ML20070D339
| ML20070D339 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 02/22/1991 |
| From: | HOUSTON LIGHTING & POWER CO. |
| To: | |
| Shared Package | |
| ML20070D332 | List: |
| References | |
| NUDOCS 9102280207 | |
| Download: ML20070D339 (2) | |
Text
.
e 4.
r ATTACllMENT 2
. PROPOSED TECt!NICAL SPECIFICATION 3,3',3,1, TABLE 3-3 6, FUNCTIONAL UNIT 1.a
- o-4 I
u A1/009.N20
-9102280207 910222 PDR ADOCK 05000498 P
-.....- - - -.-.. - --- - --.~- -
1ABtt 316] Continued)
" i]2[/gmg)[ g y
$1-HDAEJ70'/ _
t AC110N STAT [HfNTS
~
~
j AC110N 31 -
With-less than the Minimum Channels OPERA 8t( requirement, operation may continue for up to 30 days provided grab samples of the contai*.msnt atmos re are obtained and analyzed at least once ter 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> #
AC110N 32 -
(NotUsed)
AC110N 33 *
(Not Used)
ACTION 34 -
Must satisfy the ACTION requirement for Specification 3.4.6.1.
YW
%m
- Crab samples are not required to be obtained 'for the-duration of containment pressurization for an Integrated Leak Rate Test (ILRT)'provided that a grab sample is obtained and analyzed at the start of depressurization of containment following the ILRT.
d
' SOUTH -lEXA5 - UNils 1 & 2 3/4 3-52
, _ _