Docket No. 50-528/529/530 50.55 g Report
!!.bD Arizona Public Service Company n J j
P O. BOX 21666. PHOENIX. ARIZON A 85036
/
November 29, 1982 2' 3?
ANPP-22405-GHD/.RSK MIO!/It;,3 U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention:
Mr. D. M. Sternberg, Chief Reactor Projects Branch 1
Subject:
Time Extension For Report - DER 81-14 A 50.55(e) Potentially Reportable Deficiency Relating to A-354 Anchor Bolt Failures File: 82-019-026 D.4.33.2
Reference:
(A) Telephone Conversation between J. Eckhardt and B. S. Kaplan on May 29, 1981 (B) ANPP-18271 dated June 24, 1981 (Interim Report)
(C) ANPP-19693, dated December 14,1981 (E:.: tension)
(D) Telephone Conversation between Bob Dodds and George Duckworth on January 5, 1982 (Extension)
(E) ANPP-19871, dated January 11, 1982 (Interim Rev. 1)
(F) ANPP-21181, dated June 15, 1982 (Interiu Rev. 2)
(G) ANPP-21746, dated August 31, 1982 (Extension)
(II) ANPP-22139, dated October 28, 1982 (Extension)
Dear Sir:
The NRC was notified of a potentially reporta'c?e deficiency in References (A) and (B), revised Interim Reports were transmitted by References (E) and (F), and time extensions were requested by References (G) and (II).
At that time, it was estimated that a Final Report would be available by October 22, 1982.
Due to the extensive evaluation required, it is now expected that a Final Report, including reports from Tcledyne Engineering Services and Battelle Pacific Northwest Laboratories, will be submitted by January 31, 1983.
Very truly yours, O
(CCLL.Mtlk c c(,
k E. E. Van Brunt, Jr.
APS Vice President Nuclear Projects Management 8212210077 821129 ANPP Project Director PDR ADOCK 05000528 S
PDR EEVBJr/GIID:db cc: See Attached Page 2
.e o
U. S. Nuclear Regulatory Commission November 29, 1982 Attention:
Mr. D. M. Sternberg, Chief ANPP-22405-Gild /BSK Page 2 i
cc: Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.
j J. A. Roedel i
D. B. Fasnacht I
G. C. Andognini A. C. Rogers B. S. Kaplan l
W. E. Ide J. Vorees J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L.-Patterson R. W. Welcher R. M. Grant D. R. Itavkinson L. E. Vorderbrueggen G. A. Fiorelli J. R. Bynum Lynne Bernabei, Esq.
Ilarmon & Weiss 1725 "1" Street, NW Washington, D. C. 20006 l
R. L. Greenfield l
Assistant Attorney General Bataan !!emorial Building Santa Fe, New !!exico 87503