. 3 l *-
?
s
~
N y
OPERATING DATA REPORT
~
s c
y DOCKET NO. 50-286 DATE 12-1-a2 COMPLETED BY L.
Auterito TELEPHONE (9141 710-8200 s
OPERATING STATUS s.
I
~
otes
- 1. Unit Name:
Indian Point No. 3 nuclear powe,. pl,nt
~
- 2. Reporting Period:
Novonber 1982
- 3. Licensed Ther.at Power (MWt):
3025
+
- 4. Nameplate Rating (Gross MWe):
1013 s
965 3
- 5. Design Electrical Rating (Net StWe):
- 6. Mulmum Dependable Capacity (Gross MWe):
9M U~
891
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Ressons:
l ^-
- 9. Power Level To Which Restricted. lf Any (Net MWG:
- 10. Reasons For Restricticas,if Any:
\\
,.L 7
This M[ nth \\
Yr..to.Date Cumulative'
?
s l*
- 11. Hours In Reporting Period 720
[_
8,016.0 54,a17.0 I
- 12. Number Of Hours Reactor Was Critical 1,984.0 34.090.8 0 *
- 43. Reactor Reserve Shutdown Hours
-0 jM 0
0 0
'i ' '1,969.6 32,913.1
(
I4. Hours Generator On.Line 0
0 0
--15. Unit Reserve Shutdown Hours 0
5,060,030 86,143;401
- 16. %ss Thermal Energy Generated (MWH) 0 1,502,170 26.298.300
- 17. Gross Electrical Energy Generated (MWil) 0 1,436,036 25,193,443
_ w
- 18. Net Electrical Energy Generated (MWH) 0 24.6 60.0,
- 19. Unit Service Factor 0'*
24.6 c0.0
- h. Unit Availability Factor 0
20.1 51.6
- 21. Unit Capacity Factor (Using MDC Net) 18.6 47.6 0
- 22. Unit Capacity Factor (Using DER Net)
^
0 u _.
2.3 14.3
- 23. Unit Forced Outage Rate
- 34. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duratica of Each):
Rofuolino Outane in Pronress.
~
Ulmn. completion of scheduled dato ( Foin. a3) 25, If Shut Down At End Of Report Period. Estimated Date of Startup: miDtenance Est.
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY l
COMMERCIAL CPERATION 8212140070 821209 PDR ADOCK 05000286 R
pgg
'. t/771
~,. _, _
.y AVERAGE DAILY UNIT POWER LEVEL l
DOCKET NO. _50-286 Indian Point UNIT Mn 3 s
4 DATE _12-1-82 COMPLETED BY L.
Auterino TELEPHONE (914) 739-8200 MONTH November 1982 DAY-AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL
/
(MWe-Net)
(ywe. Net) 1 0
o 37 2
0 gg o
3 0
39 0
4 0
20 0
5 0
0 21 6
0 22 0
. 0..
9 n
8 0
0 24 l
9 0
25 0
l' 10 0
26 0
t k,
II 0
0 27 t
.^ '
L O
0 12
]
28 13 0
0 29 I4
_ 0 -
30 0
15 0
33
,e~
16 0
s
- ~
~> INSTRUCTI,0NS C"
On this format. list the average Jaily unit power level in MWe. Net for each day in the reporting month. Compute to s
the nearest whole megawatt.
k (9/77) 4 s
c
.~
~
s l
UNIT SIlUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-286 UNIT NAME Indian Point No. 3 DATE 12-1-82 REPORT MONTil November 1982 COMPLETED BY L.
Autt-rino TELEPflONE foldi 719-8220 g
4 m3 5
c r.
.2 _e g
g=x Licensee ev, c.
Cause & Corrective a
Nii.
Date g
3g jg5 Event U?
$3 Action to
$E 5
j@g Report
- E0
}U Preveni Recurrence c
i 04 820325 S
720 P&C N/A N/A N/A Unit in'a scheduled cycle III-IV refueling and maintenance outage.
+
l N'
s I
3 3
4 F: Forced Reason:
\\
Method:
Exhibit Inst ructions -
S: Scheduled A-Equipment Failure (Explain)
!-Manual for Preparation of Dari B-Maintenance or Test 2-Manual Scram.,
Entry Sheets for Licensee
- C Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D Regulatory Restriction 4-Ot her ( Explain) 0161)
E-Operator Training & License Examination F Administrative 5
G-Operational Error (Expbin)
Exhibit, Same Source (9/77) 1101her (Explain)
S 9
?
MONTilLY MAINTENANCE REPORT 9
November 1982 Month L'p a 0,'CE EQUIPMENT MALFUNCTION CORRECTIVE ACTION r-I-2808 9-28-82 Feedwater Regulator Valves Planned Inspection Valves rebuilt I-3030 10-1-82 Fan Cooler Unit #32 Clevis Pins Binding Cleaned and lubricated pins B Damper
's I-3033 10-2-82 Fan Cooler Unit #34 Clevis Pins Binding Cleaned and lubricated pins- ~ [
B and D Damper I-3218 11-10-82 Service Water Valve SWN-44 Valve shaft seals leaking Replaced valve outlet of fan cooler y
unit #32 I-3196 11-15-82 Boric Acid Transfer Mechanical Seal leaking Replaced seal pump #32 I-2648 11-22-82 Sys e Service Water Pump Planned maintenance Rotating element installed in Service Water pump #35 I-3240 11-30-82 Fan Cooler Unit #32 Hose leaking Replaced hose O
9 i
1 e
e e:
F
MONTilLY I & C CATEGORY I REPORT November 1982 Month Date l
W.R.
Equipment Malfunction Corrective Action IC-1-1487-2 9/20/82 Reactor coolant pump seal Transmitters leaking Replaced transmitters with new water flow transmitters units from stock FI-ll6, FI-143, FI-144, FI-ll5 IC-1-1720-2 10/28/82 Accoustic monitor Channel Constant alarm displayed Repaired BNC connectors on j
l 5
charge pre-amp and accelero-meter IC-1-1805-2 10/15/82 Instrument Air Compressor Switch defective Replaced temperature switch
- 32 temperature switch TC-1107S IC-1-1817-2 10/25/82 Service water pump IIi-Lo Constant alarm displayed Replaced pressure switch alarm. Pressure control switch PC-llll IC-1-1854-2 11/8/82 Source vault area radia-Improper reading Repaired broken high tion monitor, RE-315 Voltage lead at detector l
SUMMARY
OF OPERATING EXPERIENCE Indian Point Unit 3 remained shutdown for the entire reporting period.
' Unit repairs, modifications and preventive maintenance. is: proceeding as-scheduled.
Steam generator sleeving and girth weld repairs are in progress and proceeding as scheduled.
P f
i I
1
?
i
+. - - - -
.w--
y y
+ -
.-w
~, -,
1
-m-.
,e-.-
e --
-x-
--- -