. 3 l *- .

?

s

~

N y

~

OPERATING DATA REPORT '

y s c DOCKET NO. 50-286 DATE 12-1-a2 COMPLETED BY L. Auterito s

TELEPHONE (9141 710-8200 I

OPERATING STATUS s.

~

Indian Point No. 3 nuclear powe,. pl,nt otes .

1. Unit Name: ~
2. Reporting Period: Novonber 1982

+

3. Licensed Ther.at Power (MWt): 3025 -
4. Nameplate Rating (Gross MWe): 1013 -

s

5. Design Electrical Rating (Net StWe): 965 . 3 . ,

U~

6. Mulmum Dependable Capacity (Gross MWe): 9M
7. Maximum Dependable Capacity (Net MWe): 891 _
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Ressons:

l ^-"

9. Power Level To Which Restricted. lf Any (Net MWG: '
10. Reasons For Restricticas,if Any:

\

,.L ,

' 7 '. . .

This M[ nth \ Yr..to.Date Cumulative'  ?

s ,

[_

I 720 8,016.0 54,a17.0

11. Hours In Reporting Period l* 0 * '

1,984.0 34.090.8

12. Number Of Hours Reactor Was Critical -

-0 jM 0 0

43. Reactor Reserve Shutdown Hours -

0 'i ' '1,969.6 32,913.1 I4. Hours Generator On.Line

( --15. Unit Reserve Shutdown Hours 0 ,% 0 0 0 5,060,030 86,143;401

16. %ss Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWil) 0 1,502,170 26.298.300
18. Net Electrical Energy Generated (MWH) 0 1,436,036 25,193,443 _w 0 24.6 60.0 ,
19. Unit Service Factor "
h. Unit Availability Factor 0'* 24.6 c0.0 0 20.1 51.6
21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net) --

0 --

18.6 47.6

^

23. Unit Forced Outage Rate " 0 u _. 2.3 14.3
34. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duratica of Each): ,

Rofuolino Outane in Pronress.

~

Ulmn. completion of scheduled

  • 25, If Shut Down At End Of Report Period. Estimated Date of Startup: miDtenance Est. dato ( Foin. a3)
26. Units In Test Status (Prior to Commercial Operation): ,

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY l COMMERCIAL CPERATION .

8212140070 821209 '

PDR ADOCK 05000286 R pgg ,

-- . . _ _ _ _ . . ~ , . _ , _ _ '. t/771

.y AVERAGE DAILY UNIT POWER LEVEL l . .

DOCKET NO. _50-286 Indian Point s UNIT Mn 3 4

', DATE _12-1-82 COMPLETED BY L. Auterino

. TELEPHONE (914) 739-8200 MONTH November 1982 DAY- AVERAGE DAILY POWER LEVEL DAY /

AVERAGE DAILY POWER LEVEL (MWe-Net) (ywe. Net) 1 0 o 37 2 0 gg o 3 0 0 39 4 0 20 0 5 0 0 21 6 0 0 22 9

n . 0 ..

8 0 0 24 l

9 0 0

. 25 l' 10 0 26 0 .

t II 0 0 .

k, 27 t

.^ '

' L O 0 12 28

]

13 0 '

0 29 I4 _0- 30 0 15 0

- 33

,e~

16 0 s

- ~

~> INSTRUCTI,0NS s C" On this format. list the average Jaily unit power level in MWe. Net for each day in the reporting month. Compute to the nearest whole megawatt.

k

> - (9/77) 4 s c , "

- - - - - - .~ , ~ - > - . . - . . - - - - .

s DOCKET NO. 50-286 l UNIT SIlUTDOWNS AND POWER REDUCTIONS UNIT NAME Indian Point No. 3 DATE 12-1-82 -

COMPLETED BY L. Autt-rino REPORT MONTil November 1982 TELEPflONE foldi 719-8220 ,

g _

c r. 4 m3 5a

. .2 _e g g=x Licensee ev, c. Cause & Corrective -

Nii. Date g 3g  ;; jg5 Event U? $3 Action to '

  • 5 E0

$E j@g Report *

}U , Preveni Recurrence ,

c -

i 04 820325 S 720 P&C N/A N/A N/A Unit in'a scheduled cycle III-IV refueling and maintenance outage.

, +

l N' s I 3 - .

3 4 F: Forced Reason: '

Method: Exhibit Inst ructions -

S: Scheduled

\

A-Equipment Failure (Explain)  !-Manual for Preparation of Dari '

B-Maintenance or Test 2-Manual Scram., Entry Sheets for Licensee

  • C Refueling 3 Automatic Scram. Event Report (LER) File (NUREG-D Regulatory Restriction 4-Ot her ( Explain) 0161)

E-Operator Training & License Examination F Administrative 5 G-Operational Error (Expbin) Exhibit , Same Source (9/77) 1101her (Explain)

S 9

, ,  ?

MONTilLY MAINTENANCE REPORT 9 November 1982 Month .

L'p a 0,'CE EQUIPMENT - MALFUNCTION CORRECTIVE ACTION -

r-Feedwater Regulator Valves Planned Inspection  ! Valves rebuilt -

I-2808 9-28-82 I-3030 10-1-82 Fan Cooler Unit #32 Clevis Pins Binding  % Cleaned and lubricated pins B Damper 's I-3033 10-2-82 Fan Cooler Unit #34 Clevis Pins Binding Cleaned and lubricated pins- ~ [

B and D Damper I-3218 11-10-82 Service Water Valve SWN-44 Valve shaft seals leaking Replaced valve outlet of fan cooler y unit #32 I-3196 11-15-82 Boric Acid Transfer Mechanical Seal leaking Replaced seal pump #32

' Rotating element installed in I-2648 11-22-82 Sys e Service Water Pump Planned maintenance Service Water pump #35 I-3240 11-30-82 Fan Cooler Unit #32 Hose leaking Replaced hose -

O 9 ,

i .

1 e

, e e:

F

MONTilLY I & C CATEGORY I REPORT November 1982 Month .

Date l W.R. # Equipment Malfunction Corrective Action IC-1-1487-2 9/20/82 Reactor coolant pump seal Transmitters leaking Replaced transmitters with new water flow transmitters units from stock FI-ll6, FI-143, FI-144, FI-ll5 IC-1-1720-2 10/28/82 Accoustic monitor Channel Constant alarm displayed Repaired BNC connectors on 5 charge pre-amp and accelero-meter IC-1-1805-2 10/15/82 . Instrument Air Compressor Switch defective Replaced temperature switch

  1. 32 temperature switch TC-1107S IC-1-1817-2 10/25/82 Service water pump IIi-Lo Constant alarm displayed Replaced pressure switch alarm. Pressure control switch PC-llll IC-1-1854-2 11/8/82 Source vault area radia- Improper reading Repaired broken high tion monitor, RE-315 Voltage lead at detector l

SUMMARY

OF OPERATING EXPERIENCE Indian Point Unit 3 remained shutdown for the entire reporting period.

' Unit repairs, modifications and preventive maintenance. is: proceeding as-scheduled.

Steam generator sleeving and girth weld repairs are in progress and proceeding as scheduled.