MONTHYEARML20248B2371998-03-31031 March 1998 Revised Monthly Operating Rept for March 1998 for Indian Point Station Unit 2 ML20029C7801994-03-31031 March 1994 Monthly Operating Rept for Mar 1994 for Indian Point Unit 1. W/940415 Ltr ML20247G5171989-04-30030 April 1989 Monthly Maint Category I Rept Pages from Monthly Operating Rept for Apr 1989 for Indian Point ML20154M5661988-08-31031 August 1988 Monthly Operating Rept for Aug 1988 for Indian Point Station Unit 2 ML20154M5691988-07-31031 July 1988 Revised Page to Monthly Operating Rept for Jul 1988 for Indian Point Station Unit 2 ML20236P9861987-10-31031 October 1987 Monthly Operating Rept for Oct 1987 ML20235Y9681987-09-30030 September 1987 Monthly Operating Rept for Sept 1987 ML20236A5811987-09-30030 September 1987 Monthly Operating Rept for Sept 1987 ML20234D7771987-08-31031 August 1987 Monthly Operating Rept for Aug 1987 ML20237J6511987-07-31031 July 1987 Monthly Operating Rept for Jul 1987 ML20235U7571987-06-30030 June 1987 Monthly Operating Rept for June 1987 ML20215F3711987-05-31031 May 1987 Monthly Operating Rept for May 1987 ML20214H5111987-04-30030 April 1987 Monthly Operating Rept for Apr 1987 ML20214E9541987-04-30030 April 1987 Monthly Operating Rept for Apr 1987 ML20206Q6951987-03-31031 March 1987 Monthly Operating Rept for Mar 1987 ML20206R6201987-03-31031 March 1987 Monthly Operating Rept for Mar 1987 ML20207T1321987-02-28028 February 1987 Monthly Operating Rept for Feb 1987 ML20207R6861987-02-28028 February 1987 Monthly Operating Rept for Feb 1987 ML20206R6451987-02-28028 February 1987 Revised Monthly Operating Rept for Feb 1987 ML20211E1381987-01-31031 January 1987 Monthly Operating Rept for Jan 1987 ML20211J1481987-01-31031 January 1987 Monthly Operating Rept for Jan 1987 ML20212P8891986-12-31031 December 1986 Monthly Operating Rept for Dec 1986 ML20207P9801986-12-31031 December 1986 Monthly Operating Rept for Dec 1986 ML20215E8501986-11-30030 November 1986 Monthly Operating Rept for Nov 1986 ML20211Q0501986-11-30030 November 1986 Monthly Operating Rept for Nov 1986 ML20212L9131986-10-31031 October 1986 Monthly Operating Rept for Oct 1986 ML20214D0211986-10-31031 October 1986 Monthly Operating Rept for Oct 1986 ML20203P1081986-09-30030 September 1986 Monthly Operating Rept for Sept 1986 ML20209J0801986-08-31031 August 1986 Monthly Operating Rept for Aug 1986 ML20214K4281986-07-31031 July 1986 Monthly Operating Rept for Jul 1986 ML20207C3021986-06-30030 June 1986 Monthly Operating Rept for June 1986 ML20207C3171986-06-30030 June 1986 Monthly Operating Rept for June 1986 ML20211F7351986-05-31031 May 1986 Monthly Operating Rept for May 1986 ML20198A2731986-04-30030 April 1986 Monthly Operating Rept for Apr 1986 ML20205P6911986-04-30030 April 1986 Monthly Operating Rept for Apr 1986 ML20141E6071986-03-31031 March 1986 Monthly Operating Rept for Mar 1986 ML20141E6121986-03-31031 March 1986 Monthly Operating Rept for Mar 1986 ML20140B8481986-02-28028 February 1986 Monthly Operating Rept for Feb 1986 ML20154P0171986-02-28028 February 1986 Monthly Operating Rept for Feb 1986 ML20141D2331986-01-31031 January 1986 Monthly Operating Rept for Jan 1986 ML20153E3491986-01-31031 January 1986 Monthly Operating Rept for Jan 1986 ML20140B8541986-01-31031 January 1986 Rev I to Monthly Operating Rept for Jan 1986 ML20140A8211985-12-31031 December 1985 Monthly Operating Rept for Dec 1985 ML20141J1861985-12-31031 December 1985 Monthly Operating Rept for Dec 1985 ML20138P4981985-11-30030 November 1985 Monthly Operating Rept for Nov 1985 ML20138M5941985-11-30030 November 1985 Monthly Operating Rept for Nov 1985 ML20136E8811985-10-31031 October 1985 Monthly Operating Rept for Oct 1985 ML20138J7921985-09-30030 September 1985 Monthly Operating Rept for Sept 1985 ML20205C7241985-08-31031 August 1985 Monthly Operating Rept for Aug 1985 ML20134F6881985-07-31031 July 1985 Monthly Operating Rept for Jul 1985 1998-03-31
