Text
,,p> *
[
\\
ie,(y,4gfI f
UNITED STATES
,.y NUCLEAR REGULATORY COMMISSION 5
?
W ASHINGToN. D.C. 20$$$-0001 POWER AUTHORITY OF THE STATE OF NEW YORK DOCKET N0. 50-333 JAMES A. FITZPATRICK NUCLEAR POWER PLANT AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 214 License No. DPR-59 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Power Authority of the State of New York (the licensee) dated December 22, 1993, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by change: to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of facility Operating License No. DPR-59 is hereby amended to read as follows:
9407070062 940627 PDR ADOCK 05000333 P
I t.
i (2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 214, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its issuance to be implemented within 30 days.
FOR THE NUCLEAR REGULATORY COMMISSION
[UlA l
Mic ael L. Bo eting Director Project Directorate I-l i
Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: June 27, 1994
]
.,,--__-,__._,,.,....__..._-_m,
ATTACHMENT TO LICENSE AMENDMENT N0.214 ffCILITY OPERATING LICENSE NO. DPR-59 DOCKET NO. 50-1 H Revise Appendix A as follows:
Remove Paae Insert Paae 244c 244c
JAFNPP A.
Hioh Pressure Water Fire Protection Systern (Cont'd)
A.
High Pressure Water Fire Protection System (Cont'd) 3.
If 1. above cannot be fulfatted, place the reactor in Hot it em Frecuency Standby within six (6) hours and in Cold Shutdnwn within the following thirty (30) hours.
h.
Fire pump diesel engine Once/ Month by verifying the fuel storage tank contains at least 172 gations of fuel.
i.
Diesel fuel from each tank is Once/Ouarter l
within the acceptable limits for quahty as per the following:
Flash Point
- F 125*F min.
Pour Point
- F 10*F max.
Water & Sediment 0.05% max.
Ash 0.01 % max.
Distillation 90% Point 540 min.
Viscosity (SSU) @ 100*F 40 max.
Sulfur 1 % max.
Copper Strip Corrosion No. 3 max.
Cetane #
35 min.
j.
Fire pump diesal engine by Once/18 months inspection during shut down in accordance with procedures prepared in conjunction with manufacturers recommendations and verifying the diesel, starts from ambient conditions on the auto start signal and operates for > 20 minutes while loaded with the fire pump.
Amendment No. 34,164.100. 214 SdAe