OPERATING DATA REPORT

~

s c

y DOCKET NO. 50-286 DATE 12-1-a2 COMPLETED BY L.

Auterito TELEPHONE (9141 710-8200 s

OPERATING STATUS s.

I

~

otes

1. Unit Name:

Indian Point No. 3 nuclear powe,. pl,nt

~

2. Reporting Period:

Novonber 1982

3. Licensed Ther.at Power (MWt):

3025

+

4. Nameplate Rating (Gross MWe):

1013 s

965 3

5. Design Electrical Rating (Net StWe):
6. Mulmum Dependable Capacity (Gross MWe):

9M U~

891

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Ressons:

l ^-

9. Power Level To Which Restricted. lf Any (Net MWG:
10. Reasons For Restricticas,if Any:

\\

,.L 7

This M[ nth \\

Yr..to.Date Cumulative'

?

s l*

11. Hours In Reporting Period 720

[_

8,016.0 54,a17.0 I

12. Number Of Hours Reactor Was Critical 1,984.0 34.090.8 0 *
43. Reactor Reserve Shutdown Hours

-0 jM 0

0 0

'i ' '1,969.6 32,913.1

(

I4. Hours Generator On.Line 0

0 0

--15. Unit Reserve Shutdown Hours 0

5,060,030 86,143;401

16. %ss Thermal Energy Generated (MWH) 0 1,502,170 26.298.300
17. Gross Electrical Energy Generated (MWil) 0 1,436,036 25,193,443

_ w

18. Net Electrical Energy Generated (MWH) 0 24.6 60.0,
19. Unit Service Factor 0'*

24.6 c0.0

h. Unit Availability Factor 0

20.1 51.6

21. Unit Capacity Factor (Using MDC Net) 18.6 47.6 0
22. Unit Capacity Factor (Using DER Net)

^

0 u _.

2.3 14.3

23. Unit Forced Outage Rate
34. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duratica of Each):

Rofuolino Outane in Pronress.

~

Ulmn. completion of scheduled dato ( Foin. a3) 25, If Shut Down At End Of Report Period. Estimated Date of Startup: miDtenance Est.

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY l

COMMERCIAL CPERATION 8212140070 821209 PDR ADOCK 05000286 R

pgg

'. t/771

~,. _, _

.y AVERAGE DAILY UNIT POWER LEVEL l

DOCKET NO. _50-286 Indian Point UNIT Mn 3 s

4 DATE _12-1-82 COMPLETED BY L.

Auterino TELEPHONE (914) 739-8200 MONTH November 1982 DAY-AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL

/

(MWe-Net)

(ywe. Net) 1 0

o 37 2

0 gg o

3 0

39 0

4 0

20 0

5 0

0 21 6

0 22 0

. 0..

9 n

8 0

0 24 l

9 0

25 0

l' 10 0

26 0

t k,

II 0

0 27 t

.^ '

L O

0 12

]

28 13 0

0 29 I4

_ 0 -

30 0

15 0

33

,e~

16 0

s

- ~

~> INSTRUCTI,0NS C"

On this format. list the average Jaily unit power level in MWe. Net for each day in the reporting month. Compute to s

the nearest whole megawatt.

k (9/77) 4 s

c

.~

~

s l

UNIT SIlUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-286 UNIT NAME Indian Point No. 3 DATE 12-1-82 REPORT MONTil November 1982 COMPLETED BY L.

Autt-rino TELEPflONE foldi 719-8220 g

4 m3 5

c r.

.2 _e g

g=x Licensee ev, c.

Cause & Corrective a

Nii.

Date g

3g jg5 Event U?

$3 Action to

$E 5

j@g Report

  • E0

}U Preveni Recurrence c

i 04 820325 S

720 P&C N/A N/A N/A Unit in'a scheduled cycle III-IV refueling and maintenance outage.

+

l N'

s I

3 3

4 F: Forced Reason:

\\

Method:

Exhibit Inst ructions -

S: Scheduled A-Equipment Failure (Explain)

!-Manual for Preparation of Dari B-Maintenance or Test 2-Manual Scram.,

Entry Sheets for Licensee

  • C Refueling 3 Automatic Scram.

Event Report (LER) File (NUREG-D Regulatory Restriction 4-Ot her ( Explain) 0161)

E-Operator Training & License Examination F Administrative 5

G-Operational Error (Expbin)

Exhibit, Same Source (9/77) 1101her (Explain)

S 9

?

MONTilLY MAINTENANCE REPORT 9

November 1982 Month L'p a 0,'CE EQUIPMENT MALFUNCTION CORRECTIVE ACTION r-I-2808 9-28-82 Feedwater Regulator Valves Planned Inspection Valves rebuilt I-3030 10-1-82 Fan Cooler Unit #32 Clevis Pins Binding Cleaned and lubricated pins B Damper

's I-3033 10-2-82 Fan Cooler Unit #34 Clevis Pins Binding Cleaned and lubricated pins- ~ [

B and D Damper I-3218 11-10-82 Service Water Valve SWN-44 Valve shaft seals leaking Replaced valve outlet of fan cooler y

unit #32 I-3196 11-15-82 Boric Acid Transfer Mechanical Seal leaking Replaced seal pump #32 I-2648 11-22-82 Sys e Service Water Pump Planned maintenance Rotating element installed in Service Water pump #35 I-3240 11-30-82 Fan Cooler Unit #32 Hose leaking Replaced hose O

9 i

1 e

e e:

F

MONTilLY I & C CATEGORY I REPORT November 1982 Month Date l

W.R.

Equipment Malfunction Corrective Action IC-1-1487-2 9/20/82 Reactor coolant pump seal Transmitters leaking Replaced transmitters with new water flow transmitters units from stock FI-ll6, FI-143, FI-144, FI-ll5 IC-1-1720-2 10/28/82 Accoustic monitor Channel Constant alarm displayed Repaired BNC connectors on j

l 5

charge pre-amp and accelero-meter IC-1-1805-2 10/15/82 Instrument Air Compressor Switch defective Replaced temperature switch

  1. 32 temperature switch TC-1107S IC-1-1817-2 10/25/82 Service water pump IIi-Lo Constant alarm displayed Replaced pressure switch alarm. Pressure control switch PC-llll IC-1-1854-2 11/8/82 Source vault area radia-Improper reading Repaired broken high tion monitor, RE-315 Voltage lead at detector l

SUMMARY

OF OPERATING EXPERIENCE Indian Point Unit 3 remained shutdown for the entire reporting period.

' Unit repairs, modifications and preventive maintenance. is: proceeding as-scheduled.

Steam generator sleeving and girth weld repairs are in progress and proceeding as scheduled.