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H8501999-10-14014 October 1999 Safety Evaluation Supporting Amend 197 to License DPR-64 ML20206U2551999-02-0909 February 1999 Safety Evaluation Supporting Amend 187 to License DPR-64 ML20236Y1571998-08-0303 August 1998 Part 21 Rept Re ASTM A351,GR. CF8 Matl at Indian Point Being Out of Specifications in Molybdenum & Chromium.Cause & Corrective Actions Are Not Stated ML20236V4281998-07-13013 July 1998 Safety Evaluation of TRs WCAP-14333P & WCAP-14334NP, PRA of RPS & ESFAS Test Times & Completion Times. Repts Acceptable ML20236T5511998-06-24024 June 1998 Consolidated Edison Co of Ny,Indian Point Unit 2,Drill Scenario Number 1998C ML20248B2371998-03-31031 March 1998 Revised Monthly Operating Rept for March 1998 for Indian Point Station Unit 2 ML17264A9381997-07-10010 July 1997 Deficiency Rept Re Potential Safety Hazard Associated w/FM-Alco 251 Engin,High Pressure Fuel tube-catalog: 4401031-2 in Which Dual Failure Mode Exists.Caused by Incorrect Forming Process ML18153A1431997-06-10010 June 1997 Part 21 Rept Re Possible Machining Defect in Certain Stainless Steel Swagelok Tube Fitting Bodies.Facilities Have Been Notified About Possible Problem ML20210E3591997-03-27027 March 1997 Part 21 Rept Re Sorrento Electronics Inc Has Determined Operation & Maint Manual May Not Adequately Define Requirements for Performing Periodic Surveillance of SR Applications.Caused by Hardware Failures.Revised RM-23A ML1005008001997-02-28028 February 1997 Conditional Extension of Rod Misalignment TS for Indian Point 3. ML20115J3981996-07-22022 July 1996 Interim Part 21 Rept Re 3/4 Schedule 80 Pipe Furnished to Consolidated Power Supply.Investigation Revealed Only One Nuclear Customer Involved in Sale of Matl ML20096E5101995-12-31031 December 1995 Resubmitted Rev 13 to QA Program ML17059A3611994-07-0606 July 1994 Emergency Action Level Verification & Validation Rept. ML17311A0181994-05-13013 May 1994 New York State EAL Upgrade Project Verification & Validation Rept. ML20029C7801994-03-31031 March 1994 Monthly Operating Rept for Mar 1994 for Indian Point Unit 1. W/940415 Ltr ML20056E5171993-08-31031 August 1993 Technical Review Rept, Tardy Licensee Actions ML20062J2281993-07-23023 July 1993 Consolidated Edison Co of Ny Indian Point Unit 2,Drill Scenario 1993 ML20118A2681992-12-31031 December 1992 Consolidated Edison Co of Ny Indian Point,Unit 2 Exercise Scenario,1992 ML20125C7161992-12-0707 December 1992 Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl ML20127P5861992-11-23023 November 1992 Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl ML20096H2301992-05-21021 May 1992 Special Rept:On 920504,south Side Lower Electrical Tunnel Detection Sys 8 Taken Out of Svc for Mod to Reposition Detection Sys Run of Conduit.Detection Sys Declared Operable on 920520 After Mod Completed & Sys Retested ML20079F9181991-05-31031 May 1991 Structural Evaluation of Indian Point,Units 2 & 3 Pressurizer Surge Lines,Considering Effects of Thermal Stratification ML20059E9461990-08-31031 August 1990 Nonproprietary Rev 2 to