ML20070F755

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept DER 82-51 Re Pullman-Kellogg Pipe Lining Failure in ERCW Sys.Initially Reported on 820910. Final Rept Will Be Submitted by 830208
ML20070F755
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 12/01/1982
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-22433-GHD, DER-82-51, NUDOCS 8212210237
Download: ML20070F755 (2)


Text

_

DocktNah. 50-528/529/530 e'

50.55 (c) R: port R'CElyg;;

imc Arizona Public Service Company

((']

Po. Box 21666 e PHOENIX, ARIZONA 85036 f212: 37 December 1, 1982 ANPP-2243g-GHD/BSK UIGIiyjy U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention:

Mr. D. M. Sternberg, Chief Reactor Projects Branch 1

Subject:

Time Extension For Report - DER 82-51 A 50.55(e) Potentially Reportable Deficiency Relating to Pullman-Kellogg Pipe Lining Failure In Unit 1 Essential Cooling Water System File: 82-019-026 D.4.33.2

Reference:

(A) Telephone Conversation between J. Eckhardt and G. Duckworth on September 10, 1982 (B) ANPP-21973 dated October 8, 1982 (Interim Report)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B). At that time, it was estimated that a Final Report would be available by December 2, 1982.

Due to the extensive evaluation required, it is now expected that this information will be finalized by February 8, 1983, when a complete report l

will be submitted.

I Very truly yours, CCL hq LLC E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects Management ANPP Project Director EEVBJr/GHD:db cc: See Attached Page 2 9212210237 021201

" = o = i=l

,E A

y 9

U. S. Nuclear Regulatory Commission December 1, 1982 Attention:

Mr. D. M. Sternberg, Chief ANPP-22433-GHD/BSK l

Page 2 f

cc: Richard DeYoung, Director l

Office of Inspection and Enforcement

-U. S. Nuclear Regulatory Commission Washington, D. C. 20555 I

T. G. Woods, Jr.

J. A. Roedel D. B. Fasnacht G. C. Andognini A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli J. R. Bynum Lynne Bernabei, Esq.

Harmon & Weiss 1725 "I" Street, NW Washington, D. C. 20006 R. L. Greenfield Aosistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503

._.J