO. 50-483 UNITNAME CAllAWAY UNIT I DATE 07-11 94 COMPIITED BY 1 R McInvale

'ITIEPIIONE 314'676-8247 REPORT MONTil: JUNE 1994 METIIOD OF TYPE SilUTTING DowW F: IURCED DURAllON Tile REACTOR OR S: SCIIEDULED (IIOURS) REASON REDUCINO POWER CORRECTIVF1ACTIONSU)MMEV. I3 EQ DATE

SUMMARY

REASON METIIOD A: EQUIPMENT FAILL'RE(EXPLAIN) 1: MANUAL B: MAINT.ORTEST 2: MANUALSCRAM C: RERJEllNG 3: AUTOMATIC SCRAM D: REGUlA1 DRY RESTRICTION 4: OTIIER(EXPLAIN)

E: OPERATORTRAINING AND LICENSE EXAMINATION F: ADMINISTRATION G: OPERATIONAL ERROR (EXPLAIN) 11: OTIIER(EXPLALN)

Page 4 of 4