Indian Point 2 Tube Fatigue Reevaluation ML20059G2011990-07-31031 July 1990 Final Rept on Steam Generator Insp, Repair & Restoration Efforts During 1990 Midcycle Insp ML20058K4151990-06-30030 June 1990 Steam Generator Insp,Repair & Restoration Program Presentation to Nrc ML20058K4121990-06-30030 June 1990 Status Rept,Indian Point Unit 2 Mid-Cycle Steam Generator Insp Presentation to Nrc ML20043A4891990-05-30030 May 1990 Nonproprietary Indian Point Unit 2 Steam Generator Insp, Repair & Restoration Program. ML20042F1441989-12-31031 December 1989 New York Power Authority Annual Rept for 1989. W/900430 Ltr ML19332B9371989-11-30030 November 1989 Nonproprietary Info Presented to NRC Re Indian Point Unit 2 Steam Generator Secondary Side Loose Objects. ML19332D6661989-10-31031 October 1989 Nonproprietary Rev 2 to Indian Point Unit 2 Steam Generator Girth Weld/Feedwater Nozzles Rept Spring,1989 Outage. ML20247J8161989-07-31031 July 1989 Safety Evaluation for UHS Temp Increase to 95 F at Indian Point Unit 3 ML20248B3171989-06-30030 June 1989 Rev 1 to Nonproprietary WCAP-12294, Indian Point Unit 2 Steam Generator Girth Weld/Feedwater Nozzles Rept,Spring 1989 Outage ML20248D3631989-06-30030 June 1989 Rev 1,to Indian Point Unit 3 Reactor Vessel Fluence & Ref Temp PTS Evaluations ML20247N5331989-05-31031 May 1989 Nonproprietary Indian Point Unit 2 Steam Generator Girth Weld/Feedwater Nozzles Rept Spring,1989 Outage ML20247J8071989-05-31031 May 1989 Containment Margin Improvement Analysis for Indian Point Unit 3 ML20247G5171989-04-30030 April 1989 Monthly Maint Category I Rept Pages from Monthly Operating Rept for Apr 1989 for Indian Point ML20244C3311989-04-10010 April 1989 Safety Evaluation Supporting Amend 137 to License DPR-26 ML20248F4211989-03-31031 March 1989 NSSS Stretch Rating-3,083.4 Mwt Licensing Rept ML20235V5931989-03-0202 March 1989 Special Rept:During Cycle 6/7 Refueling Outage Scheduled from Feb-May 1989,openings Will Be Made in Plant Penetration Fire Barriers in Order to Install Various Mods. Fire Watches Posted & Fire Detection Tests Completed ML20248F3001988-12-31031 December 1988 10CFR50.59(b) Rept of Changes,Tests & Experiments Completed in 1988 ML20246E2711988-12-31031 December 1988 Con Edison 1988 Annual Rept ML20196D3011988-10-31031 October 1988 Reactor Vessel Matl Surveillance Program for Indian Point Unit 2 Analysis of Capsule V ML20155H2541988-09-30030 September 1988 Rev 2 to Indian Point Unit 2 (NRC Bulletin 88-008 Thermal Stresses in Piping Connected to RCS) Indentification of Unisolable Piping & Determination of Insp Locations ML20154M5661988-08-31031 August 1988 Monthly Operating Rept for Aug 1988 for Indian Point Station Unit 2 ML20154M5691988-07-31031 July 1988 Revised Page to Monthly Operating Rept for Jul 1988 for Indian Point Station Unit 2 ML20151N7881988-07-31031 July 1988 Rev 1 to Charpy Toughness & Brittle Transition Temp Characterization of HAZ High Hardness Zone of Indian Point Unit 2 Steam Generator Girth Weld by Gleeble Weld Thermal Cycle Simulation ML20006B4741988-05-31031 May 1988 Nonproprietary Indian Point Unit 2 Evaluation for Tube Vibration Induced Fatigue. ML20151N7821988-05-31031 May 1988 Fracture Sensitivity Study of Girth Weld 6 Repaired Configuration,Indian Point Unit 2 ML20153F9161988-04-28028 April 1988 Changes,Tests & Experiments - 1986 ML20151T4681988-01-31031 January 1988 Experimental & Finite Element Evaluation of Spent Fuel Rack Damping & Stiffness 1999-02-09
[Table view] |
Text
. - -
. 3 l *- .
