ML20070E162

From kanterella
Jump to navigation Jump to search
Submits Annual Rept of Challenges to Main Steam Line Safety/ Relief Valves for 1990.On 900106 & 1117,safety Relief Valves H & P Lifted Automatically to Control Reactor Pressure During Reactor Scram
ML20070E162
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 02/28/1991
From: Hagan J
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9103050015
Download: ML20070E162 (1)


Text

O PSlEG

~

_Pubhc Service Electric and Gas Company P.O. Box 236 Hancocks Bndge, New Jersey 08030 o

Hope Creek Operations February 28, 1991 U.S.

Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

ANNUAL REPORT TECl!NICAL SPECIFICATION 6.9.1.5 HOPE CREEK GENERATING STATION DOCKET NO.

50-354 This annual report of challenges to Main Steam Line Safety /

Relief Valves (SRVs) is being submitte' pursuant to the requiremento of Technical Specification 6.9.1.5 for the year 1990.

During 1990, llope Creek experienced the fol'.owing unplanned challenges to SRVs :

1.

On 1/6/90, SRVs "II" and "P"

(Lo-lo set SRVn) lifted automatically to control-reactor pressure Ouring the course of a reactor scram.

The circumotances surrounding the lifting of these SRVs are described

.. LER 90-001-00.

2.

On 11/17/90, SRVo "II" and "P"

liftod automatically to control reactor. pressure during the courne of a reactor scram.

The circumatances surrounding the lifLing of these SRVs are described in LER 90-028-00.

Please note that SRVs "11" and "P" are the " low-low set" SRVo at Hope Creek, and are c.'esigned to arm and initially lif t at 1047 PSIG.

No other challenges to SRVs occurred during this reporting per 1.

Sincerely, I

1 GencQY Manager Hope Creek Operations RBC/

7 C: Distribution The Energy People

  • l(0 p, g 9103050015 910228 PDR ADOCK 05000354 "2"*'*"

R PDR