Forwards Supplemental Info Re Status of Selected NUREG-0737 Requirements Covered by Generic Ltrs 82-05 & 82-10,in Response to NRC 820317 & 0505 Requests
ML20070C615
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 12/06/1982
From: Utley E
CAROLINA POWER & LIGHT CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-1.A.1.3, TASK-2.E.4.2, TASK-2.F.1, TASK-2.K.3.18, TASK-3.A.1.2, TASK-3.A.2.2, TASK-3.D.3.4, TASK-TM GL-82-05, GL-82-10, GL-82-5, NUDOCS 8212140250
Download: ML20070C615 (3)


Text

-

~

Cp&L Carolina Power & Light Company DEC 061982 Mr. Darrell G. Eisenhut, Director Division of Licensing United States Nuclear Regulatory Commission Washington, D.C. 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 SUPPLEMENTAL INFORMATION FOR CNERIC LETTERS 82-05/82-10 POST-TMI REQUIREMENTS

Dear Mr. Eisenhut:

Your letters of March 17, 1982 (Generic Letter 82-05) and May 5, 1982 (Generic Letter 82-10) requested Carolina Power & Light Company (CP&L) to provide information concerning certain post-TMI requirements. The requested information was submitted by our letters dated April 23, 1982, June 9, 1982, June 24, 1982, and July 1, 1982.

Due to the length of time since CP&L provided responses to your letters, the status of several items which were the subject of your letters has changed. The attached enclosure contains supplemental information updating the status of selected post-TMI items covered by Ceneric Letters 82-05 and 82-10.

If you have any questions on these items, please contact our steff.

Yours very truly,

'E. E. Utley)

Executive Vice President Power Supply and Engineering & Construction Ob WRM/pgp (5778C2T4)

Enclosure E. E. Utley, having been first duly sworn, did depose and say that the information contained herein is P. rue and correct to his own personal knowledge or based upan information and belief.

$ 1/24L f @ ?/) V No Notary '(Seal)

~

geenre,

  • @ My commission expires: OCT 041986 ooo .

" n At cc: Mr. D. O. Myers (NRC-BSEP) rgo Mr. J. P. O'Reilly (NRC-RII)

., g

,goTARyi 3

~4 Mr. D. B. Vassallo (NRC)

Mr. J. A. Van Vliet (NRC) I Ayg(gC f j N / $

S. ,. g Q. 411 Fayetteville Street

  • P. O. Box 1551 e Raleigh. N. C. 27G02 ,( 1 [

___ _= __ _  % , m,,,-

ENCLOSURE .

NUREG-0737 ITEM SCHEDULED AFTER MARCH 1, 1982 NRC CP&L lTEM RECOMENDED SCHECULE REQUIREMENT STATUS / SCHEDULE REFERENCES C0eNENT II.E.4.2.7 JJ l y 1, 1982 Isolate purge and vent on radiation signal. Incomp lete CP&L Ltr. Will submit response

, Containment isolaticn 4/23/82 based on BWR Owtss' Dependsbility &oup analysis by 1/31/83 Bl.F.1.3 January 1,1982 Instal l I n-containment radiation-level conitor, thit 1 - Reload 3 CP&L Ltr.

Accident Monitoring Pt. 3 Un i t 2 - Complete' 4/23/82 Containment Radiation Monitors ll.F.I.5 January 1,1982 Provide continuous Indication of containment water th i t 1 - Re load 3 CP&L Ltr.

Accidsnt Monitoring Pt. 5 level. thit 2 - Four to 4/23/82 Containment Water Level six months follow-Monitor Ing startup from Reload 4

1. A . I . 3.1 Octo%r 1,1982(a) Revise administrative procedures to limit overtime Complete (per CP&L Ltr. Administrative Pro-Limit Overtime in accordance with NRC Policy Statement Issued by Generic Letter 6/9/82 cedures revised per Generic Letter No. 82-02, dated February 8,1982 82-12) NRC Ltr. Generic Letter No.

6/15/82 82-12 (Superseded by Generic Letter No.

82-02).

l lI.F.1.1/2 January 1,1982 InstalI noble gas ef fluent monitors and provide lhlt 1 - 6/1/83 CP&L Ltr.

Ef fluent Monitoring capability for ef fluent monitoring of lodine. Un i t 2 - 6/1/83 4/23/82 1

t (a) Schedule revised by Commission action on SECY-81-440

  • Represents a change to previous status.

}

l

i s s

NRC CP&L ITEM RECOMMENDED SCHEDULE REQUIRENENT STATUS / SCHEDULE REFERENCES COMENT ll.X.3.18 Septenber 30, 1982 Submit revised position on need f or modif ications. Incomp l ete CP&L Ltr. Wi ll submi t plant-ADS Actuation 6/9/82 specific response '

based on BWR Owners' Group analysis by 1/31/83 d

Ill.A.1.2 October 1, 1982 Complete Modif Ications. Not Applicable SECY-82-Ill Schedule to be estab-Upgreda Emergency lished consistent with Support Facilities future guidance based on SECf-82-Ill October 1, 1982 Complete modif ications. Not Applicable SECY-82-111 Schedule to be estab- ,

lit.A.2.2

, Meteorological Data lished consistent with I f uture guidance based i on SECY-82-Ill.

lil.D.3.4 Plant specific Modif y f acility as identif led by licensee study. Complete CP&L Ltr. Subject of current Control Room proposals 10/21/82 discussions with staf f. ,

Habit &bility NRC Ltr.

8/27/82 A