?
s
~
N y
~
OPERATING DATA REPORT '
y s c DOCKET NO. 50-286 DATE 12-1-a2 COMPLETED BY L. Auterito s
TELEPHONE (9141 710-8200 I
OPERATING STATUS s.
~
Indian Point No. 3 nuclear powe,. pl,nt otes .
- 1. Unit Name: ~
- 2. Reporting Period: Novonber 1982
+
- 3. Licensed Ther.at Power (MWt): 3025 -
- 4. Nameplate Rating (Gross MWe): 1013 -
s
- 5. Design Electrical Rating (Net StWe): 965 . 3 . ,
U~
- 6. Mulmum Dependable Capacity (Gross MWe): 9M
- 7. Maximum Dependable Capacity (Net MWe): 891 _
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Ressons:
l ^-"
- 9. Power Level To Which Restricted. lf Any (Net MWG: '
- 10. Reasons For Restricticas,if Any:
\
,.L ,
' 7 '. . .
This M[ nth \ Yr..to.Date Cumulative' ?
s ,
[_
I 720 8,016.0 54,a17.0
- 11. Hours In Reporting Period l* 0 * '
1,984.0 34.090.8
- 12. Number Of Hours Reactor Was Critical -
-0 jM 0 0
- 43. Reactor Reserve Shutdown Hours -
0 'i ' '1,969.6 32,913.1 I4. Hours Generator On.Line
( --15. Unit Reserve Shutdown Hours 0 ,% 0 0 0 5,060,030 86,143;401
- 16. %ss Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWil) 0 1,502,170 26.298.300
- 18. Net Electrical Energy Generated (MWH) 0 1,436,036 25,193,443 _w 0 24.6 60.0 ,
- 19. Unit Service Factor "
- h. Unit Availability Factor 0'* 24.6 c0.0 0 20.1 51.6
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net) --
0 --
18.6 47.6
^
- 23. Unit Forced Outage Rate " 0 u _. 2.3 14.3
- 34. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duratica of Each): ,
Rofuolino Outane in Pronress.
~
Ulmn. completion of scheduled
- 25, If Shut Down At End Of Report Period. Estimated Date of Startup: miDtenance Est. dato ( Foin. a3)
- 26. Units In Test Status (Prior to Commercial Operation): ,
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY l COMMERCIAL CPERATION .
8212140070 821209 '
PDR ADOCK 05000286 R pgg ,
-- . . _ _ _ _ . . ~ , . _ , _ _ '. t/771
.y AVERAGE DAILY UNIT POWER LEVEL l . .
DOCKET NO. _50-286 Indian Point s UNIT Mn 3 4
', DATE _12-1-82 COMPLETED BY L. Auterino
. TELEPHONE (914) 739-8200 MONTH November 1982 DAY- AVERAGE DAILY POWER LEVEL DAY /
AVERAGE DAILY POWER LEVEL (MWe-Net) (ywe. Net) 1 0 o 37 2 0 gg o 3 0 0 39 4 0 20 0 5 0 0 21 6 0 0 22 9
n . 0 ..
8 0 0 24 l
9 0 0
. 25 l' 10 0 26 0 .
t II 0 0 .
k, 27 t
.^ '
' L O 0 12 28
]
13 0 '
0 29 I4 _0- 30 0 15 0
- 33
,e~
16 0 s
- ~
~> INSTRUCTI,0NS s C" On this format. list the average Jaily unit power level in MWe. Net for each day in the reporting month. Compute to the nearest whole megawatt.
k
> - (9/77) 4 s c , "
- - - - - - .~ , ~ - > - . . - . . - - - - .
s DOCKET NO. 50-286 l UNIT SIlUTDOWNS AND POWER REDUCTIONS UNIT NAME Indian Point No. 3 DATE 12-1-82 -
COMPLETED BY L. Autt-rino REPORT MONTil November 1982 TELEPflONE foldi 719-8220 ,
g _
c r. 4 m3 5a
. .2 _e g g=x Licensee ev, c. Cause & Corrective -
Nii. Date g 3g ;; jg5 Event U? $3 Action to '
$E j@g Report *
}U , Preveni Recurrence ,
c -
i 04 820325 S 720 P&C N/A N/A N/A Unit in'a scheduled cycle III-IV refueling and maintenance outage.
, +
l N' s I 3 - .
3 4 F: Forced Reason: '
Method: Exhibit Inst ructions -
S: Scheduled
\
A-Equipment Failure (Explain) !-Manual for Preparation of Dari '
B-Maintenance or Test 2-Manual Scram., Entry Sheets for Licensee
- C Refueling 3 Automatic Scram. Event Report (LER) File (NUREG-D Regulatory Restriction 4-Ot her ( Explain) 0161)
E-Operator Training & License Examination F Administrative 5 G-Operational Error (Expbin) Exhibit , Same Source (9/77) 1101her (Explain)
S 9
, , ?
MONTilLY MAINTENANCE REPORT 9 November 1982 Month .
L'p a 0,'CE EQUIPMENT - MALFUNCTION CORRECTIVE ACTION -
r-Feedwater Regulator Valves Planned Inspection ! Valves rebuilt -
I-2808 9-28-82 I-3030 10-1-82 Fan Cooler Unit #32 Clevis Pins Binding % Cleaned and lubricated pins B Damper 's I-3033 10-2-82 Fan Cooler Unit #34 Clevis Pins Binding Cleaned and lubricated pins- ~ [
B and D Damper I-3218 11-10-82 Service Water Valve SWN-44 Valve shaft seals leaking Replaced valve outlet of fan cooler y unit #32 I-3196 11-15-82 Boric Acid Transfer Mechanical Seal leaking Replaced seal pump #32
' Rotating element installed in I-2648 11-22-82 Sys e Service Water Pump Planned maintenance Service Water pump #35 I-3240 11-30-82 Fan Cooler Unit #32 Hose leaking Replaced hose -
O 9 ,
i .
1 e
, e e:
F
MONTilLY I & C CATEGORY I REPORT November 1982 Month .
Date l W.R. # Equipment Malfunction Corrective Action IC-1-1487-2 9/20/82 Reactor coolant pump seal Transmitters leaking Replaced transmitters with new water flow transmitters units from stock FI-ll6, FI-143, FI-144, FI-ll5 IC-1-1720-2 10/28/82 Accoustic monitor Channel Constant alarm displayed Repaired BNC connectors on 5 charge pre-amp and accelero-meter IC-1-1805-2 10/15/82 . Instrument Air Compressor Switch defective Replaced temperature switch
- 32 temperature switch TC-1107S IC-1-1817-2 10/25/82 Service water pump IIi-Lo Constant alarm displayed Replaced pressure switch alarm. Pressure control switch PC-llll IC-1-1854-2 11/8/82 Source vault area radia- Improper reading Repaired broken high tion monitor, RE-315 Voltage lead at detector l
SUMMARY
OF OPERATING EXPERIENCE Indian Point Unit 3 remained shutdown for the entire reporting period.
' Unit repairs, modifications and preventive maintenance. is: proceeding as-scheduled.
Steam generator sleeving and girth weld repairs are in progress and proceeding as scheduled.